The Energy Bills Relief Act would reinstate clean energy tax credits and grants, reform electric transmission planning and siting under FERC, expand low-income energy and weatherization assistance, restrict natural gas exports, and enhance community engagement in environmental reviews.
Who it affects
This bill directly affects low-income households and energy consumers; electric utilities, transmission owners, and regional grid operators (RTOs/ISOs); renewable energy, storage, and advanced transmission developers; fossil fuel producers and natural gas exporters; domestic manufacturers of transformers and electrical components; state public utility commissions; Indian Tribes and local communities near energy infrastructure; and federal agencies including FERC, the Department of Energy, the Department of the Interior, and the Environmental Protection Agency.
Based on the Introduced in House text · gemini-3.8-flash
Generated October 5, 2026 · Read the official text on Congress.gov
Your Vote
1 key actions of 2: Congress.gov's major actions and roll-call votes.
Introduced in House
Recorded by: Library of Congress
Sections of law the bill's Introduced in House text would amend, repeal or add to, found in the bill's own text. US Code current through Public Law 119-142.
Explanations are AI-generated from the bill text and the current US Code and not reviewed by a person. They may contain errors; the bill's instruction and the current text are shown so you can check them. How explanations are made
- Amends
43 U.S.C. 1337
Leases, easements, and rights-of-way on the outer Continental Shelf
Subsections (p)
Current law requires the Secretary of the Interior to ensure that energy and related activities on the outer Continental Shelf balance factors including safety, environmental protection, resource conservation, coordination with federal agencies, fair return, national security, and non-interference with other uses of the sea. The bill would amend paragraph (4) of subsection (p) by requiring the Secretary to also coordinate with Tribal, State, and local governments; protect the energy generation potential of other offshore renewable energy leases; consider scientific observation platforms (such as buoys) and fishery surveys when evaluating other ocean uses; and consider applicable Federal, Tribal, and State renewable energy mandates, targets, and goals.
The bill's instruction
Section 8(p) of the Outer Continental Shelf Lands Act (43 U.S.C. 1337(p)) is amended by striking paragraph (4) and inserting the following: “ (4) Requirements The Secretary shall ensure that any activity under this subsection is carried out in a manner that provides for a balance of— (A) safety; (B) the protection of the environment; (C) the prevention of waste; (D) the conservation of the natural resources of the outer Continental Shelf; (E) coordination with relevant Federal agencies and Tribal, State, and local governments; (F) the protection of the national security interests of the United States, including energy security; (G) the protection of correlative rights in the outer Continental Shelf, including the energy generation potential of other offshore renewable energy leases; (H) a fair return to the United States for any lease, easement, or right-of-way under this subsection; (I) prevention of unreasonable interference with other uses of the exclusive economic zone, the high seas, and the territorial seas, as determined by the Secretary; (J) consideration of— (i) the location of, and any schedule relating to, a lease, easement, or right-of-way for an area of the outer Continental Shelf; and (ii) any other use of the sea or seabed, including use for a fishery or fishery survey, a sealane, a regional coastal observing system or other scientific observation platform such as a buoy, a potential site of a deepwater port, or navigation; (K) public notice and comment on any proposal submitted for a lease, easement, or right-of-way under this subsection; (L) the oversight, inspection, research, monitoring, and enforcement relating to a lease, easement, or right-of-way under this subsection; and (M) the consideration of any applicable Federal, Tribal, and State renewable energy mandates, targets, and goals. . ”
Also changed by S. 5653, H.R. 10318, H.R. 10256, H.R. 9358, S. 4765
- Amends
43 U.S.C. 1702
Definitions
Subsections (c)
Current law defines "multiple use" management of public lands as a combination of balanced uses that includes recreation, range, timber, minerals, watershed, wildlife and fish, and natural scenic, scientific, and historical values. The bill would amend this definition to explicitly include the generation, transmission, and storage of renewable energy sources such as wind, solar, and geothermal energy as part of those values.
The bill's instruction
in section 103(c) (43 U.S.C. 1702(c)), by striking “historical values;” and inserting “historical values, including the generation, transmission, and storage of renewable energy sources such as wind, solar, and geothermal energy;”; and
Also changed by S. 2262
- Amends
43 U.S.C. 1732
Management of use, occupancy, and development of public lands
Current law establishes general requirements for the Secretary of the Interior to manage the use, occupancy, and development of public lands under principles of multiple use and sustained yield. The bill would add subsection (e) directing the Secretary to manage public lands to facilitate the generation, transmission, and storage of renewable energy resources. It would also specify that these renewable energy activities are deemed consistent with multiple-use management under the Federal Land Policy and Management Act of 1976.
The bill's instruction
in section 302 (43 U.S.C. 1732), by inserting at the end “(e) The Secretary shall manage the public lands to facilitate the generation, transmission, and storage of renewable energy resources, consistent with the principles of multiple use and sustained yield under this Act. For the purposes of this Act, such activities are deemed to be consistent with multiple-use management.”.
- Amends
43 U.S.C. 1331
Definitions
Current law defines various terms used in the Outer Continental Shelf Lands Act, including terms for minerals, the marine environment, and carbon sequestration. The bill would correct an existing duplicate subsection numbering by redesignating the second subsection (r) (defining "State") as subsection (t) and adding a heading. It would also add subsection (u) to define an "offshore renewable energy project" as a project related to wind, solar, wave, or tidal energy authorized under section 8(p)(1)(C).
The bill's instruction
Section 2 of the Outer Continental Shelf Lands Act (43 U.S.C. 1331) is amended— (1) in the second subsection (r), as added by section 50251(b)(1)(A)(iv) of Public Law 117–169— (A) by redesignating such subsection (r) as subsection (t); and (B) by inserting after the enumerator “State.—”; and (2) by adding at the end the following: “ (u) Offshore renewable energy project The term offshore renewable energy project means a project to carry out an activity described in section 8(p)(1)(C) related to wind, solar, wave, or tidal energy. .”
Also changed by H.R. 10789, S. 5654, S. 4715, H.R. 9034, H.R. 6068
- Amends
43 U.S.C. 1332
Congressional declaration of policy
Current law declares congressional policy regarding the outer Continental Shelf, stating it should be made available for expeditious and orderly development with environmental safeguards and consistent with competition and national needs. The bill would amend paragraph (3) to provide that development of the shelf must include supporting the generation, transmission, and storage of zero-emission electricity and achieving State and Federal zero-emission or renewable energy goals. It would also add a new policy provision stating that identifying and developing lease areas for offshore renewable projects should occur through an open stakeholder process involving diverse ocean users and Federal, State, Tribal, and local governments.
The bill's instruction
Section 3 of the Outer Continental Shelf Lands Act (43 U.S.C. 1332) is amended— (1) by amending paragraph (3) to read as follows: “ (3) the outer Continental Shelf is a vital national resource reserve held by the Federal Government for the public, which can be made available for orderly development, subject to environmental safeguards and coexistence with other ocean users, in a manner which includes— (A) supporting the generation, transmission, and storage of zero-emission electricity; and (B) the maintenance of competition and other national needs, including the need to achieve State and Federal zero-emission electricity or renewable energy mandates, targets, and goals; ;” (2) by redesignating paragraphs (5) and (6) as paragraphs (6) and (7), respectively; and (3) by inserting after paragraph (4) the following: “ (5) the identification and development of lease areas for offshore renewable energy projects should be determined by a robust and transparent stakeholder process that incorporates engagement and input from a diverse group of ocean users and other impacted stakeholders, and Federal, State, Tribal, and local governments; .”
Also changed by H.R. 3742
- Amends
43 U.S.C. 1341
Reservation of lands and rights
Subsections (a)
Current law allows the President to withdraw unleased lands of the outer Continental Shelf from disposition at any time. The bill would restate this presidential withdrawal authority under paragraph (1) and add paragraph (2), which restricts the President's ability to reverse such a withdrawal. Reversals would only be allowed for offshore renewable energy leasing and only if the President determines that changes in environmental, national security, or energy conditions make the reversal in the public interest.
