S. 4765In committeeEnergy

Let America Build Act of 2026

RepublicanJohn Barrasso
Introduced June 11, 2026Origin: Senate

  1. Introduced

  2. In committee

    Current step
  3. Reported

    Not yet
  4. Passed Senate

    Not yet
  5. Passed House

    Not yet
  6. Resolving differences

    Not yet
  7. Sent to the president

    Not yet
  8. Signed

    Not yet
  9. Became law

    Not yet

AI-generated from the official bill text and not reviewed by a person. It may contain errors. How summaries are made

The Let America Build Act of 2026 would alter federal leasing, environmental review, and permitting rules for oil, gas, coal, and minerals, delegate certain authorities to states, restrict agency reviews under the National Environmental Policy Act, and expedite energy infrastructure approvals.

Who it affects

This bill directly affects the Department of the Interior (including the Bureau of Land Management), the Department of Energy, the Federal Energy Regulatory Commission, the U.S. Forest Service, state regulatory agencies overseeing energy and minerals, Indian Tribes, federal court jurisdictions handling environmental reviews, and private developers, operators, and leaseholders involved in onshore and offshore oil and gas extraction, coal mining, critical and hardrock mineral development, and liquefied natural gas or interstate pipeline infrastructure.

Based on the Introduced in Senate text · gemini-3.8-flash

Generated October 4, 2026 · Read the official text on Congress.gov

Your Vote

1 key actions of 2: Congress.gov's major actions and roll-call votes.

  1. Introduced in Senate

    Recorded by: Library of Congress

Sections of law the bill's Introduced in Senate text would amend, repeal or add to, found in the bill's own text. US Code current through Public Law 119-142.

Explanations are AI-generated from the bill text and the current US Code and not reviewed by a person. They may contain errors; the bill's instruction and the current text are shown so you can check them. How explanations are made

  • Amends

    30 U.S.C. 181

    Lands subject to disposition; persons entitled to benefits; reciprocal privileges; helium rights reserved

    Current law authorizes the Secretary of the Interior to administer leases for deposits of oil, gas, coal, and other minerals on public lands. It does not establish a statutory framework allowing states to administer federal permits to drill and related approvals on federal lands within their borders. The bill would amend the Mineral Leasing Act by inserting a new section 44 (and redesignating existing section 44 as section 46) establishing a cooperative federalism program. Under this program, the Secretary could delegate to an applying state the exclusive authority to issue applications for permits to drill (APDs), approve drilling plans and sundry notices, approve suspensions of operations or production, grant rights-of-way, and conduct related inspection and enforcement on available federal lands. The provided text cuts off while describing the effect of federal environmental reviews on state application processing.

    The bill's instruction

    The Mineral Leasing Act (30 U.S.C. 181 et seq.) is amended— (1) by redesignating section 44 as section 46; and (2) by inserting after section 43 the following: “ 44. Cooperative federalism in oil and gas permitting on available Federal land (a) Definitions In this section: (1) APD The term APD means a permit— (A) that grants authority to drill for oil and gas; and (B) for which an application has been received that includes— (i) a drilling plan; and (ii) evidence of bond coverage. (2) Available Federal land The term available Federal land means any Federal land that— (A) is located within the boundaries of a State; (B) is not held by the United States in trust for the benefit of a federally recognized Indian Tribe or a member of a federally recognized Indian Tribe; (C) is not a unit of the National Park System; (D) is not a unit of the National Wildlife Refuge System, other than a unit of the National Wildlife Refuge System for which oil and gas drilling is allowed under law; (E) is not a congressionally approved wilderness area under the Wilderness Act (16 U.S.C. 1131 et seq.); and (F) has been identified as land available for lease, or has been leased, for the exploration, development, and production of oil and gas— (i) by the Bureau of Land Management under— (I) a resource management plan under the Federal Land Policy and Management Act of 1976 (43 U.S.C. 1701 et seq.); or (II) an integrated activity plan with respect to the National Petroleum Reserve-Alaska; or (ii) by the Forest Service under a National Forest management plan under the Forest and Rangeland Renewable Resources Planning Act of 1974 (16 U.S.C. 1600 et seq.). (3) Drilling plan The term drilling plan means a plan described in section 3162.3–1(e) of title 43, Code of Federal Regulations (or a successor regulation). (4) Secretary The term Secretary means the Secretary of the Interior. (5) State applicant The term State applicant means a State that submits an application under subsection (c). (6) State program The term State program means a program in a State under which the State may— (A) issue APDs, approve drilling plans, approve sundry notices, approve suspensions of operations or production, or grant rights-of-way on available Federal land; and (B) impose sanctions for violations of State laws, regulations, or any condition of an issued APD or approved drilling plan, as applicable. (7) Sundry notice The term sundry notice means a written request submitted pursuant to section 3173.10 of title 43, Code of Federal Regulations (or successor regulations). (8) Suspension of operations or production The term suspension of operations or production means a suspension of operations or production described in section 17 or section 39. (b) Authorizations (1) In general On receipt of an application under subsection (c), the Secretary may delegate to a State exclusive authority— (A) to issue an APD on available Federal land; (B) to approve drilling plans on available Federal land; (C) to approve sundry notices relating to work performed on available Federal land; (D) to approve suspensions of operations or production; and (E) to grant rights-of-way in accordance with paragraph (3). (2) Inspection and enforcement On request of a State for which authority is delegated under paragraph (1), the authority delegated may include the authority to inspect and enforce an APD, drilling plan, or right-of-way, as applicable. (3) Rights-of-way The authority to grant a right-of-way delegated to a State under paragraph (1)(E) shall be the authority of the Secretary or the Secretary of Agriculture, as applicable, under section 501 of the Federal Land Policy and Management Act of 1976 (43 U.S.C. 1761) and section 28 of this Act, to grant, issue, or renew rights-of-way over, upon, under, or through available Federal land. (4) Effect of Federal environmental reviews A State for which authority is delegated under paragraph (1) shall continue processing applications for an APD, applications for approval of a drilling plan, applications for approval of a sundry notice,
  • Amends

    42 U.S.C. 15942

    NEPA review

    Subsections (a)

    Current law provides a rebuttable presumption that the Secretary of the Interior or the Secretary of Agriculture will apply a categorical exclusion under the National Environmental Policy Act of 1969 (NEPA) for specific surface-disturbing oil and gas activities conducted under the Mineral Leasing Act, such as disturbances under 5 acres where prior NEPA analysis was completed or drilling within a previously developed field. The bill would remove the "rebuttable presumption" standard and instead mandate that the relevant Secretary "shall apply" a categorical exclusion under NEPA for each specified action if the action is conducted for oil or gas exploration or development.

    The bill's instruction

    Section 390(a) of the Energy Policy Act of 2005 (42 U.S.C. 15942(a)) is amended— (1) by striking “Action by the Secretary” and inserting “The Secretary”; (2) by striking “with respect to any of the activities described in subsection (b) shall be subject to a rebuttable presumption that the use of” and inserting “shall apply”; and (3) by striking “would apply if the activity” and inserting “for each action described in subsection (b) if the action”.

    Also changed by S. 5653, S. 4795, H.R. 7568, H.R. 7329, H.R. 5631

  • Amends

    15 U.S.C. 717r

    Rehearing and review

    Subsections (a), (d)(3)

    Current law provides that if the Federal Energy Regulatory Commission does not act upon an application for rehearing within 30 days after it is filed, the application may be deemed denied. For judicial review of other federal or state agency decisions on permits for natural gas facilities, a federal court of appeals remands the proceeding to the agency if it finds the agency's order or action is inconsistent with the federal law governing the permit and would prevent construction, expansion, or operation. The bill would extend the period before an application for rehearing is deemed denied from 30 days to 60 days. It would also amend the standard for judicial review of other agency permit decisions, requiring the court to find both that the action is inconsistent with governing federal law and "is not supported by clear and convincing evidence" before remanding the proceeding.

    The bill's instruction

    Section 19(a) of the Natural Gas Act (15 U.S.C. 717r(a)) is amended, in the fourth sentence, by striking “thirty” and inserting “60”. Section 19(d)(3) of the Natural Gas Act (15 U.S.C. 717r(d)(3)) is amended, in the first sentence, by inserting “, is not supported by clear and convincing evidence,” after “such permit”.