The bill's instruction
Section 12(a) of the Outer Continental Shelf Lands Act (43 U.S.C. 1341(a)) is amended to read as follows— “ (a) Withdrawal of unleased lands by the President (1) In general The President of the United States may, from time to time, withdraw from disposition any of the unleased lands of the outer Continental Shelf. (2) Reversal for certain offshore renewable energy projects With respect to a withdrawal under paragraph (1) of unleased lands from disposition, the President may reverse such a withdrawal only to allow for leasing under section (8)(p)(1)(C) and only if the President determines that environmental, national security, or national or regional energy conditions or demands have changed such that a reversal would be in the public interest. .”
- Amends
43 U.S.C. 1349
Citizens suits, jurisdiction and judicial review
Subsections (c)(2)
Current law channels judicial review of decisions by the Secretary of the Interior approving, modifying, or disapproving outer Continental Shelf exploration or development and production plans directly to a United States court of appeals where an affected State is located. The bill would amend this provision to also subject any plan, final lease, easement, or right-of-way granted for energy-related activities under section 8(p)(1)—as well as related final Federal agency actions—to direct review solely in the United States court of appeals for a circuit containing an affected State.
The bill's instruction
Section 23(c)(2) of the Outer Continental Shelf Lands Act (43 U.S.C. 1349(c)(2)) is amended to read as follows: “ (2) Any action of the Secretary to approve, require modification of, or disapprove any exploration plan or development and production plan under this Act, or any plan, final lease, easement, or right-of-way granted pursuant to section (8)(p)(1) (and any related final Federal agency actions), shall be subject to judicial review only in a United States court of appeals for a circuit in which an affected State is located. .”
- Amends
30 U.S.C. 1005
Lease term and work commitment requirements
Current law establishes term lengths, extension criteria, and work commitment requirements for federal geothermal leases. The bill would add subsection (j), allowing the Secretary of the Interior through September 30, 2033, to require geothermal lease applicants and holders to reimburse the federal government for reasonable administrative costs incurred while processing applications and permits, as well as inspecting and monitoring exploration, drilling, reclamation, and facility operations. The Secretary would be allowed to reduce costs under certain economic conditions, and collected funds would be used to offset application and monitoring costs subject to appropriations.
The bill's instruction
Section 6 of the Geothermal Steam Act of 1970 (30 U.S.C. 1005) is amended by adding at the end the following: “ (j) Cost recovery (1) In general During the period that begins on the date of enactment of this subsection and ends September 30, 2033, the Secretary may require an applicant for, or a holder of, a geothermal lease to reimburse the United States for all reasonable administrative and other costs incurred by the United States from— (A) processing the application for the geothermal lease, including any application for an operations plan, geothermal drilling permit, utilization plan, site license, facility construction permit, commercial use permit, and any other approval associated with a geothermal lease; and (B) inspecting and monitoring— (i) geophysical exploration activities; (ii) the drilling, plugging, and abandonment of wells; and (iii) the construction, operation, termination, and reclamation of any well site or facility for the utilization of geothermal resources pursuant to the geothermal lease. (2) Considerations In determining whether to require reimbursement under paragraph (1), the Secretary shall consider whether there is in existence a cooperative cost share agreement between the United States and the holder of a geothermal lease. (3) Adjustments The Secretary may reduce the amount to be reimbursed under paragraph (1) if the Secretary determines— (A) that full reimbursement would impose an economic hardship on the applicant; or (B) that a less than full reimbursement is necessary to promote the greatest use of geothermal resources. (4) Use The amounts reimbursed under this subsection shall be credited to the currently applicable appropriation, account, or fund of the Department of the Interior as discretionary offsetting collections, and shall be available only to the extent provided in advance in appropriations Acts for— (A) processing the application for geothermal leases, including any application for operations plans, geothermal drilling permits, utilization plans, site licenses, facility construction permits, commercial use permits, and any other approval associated with geothermal leases; and (B) inspecting and monitoring— (i) geophysical exploration activities; (ii) the drilling, plugging, and abandonment of wells; and (iii) the construction, operation, termination, and reclamation of any well site or facility for the utilization of geothermal resources pursuant to geothermal leases. .”
Also changed by S. 5653, S. 4795, S. 4605, H.R. 5631, H.R. 2347
- Amends
15 U.S.C. 717b
Exportation or importation of natural gas; LNG terminals
Current law authorizes the Federal Energy Regulatory Commission (and the Department of Energy) to review and authorize the import or export of natural gas, providing that exports must be approved unless they are found inconsistent with the public interest. The bill would add subsection (g) to establish new requirements for exporting natural gas. Exporters would have to obtain an order from the Secretary of Energy, who could only grant it if the export is found consistent with the public interest. The Secretary could not make this finding if the export would significantly contribute to climate change, materially increase consumer energy prices or volatility, or create a disproportionate burden on Tribes or environmental justice communities. (Note: The provided text of the bill's amendment was truncated mid-sentence during the assessment criteria and was not available in full.)
The bill's instruction
Section 3 of the Natural Gas Act (15 U.S.C. 717b) is amended by adding at the end the following: “ (g) Exportation of natural gas (1) Order required No person shall export any natural gas from the United States to a foreign country without first having secured an order of the Secretary of Energy authorizing it to do so. The Secretary of Energy may issue such order upon application only if, after opportunity for hearing, the Secretary of Energy finds that the proposed exportation will be consistent with the public interest. The Secretary of Energy may by its order grant such application, in whole or in part, with such modification and upon such terms and conditions as the Secretary of Energy may find necessary or appropriate, and may from time to time, after opportunity for hearing, and for good cause shown, issue such supplemental order for such exportation as it may find necessary or appropriate. (2) Deadline The Secretary of Energy shall find whether proposed exportation of natural gas will be consistent with the public interest under paragraph (1) by not later than the date that is 1 year after the later of— (A) the date on which the Secretary of Energy receives the final environmental impact statement for such proposed exportation from the Federal Energy Regulatory Commission; and (B) the date on which the Secretary completes each assessment required by paragraph (4). (3) Public interest finding The Secretary of Energy may find that proposed exportation of natural gas for which an application is submitted under paragraph (1) will be consistent with the public interest under such paragraph only if the Secretary of Energy determines, based on the applicable assessment under paragraph (4), that the proposed exportation of natural gas will not be likely to— (A) significantly contribute to climate change, including by slowing the global energy transition needed to achieve deep reductions of global greenhouse gas emissions within the next decade and net-zero global greenhouse gas emissions not later than 2050; (B) materially increase energy prices or energy price volatility for any segment of United States consumers; or (C) create a disproportionate cumulative burden of adverse human or environmental impacts on Tribes and communities with environmental justice concerns, including in rural and urban low-income areas. (4) Assessments (A) Climate change assessment A determination under paragraph (3)(A) shall be based on an assessment of the expected impact of the proposed exportation of natural gas on climate change. Such assessment shall be based on the latest scientific information and use the 20-year global warming potential of methane, and shall include— (i) quantified estimates of the greenhouse gas emissions associated with the full lifecycle of the natural gas proposed for exportation, including emissions associated with the extraction, transportation, liquefaction, storage, regasification, and consumption of such natural gas; (ii) a comparison of the estimated greenhouse gas emissions in clause (i) to a baseline that is consistent with the need to achieve deep reductions of global greenhouse gas emissions within the next decade and deep decarbonization pathways toward net-zero global greenhouse gas emissions not later than 2050; (iii) an assessment of the potential effects of the proposed exportation of natural gas on clean energy alternatives, including— (I) any decrease in global investment in and deployment of renewable energy, electrification, and energy efficiency and conservation technologies; and (II) any decrease in United States exports of clean energy technologies; (iv) quantified estimates of the social cost of the estimated greenhouse gas emissions in clause (i); and (v) an identification of the extent to which climate change is accelerating the loss of economic value in the United States and, separately, in other countries, due to rising sea levels, more intense storms, eroding coasts, increased risk and severity of wildfires, and other impacts associated with climate change. (B) Economic assess
Also changed by S. 4765, S. 4735, S. 4475, H.R. 7061, H.R. 5814
- Amends
15 U.S.C. 717n
Process coordination; hearings; rules of procedure
Subsections (b)(1)
The bill updates a statutory reference in section 15(b)(1) by replacing "Commission" with "Federal Energy Regulatory Commission".
The bill's instruction
Section 15(b)(1) of the Natural Gas Act (15 U.S.C. 717n(b)(1)) is amended by striking “Commission” and inserting “Federal Energy Regulatory Commission”.