    Also changed by H.R. 10500, S. 4944

  • Amends

    30 U.S.C. 226

    Leasing of oil and gas parcels

    Current law governs the competitive and noncompetitive leasing of public lands for oil and gas development, but does not provide fixed deadlines for resolving protests against lease sales or limit how court challenges affect lease validity and permit processing. The bill would require the Secretary of the Interior to resolve any protest to an oil and gas lease sale within 60 days following payment, and exempt denied protests from further environmental review under NEPA. It would add provisions stating that civil actions challenging environmental reviews will not invalidate issued leases or delay drilling permit timelines; if a court finds a NEPA violation, it must remand to the Secretary rather than setting aside the sale or vacating leases. It would also allow leaseholders to pause their lease terms while litigation is pending. Finally, it would restrict the Secretary from canceling issued leases except by written agreement with the lessee or under specific regulations that cannot rely on judicial findings of environmental review violations.

    The bill's instruction

    Section 17(b)(1)(A) of the Mineral Leasing Act (30 U.S.C. 226(b)(1)(A)) is amended by inserting after the seventh sentence the following: “The Secretary of the Interior shall resolve any protest to a lease sale within 60 days following such payment. Notwithstanding any other provision of law, if the Secretary of the Interior denies a protest to a lease sale, any lease subject to the protest shall not be subject to further environmental review by the Secretary of the Interior pursuant to the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).”. Section 17 of the Mineral Leasing Act (30 U.S.C. 226) is amended by adding at the end the following: “ (r) Effect of litigation (1) In general A civil action relating to an environmental review under the Federal Land Policy and Management Act of 1976 (43 U.S.C. 1701 et seq.), division A of subtitle III of title 54, United States Code (formerly known as the “National Historic Preservation Act”), or the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) with respect to a lease sale conducted under this section shall not— (A) affect the validity of a lease issued under the lease sale that is the subject of the civil action; or (B) except as provided in paragraph (3)(B), cause a delay in the timelines established under subsection (p)(2) for the consideration of an application for permit to drill with respect to a lease issued under the lease sale that is the subject of the civil action. (2) Remand; processing of applications for permit to drill If, in a civil action described in paragraph (1), the environmental review for a lease sale is found by the applicable court to violate the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.)— (A) notwithstanding chapter 5 or 7 of title 5, United States Code (commonly referred to as the “Administrative Procedure Act”), the applicable court shall not set aside the lease sale and vacate the leases issued pursuant to the sale but instead remand the matter to the Secretary of the Interior to resolve the violation; and (B) the Secretary of the Interior shall continue to process all applicable applications for permit to drill pursuant to subsection (p)(2). (3) Notice (A) In general Not later than 60 days after the date on which a civil action described in paragraph (1) is filed, the Secretary of the Interior shall notify the holder of any lease issued under the lease sale that is the subject of the civil action of the filing of the civil action. (B) Timeline Not later than 90 days after the date of receipt of a notice under subparagraph (A), the leaseholder may file with the Secretary of the Interior a request to pause the timeline under subsection (e)(1) with respect to the term of the lease during any period in which the civil action is pending. .” Section 17 of the Mineral Leasing Act (30 U.S.C. 226) (as amended by paragraph (2)) is amended by adding at the end the following: “ (s) Lease cancellation A lease issued under this section shall be considered to be valid and not subject to cancellation by the Secretary of the Interior for any reason, except for— (1) the express written agreement to the cancellation by the lessee; or (2) a determination by the Secretary of the Interior that cancellation is appropriate in accordance with section 3108.30 of title 43, Code of Federal Regulations (as in effect on the date of enactment of this subsection), subject to the limitation that a lease may not be determined to be improperly issued under that section based on a finding by a Federal court that the environmental review for the lease sale pursuant to which the lease was issued was in violation of the Federal Land Policy and Management Act of 1976 (43 U.S.C. 1701 et seq.), division A of subtitle III of title 54, United States Code (formerly known as the “National Historic Preservation Act”), or the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.). .”