- Amends
42 U.S.C. 4370m
Definitions
Current law sets forth definitions for FAST-41 covered infrastructure projects and the federal permitting review process. The bill would redesignate paragraphs (2) through (18) as paragraphs (3) through (19) and add a new paragraph (2) defining "agency SCO" as an agency's senior community engagement officer.
The bill's instruction
Section 41001 of the FAST Act (42 U.S.C. 4370m) is amended— (A) by redesignating paragraphs (2) through (18) as paragraphs (3) through (19), respectively; and (B) by inserting after paragraph (1) the following: “ (2) Agency SCO The term agency SCO means the senior community engagement officer of an agency, as designated by the head of the agency under section 706(a)(1)(A) of the Energy Bills Relief Act. .”
Also changed by S. 4765, H.R. 9248, S. 4561, H.R. 8800, S. 4448
- Amends
42 U.S.C. 4370m-2
Permitting process improvement
Subsections (c)(2)(C)(i)
Current law directs the Executive Director of the Federal Permitting Improvement Steering Council to mediate disputes regarding project permitting timetables in consultation with project sponsors and agency chief environmental review and permitting officers (agency CERPOs). The bill would amend this provision to require the Executive Director to also consult with agency senior community engagement officers (agency SCOs) during timetable dispute mediations.
The bill's instruction
Section 41003(c)(2)(C)(i) of the FAST Act (42 U.S.C. 4370m–2(c)(2)(C)(i)) is amended by striking “agency CERPOs” and inserting “agency CERPOs, agency SCOs,”.
- Amends
42 U.S.C. 4370m-8
Funding for governance, oversight, and processing of environmental reviews and permits
Subsections (d)(3)
Current law authorizes the Executive Director to transfer money from the Environmental Review Improvement Fund to other agencies and state, Tribal, and local governments to facilitate timely and efficient environmental reviews and authorizations, including through agreements with agency CERPOs. The bill would amend paragraph (d)(3) to require that transfers facilitate early, meaningful community engagement in addition to timely reviews, and would allow these transfers to support direct reimbursement agreements with agency SCOs as well as agency CERPOs.
The bill's instruction
Section 41009(d)(3) of the FAST Act (42 U.S.C. 4370m–8(d)(3)) is amended— (A) by striking “facilitate timely” and inserting “facilitate early, meaningful community engagement and timely”; and (B) by inserting “and agency SCOs” after “agency CERPOs”.
- Amends
43 U.S.C. 3002
Program to improve eligible project permit coordination
Current law establishes Renewable Energy Coordination Offices within the Bureau of Land Management to coordinate federal permits for eligible energy projects on federal land. The bill would redesignate existing subsections (e) and (f) as (f) and (g) and add a new subsection (e). The new subsection allows the Secretary of the Interior to delegate the processing of wind and solar applications on Bureau of Land Management land directly to State Renewable Energy Coordination Offices, giving office managers leasing authority and the ability to hire experts funded by applicants, while generally prohibiting delegating this authority to field or district office employees.
The bill's instruction
Section 3102 of the Energy Act of 2020 (43 U.S.C. 3002) is amended— (A) by redesignating subsections (e) and (f) as subsections (f) and (g), respectively; and (B) by inserting after subsection (d) the following: “ (e) Processing of Wind and Solar energy applications (1) Delegation to State Renewable Energy Coordination Offices (A) In general Notwithstanding any other provision of law, the Secretary may delegate to a State Renewable Energy Coordination Office the authority to process applications for eligible projects proposed to be carried out on land managed by the Bureau of Land Management in the applicable State. (B) Roles and responsibilities of managers For purposes of processing applications described in subparagraph (A), the manager of the applicable State Renewable Energy Coordination Office— (i) shall have the authority to issue grants or leases for eligible projects; (ii) with the approval of the State Director of the applicable Bureau of Land Management State Office, may use other employees in field and district offices of the applicable Bureau of Land Management State Office, or hire additional experts, to assist with timely processing of applications, with the costs of hiring additional experts to be charged to applicants; and (iii) shall report to the State Director of the applicable Bureau of Land Management State Office. (2) Prohibition of delegation to employees of field or district offices Except as provided in paragraph (1)(B)(ii), the Secretary may not delegate to employees of field or district offices of the Bureau of Land Management the authority to process applications for eligible projects proposed to be carried out on land managed by the Bureau of Land Management. .”
- Amends
43 U.S.C. 3004
National goal for renewable energy production on Federal land
Current law directs the Secretary of the Interior to seek to permit at least 25 gigawatts of electricity from wind, solar, and geothermal projects on public land by not later than 2025. The bill would change this goal from 25 to 60 gigawatts and change the target date to December 31, 2035, while making the goal mandatory rather than aspirational by removing "seek to". The bill would also add subsection (c), directing the Secretary, in consultation with the Secretary of Agriculture and other agency heads, to update the national renewable energy production goals within 18 months.
The bill's instruction
Section 3104 of the Energy Act of 2020 (43 U.S.C. 3004) is amended— (1) in subsection (b)— (A) by striking “seek to”; (B) by striking “25” and inserting “60”; and (C) by striking “2025” and inserting “December 31, 2035”; and (2) by adding at the end the following: “ (c) Update Not later than 18 months after the date of enactment of this subsection, the Secretary, in consultation with the Secretary of Agriculture and the heads of other relevant Federal agencies, shall update the national goals for renewable energy production on Federal land established under subsection (a). .”
Also changed by H.R. 2301
- Amends
7 U.S.C. 8107a
Rural energy savings program
Current law authorizes the Secretary of Agriculture to provide zero-interest loans to eligible electric cooperatives and utilities, which then lend those funds to qualified rural consumers for energy efficiency upgrades. The bill would expand eligible entities to include Indian Tribes and authorize the Secretary to provide grants alongside loans. These grants could cover up to 5 percent of the loan amount (or 10 percent in persistent poverty counties) to help entities pay for program application and loan costs, repairs that facilitate efficiency improvements, and administrative duties. The bill also allows the Secretary to extend loan terms and advance repayment deadlines. (Note: The provided text of the bill's amendment was truncated in subsection (d) and was not available in full.)
The bill's instruction
Section 6407 of the Farm Security and Rural Investment Act of 2002 (7 U.S.C. 8107a) is amended— (1) in subsection (b)— (A) in paragraph (1)— (i) in subparagraph (B), by striking “or” at the end; (ii) by redesignating subparagraph (C) as subparagraph (D); and (iii) by inserting after subparagraph (B) the following: “ (C) any Indian Tribe (as defined in section 4 of the Indian Self-Determination and Education Assistance Act (25 U.S.C. 5304)); ;” (2) in subsection (c)— (A) in the subsection heading, by inserting “and grants” after “Loans”; (B) by striking paragraph (1) and inserting the following: “ (1) In general Subject to the requirements of this subsection, the Secretary shall provide— (A) loans to eligible entities that agree to use the loan funds to make loans under subsection (d) to qualified consumers for the purpose of implementing energy efficiency measures; and (B) at the election of any eligible entity that receives a loan under subparagraph (A), a grant in accordance with paragraph (10). ;” (C) in paragraph (2)— (i) in the paragraph heading, by inserting “for loans” after “Requirements”; and (ii) in subparagraph (A)(i), by striking “that is”; (D) in paragraph (5)— (i) by redesignating subparagraphs (A) and (B) as clauses (i) and (ii), respectively, and indenting the clauses appropriately; (ii) in the matter preceding clause (i) (as so redesignated), by striking “With respect to a loan under paragraph (1)” and inserting the following: “ (A) In general Subject to subparagraph (B), with respect to a loan under paragraph (1)(A) ; and” (iii) by adding at the end the following: “ (B) Extensions The Secretary may extend the term of a loan under subparagraph (A)(i), or the deadline for the repayment of an advance under subparagraph (A)(ii), as the Secretary determines to be appropriate. ;” (E) in paragraph (7)— (i) in subparagraph (B), by striking “paragraph (1)” and inserting “paragraph (1)(A)”; and (ii) in subparagraph (C), in the matter preceding clause (i), by striking “Repayment of the special advance” and inserting “Subject to an applicable extension under paragraph (5)(B), repayment of a special advance under this paragraph”; (F) in paragraph (8), by striking “paragraph (1)” and inserting “paragraph (1)(A)”; and (G) by adding at the end the following: “ (10) Grants (A) In general At the election of an eligible entity that receives a loan under this subsection, the Secretary shall provide to the eligible entity a grant to pay for a portion of the costs incurred in— (i) applying for the loan; (ii) making a loan to a qualified consumer under subsection (d); (iii) making repairs to the property of a qualified consumer that facilitate the energy efficiency measures for the property financed through a loan provided to the qualified consumer under subsection (d); (iv) entering into a contract under subsection (e); or (v) carrying out any other duties of the eligible entity under this section. (B) Amount (i) In general Except as provided in clause (ii), the amount of a grant provided to an eligible entity under this paragraph shall be equal to not more than 5 percent of the amount of the loan provided to the eligible entity under this subsection. (ii) Persistent poverty counties The amount of a grant provided under this paragraph to an eligible entity that will use the grant to make loans under subsection (d) to qualified consumers located in a persistent poverty county (as determined by the Secretary) shall be equal to 10 percent of the amount of the loan provided to the eligible entity under this subsection. ;” (3) in subsection (d)— (A) in paragraph (1)— (i) in the matter preceding subparagraph (A), by inserting “or grant” before “funds”; and (ii) in subparagraph (B)— (I) by striking “(B) shall finance” and inserting the following: “ (B)(i) may have a term and amortization schedule the length of which is the useful life of the energy efficiency measures implemented using the loan, provided that the loan to th
- Amends
42 U.S.C. 7178
Federal Energy Regulatory Commission fees and annual charges
Current law directs the Federal Energy Regulatory Commission to assess and collect fees and annual charges from regulated entities to offset the Commission's annual incurred costs. The bill would add subsection (h), requiring the Commission to review its fees and charges at least once every 5 years to verify whether they are sufficient to manage its workload expeditiously.