    Also changed by H.R. 10721, S. 5630, S. 5653, H.R. 7329, H.R. 4754

  • Amends

    30 U.S.C. 226-2

    Limitations for filing oil and gas contests

    Current law establishes a 90-day limitation period following a final decision of the Secretary of the Interior for filing an action contesting a decision involving an oil and gas lease, and contains an outdated provision concerning decisions rendered prior to September 2, 1960. The bill would replace that provision. It would set a 60-day deadline from the Secretary's final decision to contest an oil and gas lease sale, individual lease, or individual permit, notwithstanding the Administrative Procedure Act. It would also specify venue: challenges to an individual lease or permit could only be filed in the federal district court where the property is located, while challenges to a lease sale could only be filed in a federal district court in the state where the sale occurred. Additionally, it would allow a defendant or defendant intervenor to remove multistate actions to the federal district court where the property is located.

    The bill's instruction

    Section 42 of the Mineral Leasing Act (30 U.S.C. 226–2) is amended by striking the section designation and all that follows through the period at the end of the second sentence, and inserting the following: “ 42. Limitations for filing oil and gas contests (a) In general Notwithstanding chapter 5 or 7 of title 5, United States Code (commonly referred to as the “Administrative Procedure Act”), no action contesting a decision of the Secretary involving any oil and gas lease sale, individual lease, or individual permit shall be maintained unless the action is commenced or taken by not later than 60 days after the date on which the final decision of the Secretary relating to the action was made. (b) Jurisdiction An action contesting a decision of the Secretary may only be commenced— (1) for an individual lease or permit, in the district court of the United States for the district in which the property, or some part thereof, is located; and (2) for a lease sale, in a district court of the United States in the State in which the sale occurred. (c) Removal A defendant or defendant intervenor in an action challenging a lease sale, lease, or permit in multiple States may remove the action to the district court of the United States for the district in which the property is located pursuant to section 1441(c) of title 28, United States Code. .”
  • Amends

    30 U.S.C. 201

    Leases and exploration

    Subsections (a)(1)

    Under current law, the Secretary of the Interior may offer coal lands for leasing by competitive bidding at the Secretary's discretion, either upon the request of a qualified applicant or on the Secretary's own motion from time to time. Bids cannot be accepted if they are lower than the fair market value as determined by the Secretary, but no statutory deadline is set for determining fair market value. The bill would remove the Secretary's open-ended discretion and instead require the Secretary to offer coal lands for leasing not later than 90 days after receiving a request from a qualified applicant, or on the Secretary's own motion at least four times each calendar year. It would also require the Secretary to determine the fair market value within 45 days after receiving a bid.

    The bill's instruction

    Section 2(a)(1) of the Mineral Leasing Act (30 U.S.C. 201(a)(1)) is amended— (1) in the first sentence— (A) by striking “he finds” and inserting “the Secretary of the Interior finds”; and (B) by striking “he shall, in his discretion, upon the request of any qualified applicant or on his own motion, from time to time, offer” and inserting “the Secretary of the Interior, not later than 90 days after the date of receipt of the request of any qualified applicant, or on the motion of the Secretary of the Interior not fewer than 4 times each calendar year, shall offer”; and (2) in the fifth sentence, by striking “No bid shall be accepted which is less than the fair market value, as determined by the Secretary,” and inserting “No bid shall be accepted that is less than the fair market value, as determined by the Secretary of the Interior by the date that is 45 days after the date of receipt of the bid,”.

    Also changed by S. 4410, H.R. 7872

  • Amends

    16 U.S.C. 825l

    Review of orders

    Subsections (a)

    This change updates a number, extending the deadline by which the Federal Energy Regulatory Commission must act on an application for rehearing under the Federal Power Act before the application may be deemed denied from 30 days to 60 days.

    The bill's instruction

    Section 313(a) of the Federal Power Act (16 U.S.C. 825l(a)) is amended, in the fourth sentence, by striking “thirty” and inserting “60”.
  • Amends

    43 U.S.C. 1334

    Administration of leasing

    Subsections (a)(2)

    Current law directs the Secretary of the Interior to prescribe regulations for the administration of outer Continental Shelf leasing, including regulations authorizing lease or permit cancellations at any time if continued activity would likely cause serious harm or damage to life, property, minerals, national security, or the environment, provided operations have been suspended for five years and certain conditions are met. The bill would amend these cancellation provisions by specifying that an outer Continental Shelf lease or permit is considered valid and cannot be canceled by the Secretary for any reason, except through express written agreement with the lessee or permittee, or through an administrative determination under existing regulatory and statutory grounds. It would explicitly bar the Secretary from canceling a lease or permit based on a federal court finding that the environmental review for the underlying lease sale violated NEPA.