The bill's instruction
Section 3401 of the Omnibus Budget Reconciliation Act of 1986 (42 U.S.C. 7178) is amended by adding at the end the following: “ (h) Review Not less often than once every 5 years, the Commission shall undertake a review to determine if the fees and charges it assesses under this section and other laws are sufficient to allow the Commission to handle its workload in an expedient manner. .”
- Amends
42 U.S.C. 6864d
Financial assistance for WAP enhancement and innovation
Current law terminates the authority of the Secretary of Energy to award financial assistance under the Weatherization Assistance Program enhancement and innovation initiative after September 30, 2025. The bill would strike subsection (k), removing the September 30, 2025 expiration date on the Secretary's authority to grant this financial assistance.
The bill's instruction
Section 414D of the Energy Conservation and Production Act (42 U.S.C. 6864d) is amended by striking subsection (k).
- Amends
42 U.S.C. 6865
Limitations on financial assistance
Subsections (c)(1), (c)(2), (c)
Current law limits the average federal expenditure for weatherizing a dwelling to $6,500 (subject to annual inflation adjustments), places a 15-year restriction on re-weatherizing homes that previously received federal weatherization assistance, and limits renewable energy expenditures to an average of $3,000 per dwelling unit. The bill would raise the average expenditure limit per dwelling to $12,000. It would remove the restriction against re-weatherizing homes that received non-Weatherization Assistance Program federal assistance within the past 15 years, and it would repeal the $3,000 per-dwelling cap on renewable energy systems.
The bill's instruction
Section 415(c)(1) of the Energy Conservation and Production Act (42 U.S.C. 6865(c)(1)) is amended by striking “$6,500” and inserting “$12,000”. Section 415(c)(2) of the Energy Conservation and Production Act (42 U.S.C. 6865(c)(2)) is amended— (1) by striking “, or under other Federal programs”; (2) by striking “, may ” and inserting “may”; and (3) by striking “or under other Federal programs, or from receiving non-Federal assistance for weatherization”. Section 415(c) of the Energy Conservation and Production Act (42 U.S.C. 6865(c)) is amended by striking paragraph (4).
Also changed by H.R. 10917, S. 2570, S. 1342, H.R. 1355, S. 350
- Amends
42 U.S.C. 6872
Authorization of appropriations
This change updates a date by extending the annual $350 million authorization of appropriations for the Weatherization Assistance Program from fiscal year 2025 through fiscal year 2030.
The bill's instruction
Paragraph (2) of section 422 of the Energy Conservation and Production Act (42 U.S.C. 6872) is amended by striking “2025” and inserting “2030”.
- Amends
26 U.S.C. 46
Amount of credit
Current law lists the specific tax credits that comprise the general investment tax credit under section 38 of the Internal Revenue Code. The bill would add paragraph (8), adding the "qualifying electric power transmission line credit" to the list of credits that make up the investment credit.
The bill's instruction
Section 46 of the Internal Revenue Code of 1986 is amended— (A) in paragraph (6), by striking “and” at the end, (B) in paragraph (7), by striking the period at the end and inserting “, and”, and (C) by adding at the end the following: “ (8) the qualifying electric power transmission line credit. .”
Also changed by S. 5513, S. 5453, H.R. 9921, H.R. 9419, H.R. 7821
- Amends
26 U.S.C. 6418
Transfer of certain credits
Subsections (f)(1)(A)
Current law allows taxpayers to elect to transfer certain clean energy and manufacturing tax credits to unrelated taxpayers in exchange for cash payments. The bill would amend subparagraph (f)(1)(A) by adding clause (xiii), which designates the qualifying electric power transmission line credit under section 48F as an eligible credit that can be transferred.
The bill's instruction
Section 6418(f)(1)(A) of the Internal Revenue Code of 1986 is amended by adding at the end the following: “ (xiii) The qualifying electric power transmission line credit under section 48F. .”
Also changed by H.R. 10582, S. 5552, S. 5453, H.R. 9921, H.R. 7821
- Amends
16 U.S.C. 796
Definitions
Current law defines key terms for the Federal Power Act regarding electricity regulation, utilities, and hydroelectric licensing. The bill would add several new definitions to section 3, including "energy storage project", "generating facility", "generator tie line", "greenhouse gas", "advanced transmission technology", "interconnection customer", "transmission benefits", and "network upgrade". (Note: The provided text of the bill's amendment was truncated during the definition of "network upgrade" and was not available in full.)
The bill's instruction
Section 3 of the Federal Power Act (16 U.S.C. 796) is amended by adding at the end the following: “ (30) Energy storage project The term energy storage project means equipment that receives, stores, and delivers energy-using batteries, compressed air, pumped hydropower, hydrogen storage (including hydrolysis), thermal energy storage, regenerative fuel cells, flywheels, capacitors, superconducting magnets, or other technologies identified by the Secretary of Energy. (31) Generating facility The term generating facility means any facility that generates electricity. (32) Generator tie line The term generator tie line means a dedicated transmission line that is used to transmit power from a generating facility or an energy storage project to a transmission facility or a transmission system. (33) Greenhouse gas The term greenhouse gas includes each of the following: (A) Carbon dioxide. (B) Methane. (C) Nitrous oxide. (D) Sulfur hexafluoride. (E) Any hydrofluorocarbon. (F) Any perfluorocarbon. (G) Nitrogen trifluoride. (H) Any fully fluorinated linear, branched, or cyclic— (i) alkane; (ii) ether; (iii) tertiary amine; or (iv) aminoether. (I) Any perfluoropolyether. (J) Any hydrofluoropolyether. (K) Any other fluorocarbon, except for a fluorocarbon with a vapor pressure of less than 1 mm of Hg absolute at 25 degrees Celsius. (34) Advanced transmission technology The term advanced transmission technology means any hardware or software that— (A) increases the capacity, efficiency, reliability, resilience, or safety of transmission facilities and transmission technologies; (B) is installed in addition to new or existing transmission facilities and transmission technologies— (i) to give operators of the transmission facilities and transmission technologies more situational awareness and control over the electric grid; (ii) to make the transmission facilities and transmission technologies more efficient; or (iii) to increase the transfer capacity of the transmission facilities and transmission technologies; and (C) includes, but is not limited to, dynamic line ratings, advanced conductors, topology optimization, advanced power-flow controls, and other digital or physical systems that increase the usable transfer capability of the grid. (35) Interconnection customer The term interconnection customer means an entity, or any affiliates or subsidiaries of an entity, that proposes to interconnect a generating facility or an energy storage project to a transmission facility or transmission system. (36) Transmission benefits The term transmission benefits means the broad range of economic, operational, safety, resilience, public policy, and environmental benefits (as assessed by the Commission in accordance with section 224(e)) and other reasonably anticipated benefits of constructing, modifying, or operating a transmission facility, including— (A) improved reliability; (B) improved resilience; (C) improved safety; (D) reduced congestion; (E) reduced power losses; (F) greater carrying capacity; (G) reduced operating reserve requirements; (H) improved access to lower-cost electricity generation; (I) improved access to electricity generating facilities with no direct emissions of greenhouse gases; (J) improved public health from the closure of electricity generation facilities that emit harmful pollution; (K) increased competition and market liquidity in electricity markets; (L) improved energy resilience and resilience of Department of Defense installations; (M) improved ability to integrate new sources of electrical demand; and (N) other potential benefits of increasing the interconnectedness of the electric grid. (37) Network upgrade The term network upgrade means— (A) any addition to or expansion of any transmission facility or transmission system; (B) the construction of a new transmission facility that will become part of a transmission system; (C) the addition of an energy storage project to a transmission facility or a transmission system; or (D) any construction, deployment, or addition of an advanced transmission techn
- Amends
16 U.S.C. 2621
Consideration and determination respecting certain ratemaking standards
Current law establishes federal standards under the Public Utility Regulatory Policies Act that state regulatory authorities and nonregulated utilities must consider adopting. The bill would add two new standards under subsection (d). The first would require utilities to offer a community solar program open to all consumers, including low-income ratepayers and third-party-owned systems. The second would require utilities to classify "large load facilities" (demanding over 75 megawatts) as a distinct consumer class, fully recover all grid upgrade costs from them, and prioritize service requests from facilities that use energy conservation, onsite storage, demand flexibility, and zero-emission electricity. It also adds subsection (e) defining "large load facility" and "zero-emission electric energy".
The bill's instruction
Section 111(d) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2621(d)) is amended by adding at the end the following: “ (22) Community solar programs (A) In general Each electric utility shall offer a community solar program that provides all ratepayers, including low-income ratepayers, equitable and demonstrable access to such community solar program. Such programs may include community solar facilities owned or operated by non-utility entities and shall not restrict participation to utility-owned facilities. (B) Definitions For the purposes of this paragraph: (i) Community solar program The term community solar program means a service provided to any electric consumer that the electric utility serves through which the value of electricity generated by a community solar facility may be used to reduce total charges billed to the electric consumer. (ii) Community solar facility The term community solar facility means a solar photovoltaic system that— (I) allocates electricity to multiple electric consumers of an electric utility; (II) is interconnected with the electric grid; and (III) is located either on or off the property of the electric consumers described in subclause (I). .” Section 111(d) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2621(d)) is amended by adding at the end the following: “ (22) Large load facility class (A) Classification Large load facilities shall be considered a class of electric consumers. (B) Cost recovery relating to large load facility class Each electric utility that provides electric service to a class of electric consumers described in subparagraph (A) shall fully recover from such class all costs associated with any upgrade made to the generation, transmission, or distribution facilities of the electric grid, including local facilities, in order to meet the demand for electric energy from such class, including in the event that a large load facility ceases operations or uses less electric energy than projected at the time of such upgrade. (23) Grid reliability for large load facilities Each electric utility shall prioritize, among requests from owners or operators of large load facilities for electric service, such a request under which the owner or operator agrees to employ— (A) features that reduce the demand for electric energy from the electric grid during times of peak demand, including— (i) energy efficiency or energy conservation measures; (ii) onsite energy storage; or (iii) demand response or load flexibility technologies; and (B) zero-emission electric energy generated onsite or procured within the same balancing authority through a power purchase agreement to meet all of the demand of the large load facility for electric energy. .” Section 111 of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2621) is amended by adding at the end the following: “ (e) Definitions For the purposes of subsection (d): (1) Large load facility The term large load facility— (A) means a facility, or an aggregation of facilities at a single site, with respect to which the peak demand of such facility or such aggregation of facilities exceeds 75 megawatts; and (B) does not include an existing facility with respect to which any increased demand is predominantly caused by electrification or measures to reduce greenhouse gas emissions. (2) Zero-emission electric energy The term zero-emission electric energy means electric energy generated without emitting greenhouse gases, including from solar, wind, geothermal, hydroelectric, tidal, fission, or fusion energy. .”
Also changed by H.R. 10851, H.R. 10738, H.R. 10322, S. 5159, S. 5028
- Amends
16 U.S.C. 2622
Obligations to consider and determine
Current law sets deadlines for state regulatory authorities and nonregulated electric utilities to commence and complete consideration of federal ratemaking standards. The bill would amend subsection (b) to require consideration of the new standards within 12 months and a final determination within 24 months of enactment. It would update subsection (c) to apply default compliance deadlines relative to the new standards' enactment date, and it would add subsection (i) to exempt states that have already enacted or held proceedings on comparable standards.
The bill's instruction
Section 112(b) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2622(b)) is amended by adding at the end the following: “ (9) (A) Not later than 12 months after the date of enactment of this paragraph, each State regulatory authority (with respect to each electric utility for which the State has ratemaking authority) and each nonregulated electric utility shall commence consideration under section 111, or set a hearing date for consideration, with respect to the standard established by paragraph (22) of section 111(d). (B) Not later than 24 months after the date of enactment of this paragraph, each State regulatory authority (with respect to each electric utility for which the State has ratemaking authority), and each nonregulated electric utility shall complete the consideration and make the determination under section 111 with respect to the standard established by paragraph (22) of section 111(d). .” Section 112(c) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2622(c)) is amended— (i) by striking “subsection (b)(2)” and inserting “subsection (b)”; and (ii) by adding at the end the following: “In the case of the standard established by paragraph (22) of section 111(d), the reference contained in this subsection to the date of enactment of this Act shall be deemed to be a reference to the date of enactment of that paragraph (22).”. Section 112 of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2622) is amended by adding at the end the following: “ (i) Prior State actions Subsections (b) and (c) shall not apply to the standard established by paragraph (22) of section 111(d) in the case of any electric utility in a State if, before the date of enactment of this subsection— (1) the State has implemented for the electric utility the standard (or a comparable standard); (2) the State regulatory authority for the State or the relevant nonregulated electric utility has conducted a proceeding to consider implementation of the standard (or a comparable standard) for the electric utility; or (3) the State legislature has voted on the implementation of the standard (or a comparable standard) for the electric utility. .”
Also changed by H.R. 10851, H.R. 10738, H.R. 10322, S. 5159, S. 5028
- Amends
16 U.S.C. 2634
Prior and pending proceedings
The bill updates prior proceeding rules under the Public Utility Regulatory Policies Act by ensuring that proceedings commenced before the enactment of the new standards (for community solar and large load facilities) are recognized under the law relative to the new enactment date.
The bill's instruction
Section 124 of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2634) is amended by adding at the end the following: “In the case of the standard established by paragraph (22) of section 111(d), the reference contained in this subsection to the date of enactment of this Act shall be deemed to be a reference to the date of enactment of that paragraph (22).”. Section 124 of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2634) is amended by inserting “In the case of each standard established by paragraphs (22) and (23) of section 111(d), the reference contained in this section to the date of enactment of this Act shall be deemed to be a reference to the date of enactment of such paragraphs (22) and (23).” after “paragraph (21).”.
Also changed by H.R. 10851, H.R. 10738, S. 5159, S. 5028, H.R. 9655
- Amends
40 U.S.C. 501
Services for executive agencies
Subsections (b)(1)
Current law limits contracts entered into by the General Services Administration for public utility services on behalf of executive agencies to a maximum term of 10 years. The bill would increase the maximum period for public utility service contracts from 10 years to 30 years.
The bill's instruction
Section 501(b)(1) of title 40, United States Code, is amended by amending subparagraph (B) to read as follows: “ (B) Public utility contracts A contract under this paragraph for public utility services may be for a period of not more than 30 years. .”
- Amends
16 U.S.C. 824p
Siting of interstate electric transmission facilities
No AI explanation of this change yet.