    The bill's instruction

    Section 5(a)(2) of the Outer Continental Shelf Lands Act (43 U.S.C. 1334(a)(2)) is amended— (A) in the matter preceding subparagraph (A), by striking “any lease or permit—” and all that follows through the end of subparagraph (B) and inserting the following: “any lease or permit— “ (A) that the lease or permit shall be considered to be valid and not subject to cancellation by the Secretary for any reason, except for— (i) the express written agreement to the cancellation by the lessee or permittee; or (ii) a determination by the Secretary that cancellation is appropriate (including cancellation under subsection (c), section 8(o), section 11(c)(1), and subsections (h)(2)(C) and (j) of section 25), in accordance with the regulations prescribed under this section, subject to the limitation that a lease or permit may not be cancelled by the Secretary based on a finding by a Federal court that the environmental review for the lease sale pursuant to which the lease was issued was in violation of the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); and ; and” (B) by redesignating subparagraph (C) as subparagraph (B).

    Also changed by S. 4715, H.R. 9034

  • Amends

    43 U.S.C. 1337

    Leases, easements, and rights-of-way on the outer Continental Shelf

    Current law governs the award, bidding terms, and administration of outer Continental Shelf oil and gas leases, but does not provide specific statutory limits on how judicial review under NEPA affects lease validity or permit processing. The bill would add a new subsection (q) specifying that civil actions challenging an environmental review under NEPA for a lease sale will not affect the validity of issued leases or delay timelines for considering drilling permits. If a court finds a NEPA violation, it would be barred from setting aside the lease sale or vacating leases, and must instead remand the matter to the Secretary while the agency continues processing applications for permits to drill. The bill would also require the Secretary to notify leaseholders of litigation within 60 days and allow leaseholders to request a pause on their lease terms while the litigation is pending.

    The bill's instruction

    Section 8 of the Outer Continental Shelf Lands Act (43 U.S.C. 1337) is amended by adding at the end the following: “ (q) Effect of litigation (1) In general A civil action relating to an environmental review under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) with respect to a lease sale conducted under this section shall not— (A) affect the validity of a lease issued under the lease sale that is the subject of the civil action; or (B) except as provided in paragraph (3)(B), cause a delay in the timelines for the consideration of an application for permit to drill with respect to a lease issued under the lease sale that is the subject of the civil action. (2) Remand; processing of applications for permit to drill If, in a civil action described in paragraph (1), the environmental review for a lease sale is found by the applicable court to violate the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.)— (A) notwithstanding chapter 5 or 7 of title 5, United States Code (commonly referred to as the “Administrative Procedure Act”), the applicable court shall not set aside the lease sale and vacate the leases issued pursuant to the sale but instead remand the matter to the Secretary to resolve the violation; and (B) the Secretary shall continue to process all applicable applications for permit to drill in accordance with this Act. (3) Notice (A) In general Not later than 60 days after the date on which a civil action described in paragraph (1) is filed, the Secretary shall notify the holder of any lease issued under the lease sale that is the subject of the civil action of the filing of the civil action. (B) Timeline Not later than 90 days after the date of receipt of a notice under subparagraph (A), the leaseholder may file with the Secretary a request to pause the timeline with respect to the term of the lease during any period in which the civil action is pending. .”

    Also changed by S. 5653, H.R. 10318, H.R. 10256, H.R. 9358, H.R. 8542

  • Amends

    43 U.S.C. 1340

    Geological and geophysical explorations

    Subsections (c)(1)

    Current law authorizes the Secretary of the Interior to cancel an outer Continental Shelf oil and gas lease if an exploration plan is disapproved because proposed activities would cause conditions described in section 5(a)(2)(A)(i) of the Outer Continental Shelf Lands Act, subject to the suspension requirements of section 5(a)(2)(B) and compensation provisions of section 5(a)(2)(C). The bill would update these cross-references to conform to amendments made to section 5(a)(2). Instead of citing section 5(a)(2)(A)(i), it would write out the standard directly (probable serious harm or damage to life, property, minerals, national security, or the environment), remove the reference to the former section 5(a)(2)(B), and update the compensation reference to point to the redesignated section 5(a)(2)(B).