The bill's instruction
Section 216 of the Federal Power Act (16 U.S.C. 824p) is amended— (A) in subsection (b)(2), by inserting “(including transmission of electric energy from the outer Continental Shelf to a State)” after “interstate commerce”; and (B) in subsection (h)— (i) by amending paragraph (2) to read as follows: “ (2) Lead agency For the purposes of coordinating all applicable Federal authorizations and related environmental reviews— (A) the Commission shall act as the lead agency in the case of— (i) except as provided in subparagraph (B), a transmission facility of national significance in a national interest electric transmission corridor designated by the Secretary under subsection (a); or (ii) a transmission facility of national significance for which an application has been submitted for a certificate of public convenience and necessity under section 227; (B) the Department of the Interior shall act as the lead agency in the case of a transmission facility of national significance in a national interest electric transmission corridor designated by the Secretary under subsection (a) that is located on a lease, easement, or right-of-way granted by the Secretary of the Interior under section 8(p)(1)(C) of the Outer Continental Shelf Lands Act (43 U.S.C. 1337(p)(1)(C)); and (C) the Department of Energy shall act as the lead agency in the case of any other transmission facility of national significance. ;” (ii) in each of paragraphs (3), (4)(B), (4)(C), (5)(B), (6)(A), (7)(A), (8)(A)(i), and (9), by striking “Secretary” each place it appears and inserting “applicable lead agency”; (iii) in paragraph (4)(A), by striking “As head of the lead agency, the Secretary” and inserting “The applicable lead agency”; (iv) in paragraph (5)(A), by striking “As lead agency head, the Secretary” and inserting “The applicable lead agency”; and (v) in paragraph (7)— (I) in subparagraph (A), by striking “after the date of enactment of this section” and inserting “after the date of enactment of the Energy Bills Relief Act”; and (II) in subparagraph (B), by amending clause (i) to read as follows: “ (i) Not later than six months after the date of enactment of the Energy Bills Relief Act, the Secretary, the Commission, and the heads of all Federal agencies with authority to issue Federal authorizations shall enter into a memorandum of understanding to ensure the timely and coordinated review and permitting of electric transmission facilities. .”
Also changed by S. 5653, H.R. 10539, H.R. 10302, S. 4765, H.R. 8248
- Amends
16 U.S.C. 824s
Transmission infrastructure investment
No AI explanation of this change yet.
The bill's instruction
Section 219(b)(4)(B) of the Federal Power Act (16 U.S.C. 824s(b)(4)(B)) is amended by striking “section 216” and inserting “sections 216 and 227”.
Also changed by S. 5653, H.R. 8568, H.R. 7729, S. 3947, H.R. 5600
- Amends
16 U.S.C. 824a
Interconnection and coordination of facilities; emergencies; transmission to foreign countries
No AI explanation of this change yet.
The bill's instruction
Section 202(c) of the Federal Power Act (16 U.S.C. 824a) is amended— (1) in paragraph (1)— (A) by striking “Commission” after “During the continuance of any war in which the United States is engaged, or whenever the” and inserting “Secretary of Energy (referred to in this subsection as the “Secretary”)”; (B) by striking “exists” after “determines that an emergency” and inserting “currently exists or will occur within 6 months”; (C) by striking “Commission” after “or other causes, the” and inserting “Secretary”; (D) by inserting “As part of the order, the Secretary shall explain why such order best meets the emergency and serves the public interest.” after “serve the public interest.”; and (E) by striking “Commission” after “carrying out such order, the” and inserting “Federal Energy Regulatory Commission (referred to in this subsection as the “Commission”)”; (2) in paragraph (2)— (A) by striking “Commission” after “law or regulation, the” and inserting “Secretary”; and (B) by adding at the end the following: “ The Secretary shall state in such orders— (A) that are in effect for 96 or fewer hours, the specific hours that are necessary to meet the emergency and serve the public interest; or (B) that are in effect for more than 96 hours, the specific methodology by which such hours that are necessary to meet the emergency and serve the public interest were determined. . ” (3) in paragraph (4)— (A) by striking “Commission” wherever it appears and inserting “Secretary”; (B) in subparagraph (A), by striking “that may result in a conflict with a requirement of any Federal, State, or local environmental law or regulation”; (C) in subparagraph (B)— (i) by inserting “that may result in a conflict with a requirement of any Federal, State, or local environmental law or regulation” after “In renewing or reissuing an order under subparagraph (A)”; and (ii) by inserting “The Secretary shall make available to the public the primary Federal agency consulted.” after “practicable.”; and (D) by adding at the end— “ (C) Before renewing or reissuing an order under subparagraph (A), the Secretary shall undertake a robust study of available alternatives that would reduce the net costs as compared to renewing or reissuing the order. (D) In the event the Secretary issues a renewed or reissued order under this paragraph, a petition for judicial review of such renewed or reissued order may be filed under section 313(b) without filing a request for rehearing or otherwise complying with any requirements of section 313(a). ; and ” (4) by adding at the end the following: “ (6) (A) Not later than 30 days after the date on which the Secretary issues an order under paragraph (1), the Commission shall publish— (i) estimates of the costs that are expected to be incurred by any electric utility and customers of such electric utility as a result of the order; and (ii) other expected impacts of the order. (B) Not later than 60 days after the date on which the Secretary issues an order under paragraph (1), an electric utility that has been, or is expected to be, affected as a result of the order, including any electric utility described in subparagraph (A)(i), shall provide in writing to customers of the electric utility a description of the costs incurred due to the order, or costs expected to be incurred as a result of the order, including any information relevant to the electric utility and the customers of the electric utility published under subparagraph (A). . ”
Also changed by H.R. 10687, S. 4337, H.R. 3062, S. 1485
- Amends
42 U.S.C. 8621
Home energy grants
No AI explanation of this change yet.
The bill's instruction
Section 2602 of the Low-Income Home Energy Assistance Act of 1981 (42 U.S.C. 8621) is amended— (1) in subsection (b)— (A) by striking “section 2607A)” and inserting “section 2604(e), 2605(u), 2607A, 2607B, or 2607C)”; and (B) by striking “$2,000,000,000” and all that follows and inserting “such sums as may be necessary, including such sums as may be necessary to enable the States to assist all households that meet the eligibility requirements established under this title and to enable States to implement home energy affordability measures described in section 2605(b)(3).”; (2) in subsection (e), in the first sentence— (A) by striking “in each fiscal year”; (B) by striking “$600,000,000” and inserting “$2,000,000,000 for fiscal year 2026, and $2,000,000,000 plus such additional sums as may be necessary for each fiscal year thereafter,”; and (C) by inserting “, or arising from a major disaster, as defined in section 2604(e)(1)” before the period at the end; and (3) by adding at the end the following: “ (f) There is authorized to be appropriated to carry out section 2607C, including making grants under that section, $1,000,000,000 for fiscal year 2026, and $1,000,000,000 plus such additional sums as may be necessary for each fiscal year thereafter. .” The Low-Income Home Energy Assistance Act of 1981 (42 U.S.C. 8621 et seq.) is amended— (1) in section 2607B(e)(2)(K) (42 U.S.C. 8626b(e)(2)(K)) by striking “paragraphs (2), (3), (4), (5), (7), (9), (10), (11), (12), (13), and (14) of section 2605(b)” and inserting “paragraphs (2), (4), (5), (6), (8), (10), (11), (12), (13), (14), and (15) of section 2605(b)”; and (2) in section 2610(b)(1) (42 U.S.C. 8629) by striking “clauses (2), (5), (8), and (15) of section 2605(b)” and inserting “paragraphs (2), (6), (9), and (16) of section 2605(b)”.
- Amends
42 U.S.C. 8622
Definitions
No AI explanation of this change yet.
The bill's instruction
Section 2603 of the Low-Income Home Energy Assistance Act of 1981 (42 U.S.C. 8622) is amended— (1) by redesignating paragraphs (4) through (6), (7) through (10), and (11), as paragraphs (6) through (8), (10) through (13), and (15), respectively; (2) by inserting after paragraph (3) the following: “ (4) The terms extreme heat and extreme cold, used with respect to a period, means a period in which there is an increased risk of— (A) heat-related or cold-related, respectively, illness, hospitalization, or death; or (B) failures or energy shutoffs of home cooling or heating, respectively. (5) The term HEAP coordinator means an employee— (A) who administers a program funded under section 2602(b); and (B) whose salary is paid, partly or wholly, with funds made available under that section. ;” (3) by inserting after paragraph (8), as so redesignated, the following: “ (9) The term local coordinating agency means any local organization or local office that receives funds under section 2602(b) to perform customer intake, or approval of benefits, on behalf of the State agency. ; and” (4) by inserting after paragraph (13), as so redesignated, the following: “ (14) The term State agency means any State agency that administers the program funded under section 2602(b). .”
- Amends
42 U.S.C. 8623
State allotments
No AI explanation of this change yet.
The bill's instruction
Section 2604 of the Low-Income Home Energy Assistance Act of 1981 (42 U.S.C. 8623) is amended— (1) in subsection (a)(1)(B), by striking “section 2605(b)(9)(B)” and inserting “section 2605(b)(10)(B)”; and (2) in subsection (e)— (A) by striking “(e)” and inserting the following: “ (e) (1) In this subsection: (A) The term covered household means an eligible household in an area where the President, or the Secretary, as the case may be, has declared or determined the occurrence of a natural disaster, emergency, or major disaster. (B) The term major disaster means— (i) a major disaster or emergency declared under section 401 or 501, respectively, of the Robert T. Stafford Disaster Relief and Emergency Assistance Act (42 U.S.C. 5170, 5191); (ii) a public health emergency determined under section 319 of the Public Health Service Act (42 U.S.C. 247d); or (iii) a period of extreme heat or extreme cold, as determined by the Secretary. (2) ;” (B) in paragraph (2), as so designated, by striking “natural disaster or other emergency involved” and inserting “natural disaster, emergency, or major disaster involved”; and (C) by adding at the end the following: “ (3) Upon a declaration or a determination of a natural disaster, emergency, or major disaster, for an area, the Secretary and the Administrator of the Federal Emergency Management Agency shall, to the extent practicable, provide heating or cooling assistance through such an allotment to a State for covered households in that area. (4) To receive assistance under this subsection, the State that has jurisdiction over the covered households shall provide assurances to the Secretary that the State— (A) will not preclude a household that receives heating assistance or cooling assistance under this title during a calendar year, on the basis of obtaining that assistance, from receiving cooling assistance or heating assistance, respectively, under this title during that year; (B) will not require a household to indicate that a household member has a medical need for assistance under this title, to be eligible for that assistance; and (C) will allow use of such assistance for purposes for which heating or cooling assistance is available under the program funded under section 2602(b), including for providing energy-efficient air conditioners, and other equipment needed for home cooling, to eligible households. .”
- Amends
42 U.S.C. 8624
Applications and requirements
No AI explanation of this change yet.
The bill's instruction
Section 2605 of the Low-Income Home Energy Assistance Act of 1981 (42 U.S.C. 8624) is amended— (1) in subsection (b)— (A) in paragraph (1)(A), by striking “paragraph (5)” and inserting “paragraph (6)”; (B) in paragraph (2)— (i) in the matter preceding subparagraph (A), by inserting “, subject to subsection (c)(1)(A),” after “only”; (ii) in subparagraph (B), by striking “(B)” and all that follows through clause (ii) and inserting the following: “ (B) households with incomes which do not exceed the greater of— (i) an amount equal to 250 percent of the poverty level; or (ii) an amount equal to 80 percent of the State median income, ; and” (iii) in the matter following subparagraph (B)— (I) by striking “may give” and inserting “shall give”; and (II) by inserting before the semicolon the following: “, and the State may not exclude a household from eligibility on the basis of citizenship of 1 or more of the household members”; (C) by redesignating paragraphs (3) through (16) as paragraphs (4) through (17), respectively; (D) by inserting after paragraph (2) the following: “ (3) Energy burden limits To the extent practicable, the Secretary shall work with States using funding under section 2602(b) (supplemented by funding available through State-level energy programs, utility affordability initiatives, or other mechanisms as determined by the State in consultation with the Secretary) to implement home energy affordability measures— (A) to ensure that no household eligible under paragraph (2) experiences an energy burden for which the expenditures of the household for home energy exceed 3 percent of household income; and (B) to prioritize the further reduction of energy burdens for such eligible households with the lowest incomes. ; and” (E) in subparagraph (B) of paragraph (10), as so redesignated, by striking “paragraph (16)” and inserting “paragraph (17)”; (2) in subsection (c)(1)— (A) in subparagraph (A), by striking “assistance to be provided under this title, including criteria” and inserting “ assistance to be provided under this title, including— (i) certifying that the State and local coordinating agencies in the State— (I) shall, to the greatest extent possible, use data sharing agreements with Federal and State low-income assistance programs, including the supplemental nutrition assistance program established under the Food and Nutrition Act of 2008 (7 U.S.C. 2011 et seq.), the Medicaid program established under title XIX of the Social Security Act (42 U.S.C. 1396 et seq.), and the supplemental security income program established under title XVI of the Social Security Act (42 U.S.C. 1381 et seq.), to verify eligibility; (II) shall implement simplified re-enrollment procedures for households with fixed incomes or households already determined to be eligible under other Federal and State low-income assistance programs, to reduce administrative burdens on applicants and agencies; (III) shall not require applicants to submit proof of citizenship to establish status as an eligible household; and (IV) if neither the verification process described in subclause (I) nor the re-enrollment process described in subclause (II) apply to a household, shall allow applicants to self-attest that the applicants meet the criteria established under this title for an eligible household, to the extent necessary to facilitate access to assistance and prevent undue hardship for applicants; and (ii) describing criteria. ;” (B) in subparagraph (E), by striking “paragraph (5)” and inserting “paragraph (6)”; and (C) in subparagraph (F), by striking “clauses (3), (4), (5), (6), (7), (8), (10), (12), (13), and (15) of subsection (b)” and inserting “paragraphs (4), (5), (6), (7), (8), (9), (11), (13), (14), and (16) of subsection (b)”; (3) in subsection (e), by striking “subsection (b)(10)” and inserting “subsection (b)(11)”; (4) in subsection (f), by adding at the end the following: “ (3) For purposes of section 401(c), and the remainder of title IV,
Also changed by H.R. 10023, S. 5186, S. 2792, H.R. 5129, H.R. 2486
- Amends
42 U.S.C. 8626a
Incentive program for leveraging non-Federal resources
Subsections (b)
No AI explanation of this change yet.
The bill's instruction
in section 2607A(b) (42 U.S.C. 8626a(b)), in the matter preceding paragraph (1), by striking “low-income” the first place it appears; and
- Amends
42 U.S.C. 8626b
Residential Energy Assistance Challenge option (R.E.A.Ch.)
Subsections (e)(2)(B)(ii), (e)(2)(K)
No AI explanation of this change yet.
The bill's instruction
in section 2607B(e)(2)(B)(ii) (42 U.S.C. 8626b(e)(2)(B)(ii)), by striking “Low-Income”. in section 2607B(e)(2)(K) (42 U.S.C. 8626b(e)(2)(K)) by striking “paragraphs (2), (3), (4), (5), (7), (9), (10), (11), (12), (13), and (14) of section 2605(b)” and inserting “paragraphs (2), (4), (5), (6), (8), (10), (11), (12), (13), (14), and (15) of section 2605(b)”; and
- Amends
42 U.S.C. 8629
Studies and reports
No AI explanation of this change yet.
The bill's instruction
in section 2610(b)(1) (42 U.S.C. 8629) by striking “clauses (2), (5), (8), and (15) of section 2605(b)” and inserting “paragraphs (2), (6), (9), and (16) of section 2605(b)”.
- Amends
Section 319 of the Federal Power Act
Not in the US CodeSubsections (b)(2)
The bill's instruction
Section 319(b)(2) of the Federal Power Act (16 U.S.C. 825q–l(b)(2)) is amended by striking “The Commission may” and inserting “The Commission shall”.
- Amends
16 U.S.C. 824
Declaration of policy; application of subchapter
No AI explanation of this change yet.
The bill's instruction
Part II of the Federal Power Act (16 U.S.C. 824 et seq.) is amended by adding at the end the following: “ 224. Improving interregional electric transmission planning (a) In general Not later than 6 months after the date of enactment of this section, the Commission shall issue regulations that require each pair or grouping of neighboring transmission planning regions to jointly develop and file with the Commission a process by which they will develop an interregional transmission plan to identify and to facilitate the construction or upgrade of onshore and offshore electric transmission facilities that are efficient, cost-effective, and broadly beneficial. Such process must address the considerations in subsection (b) and be filed within 6 months after the regulations required by this paragraph are finalized. Such process must require development of an interregional transmission plan within at least 3 years of the promulgation of the regulations and that a new plan be developed at least every 3 years thereafter, in alignment with long-term regional transmission plans developed under Orders 1920 and 1920–A (89 Fed. Reg. 49280 and 89 Fed. Reg. 97174). (b) Considerations In determining the requirements for a process described in subsection (a), the Commission shall require that such process advance— (1) the development of transmission systems that can operate for a minimum of 20 years and across a wide range of scenarios, including scenarios that take into account— (A) Federal, State, and local laws and regulations, and other factors that affect electricity demand and the current and future generation resource mix; (B) trends in technology and fuel costs; (C) the retirement of generation facilities, energy storage projects, and transmission facilities; (D) generator interconnection requests and withdrawals; and (E) extreme weather events, including in anticipation of how the frequency and intensity of these events are projected to change over the planning period due to climate change; (2) the public interest; (3) the integrity of electricity markets; (4) the protection of consumers; (5) the optimization of transmission benefits; (6) the need for an individual interregional transmission project to secure approvals based on a comprehensive assessment of the multiple benefits provided; (7) the importance of synchronization of planning processes in neighboring transmission planning regions, such as using a joint model on a consistent timeline with a single set of needs, input assumptions, and benefit metrics; (8) the need for an individual interregional transmission project that is identified in the interregional transmission plan of a pair of transmission planning regions not to be subject to any subsequent planning process by other transmission planning regions; (9) that evaluation of long-term scenarios should align with the expected life of an element of a transmission system; (10) that a pair of transmission planning regions should allow for the identification and joint evaluation of alternatives proposed by stakeholders, and ensure meaningful opportunities for States, Tribes, consumer advocates, labor organizations, and environmental justice communities to participate; (11) the need to eliminate arbitrary project voltage, size, or cost requirements for transmission projects; (12) the applicability of a broad range of alternatives to the construction of transmission facilities, including advanced transmission technologies, demand side flexibility, distributed storage, load management, dynamic line rating, and power flow control; and (13) the use of data and analyses provided by the Secretary of Energy, including as provided by the National Laboratories, regarding any of the items described in paragraphs (1) through (12). (c) Report Not later than 12 months after the issuance of regulations under subsection (a) and annually thereafter, the Commission shall publish in the Federal Register a report on the progress by each pair of transmission planning regions in identifying and facilitating the construction of interreg
Also changed by H.R. 10987, H.R. 10988, H.R. 10809, S. 5653, H.R. 10539
- Amends
42 U.S.C. 7171
Appointment and administration
No AI explanation of this change yet.
The bill's instruction
Section 401(k) of the Department of Energy Organization Act (42 U.S.C. 7171(k)) is amended— (1) in paragraph (1), by striking “subchapter III of”; (2) in paragraph (2)— (A) by striking subparagraph (A); and (B) by redesignating subparagraphs (B) through (E) as subparagraphs (A) through (D), respectively; and (3) in paragraph (6)— (A) by striking “The Chairman” and inserting the following: “ (A) In general The Chairman ; and” (B) by adding at the end the following: “ (B) Implementation plan Not later than 90 days after the date of enactment of this subparagraph, the Chairman shall submit to the Director of the Office of Personnel Management a plan to implement this subsection. The Director of the Office of Personnel Management shall take final action on the plan not later than 120 days after the submission of such plan. .” Section 401 of the Department of Energy Organization Act (42 U.S.C. 7171) is amended by adding at the end the following: “ (l) Direct hire authority (1) In general Notwithstanding section 3304 of title 5, United States Code, and without regard to the provisions of sections 3309 through 3318 of such title 5, if the Chairman of the Commission issues a certification that there is as severe shortage of candidates or a critical hiring need for covered positions to carry out the Commission’s responsibilities and activities, the Chairman may, subject to paragraph (3), recruit and directly appoint highly qualified individuals into the competitive service. (2) Limitation Any action authorized pursuant to paragraph (1) shall be consistent with the merit principles of section 2301 of title 5, United States Code, and the Commission shall comply with the public notice requirements of section 3327 of such title 5. (3) Termination (A) In general A certification issued or renewed under this subsection shall terminate on the earlier of— (i) the date that is 5 years after the certification is issued or renewed; or (ii) the date on which the Chairman determines that there is no longer a severe shortage of candidates or a critical hiring need for covered positions to carry out the Commission’s responsibilities and activities. (B) Renewal The Chairman may renew a certification issued or renewed under this subsection for an additional 5-year period if the Chairman determines there is still a severe shortage of candidates or a critical hiring need for covered positions to carry out the Commission’s responsibilities and activities. (4) Covered position In this subsection, the term covered position means a position in which an employee is responsible for conducting work of a scientific, technical, engineering, mathematical, legal, or otherwise highly specialized or skilled nature. .” Section 11004(b) of the Energy Act of 2020 (42 U.S.C. 7171 note; Public Law 116–260) is amended— (1) in paragraph (1), by striking “thereafter for 10 years” and inserting “thereafter”; and (2) in paragraph (2)(B), by striking “or mathematical” and inserting “mathematical, or otherwise highly specialized or skilled”.
- Amends
15 U.S.C. 717
Regulation of natural gas companies
No AI explanation of this change yet.
The bill's instruction
The Natural Gas Act (15 U.S.C. 717 et seq.) is amended by inserting after section 4A the following: “ 4B. Prohibition on filing false information No person shall willfully and knowingly report to a Federal agency or private-sector price-reporting agency, with intent to fraudulently affect the data being compiled by the Federal agency or private-sector price-reporting agency, any information relating to the transportation or sale of natural gas subject to the jurisdiction of the Commission (including information relating to the availability and prices of natural gas sold at wholesale and in interstate commerce and information relating to the operation of facilities for the transportation and sale of natural gas at wholesale and in interstate commerce) that the person knows to be false at the time of the reporting. .”
- Amends
15 U.S.C. 717s
Enforcement of chapter
Subsections (d)
No AI explanation of this change yet.
The bill's instruction
Section 20(d) of the Natural Gas Act (15 U.S.C. 717s(d)) is amended— (A) in the matter preceding paragraph (1), by striking “individual” and inserting “person”; (B) in paragraph (1), by inserting “with respect to a person who is an individual,” before “acting”; and (C) in paragraph (2), in the matter preceding subparagraph (A), by inserting “, directly or indirectly,” after “engaging”.
- Amends
15 U.S.C. 717t-1
Civil penalty authority
No AI explanation of this change yet.
The bill's instruction
Section 22 of the Natural Gas Act (15 U.S.C. 717t–1) is amended by adding at the end the following: “ (d) Prohibition or suspension for violations The Commission may prohibit, conditionally or unconditionally, permanently or for such period of time as the Commission determines to be appropriate, any person who is engaged or has engaged in practices constituting a violation of section 4A or 4B (including related rules and regulations) from engaging, directly or indirectly, in the business of purchasing or selling— (1) natural gas; or (2) transmission services subject to the jurisdiction of the Commission. .”
- Amends
16 U.S.C. 825m
Enforcement provisions
Subsections (d)
No AI explanation of this change yet.
The bill's instruction
Section 314(d) of the Federal Power Act (16 U.S.C. 825m(d)) is amended— (A) in the matter preceding paragraph (1)— (i) by striking “individual” and inserting “person”; and (ii) by inserting “or 222” after “section 221”; (B) in paragraph (1), by inserting “with respect to a person who is an individual,” before “acting”; and (C) in paragraph (2)— (i) in the matter preceding subparagraph (A), by inserting “, directly or indirectly,” after “engaging”; (ii) in subparagraph (A), by striking “; or” and inserting a semicolon; (iii) by redesignating subparagraph (B) as subparagraph (C); and (iv) by inserting after subparagraph (A) the following: “ (B) electric energy products, including financial transmission rights; or .”
- Amends
16 U.S.C. 825o-1
Enforcement of certain provisions
No AI explanation of this change yet.
The bill's instruction
Section 316A of the Federal Power Act (16 U.S.C. 825o–1) is amended by adding at the end the following: “ (c) Prohibition or suspension for violations The Commission may prohibit, conditionally or unconditionally, permanently or for such period of time as the Commission determines to be appropriate, any person who is engaged or has engaged in practices constituting a violation of section 221 or 222 (and related rules and regulations) from engaging, directly or indirectly, in the business of purchasing or selling— (1) electric energy; (2) electric energy products, including financial transmission rights; or (3) transmission services subject to the jurisdiction of the Commission. .”