    The bill's instruction

    Section 11(c)(1) of the Outer Continental Shelf Lands Act (43 U.S.C. 1340(c)(1)) is amended— (i) in the fourth sentence, by striking “result in any condition described in section 5(a)(2)(A)(i) of this Act” and inserting “probably cause serious harm or damage to life (including fish and other aquatic life), to property, to any mineral (in areas leased or not leased), to the national security or defense, or to the marine, coastal, or human environment”; and (ii) in the fifth sentence— (I) by striking “, subject to section 5(a)(2)(B) of this Act,”; and (II) by striking “section 5(a)(2)(C) (i) or (ii) of this Act” and inserting “section 5(a)(2)(B)”.
  • Amends

    43 U.S.C. 1351

    Oil and gas development and production

    Subsections (h)(2)(C)

    This change updates a cross-reference in the Outer Continental Shelf Lands Act regarding lessee compensation upon lease cancellation, changing the citation from section 5(a)(2)(C) to section 5(a)(2)(B).

    The bill's instruction

    Section 25(h)(2)(C) of the Outer Continental Shelf Lands Act (43 U.S.C. 1351(h)(2)(C)) is amended, in the first sentence, by striking “section 5(a)(2)(C) of this Act” and inserting “section 5(a)(2)(B)”.
  • Amends

    43 U.S.C. 1714

    Withdrawals of lands

    Subsections (c)(1)

    Current law permits the Secretary of the Interior to make or extend public land withdrawals of 5,000 acres or more for up to 20 years, requiring notification to Congress by the effective date and providing that the withdrawal terminates if Congress adopts a concurrent resolution of disapproval within 90 days. The bill would amend this procedure by requiring the Secretary to notify both Houses of Congress at least 90 days before the effective date of the withdrawal. It would also provide that the withdrawal automatically terminates and becomes ineffective unless Congress enacts an affirmative joint resolution approving it prior to its effective date.

    The bill's instruction

    Section 204(c)(1) of the Federal Land Policy and Management Act of 1976 (43 U.S.C. 1714(c)(1)) is amended in the second sentence by striking “no later than its effective date” and all that follows through “approve the withdrawal” and inserting “not later than 90 days before the effective date of the withdrawal and the withdrawal shall terminate and become ineffective if Congress has not enacted a joint resolution approving the withdrawal prior to the effective date of the withdrawal”.
  • Amends

    30 U.S.C. 1606

    Mineral security

    Subsections (a)(2)(A), (a)(3)(B)(i), (c)(4)(A)(ii), (f)

    Current law defines "critical materials" as non-fuel minerals, elements, substances, or materials that have a high risk of supply chain disruption and serve an essential function in energy technologies. It defines "critical minerals" while excluding "fuel minerals" from that term, and specifies factors the Secretary of the Interior considers when assessing supply chain vulnerability. It also applies certain Federal Register notice rules to exploration projects involving critical mineral byproducts. The bill would remove the "non-fuel" limitation from the definition of critical materials and replace the general exclusion of "fuel minerals" with a narrower exclusion covering "oil, oil shale, coal (excluding metallurgical coal), or natural gas." It would add "significant projected domestic production decline" as a factor for determining supply chain vulnerability. Finally, it would broaden the Federal Register notice preparation rule from applying only to "critical mineral" permits to applying to mineral permits generally, while repealing the subsection on applying those provisions to byproduct projects.

    The bill's instruction

    Section 7002(a)(2)(A) of the Energy Act of 2020 (30 U.S.C. 1606(a)(2)(A)) is amended, in the matter preceding clause (i), by striking “non-fuel”. Section 7002(a)(3)(B)(i) of the Energy Act of 2020 (30 U.S.C. 1606(a)(3)(B)(i)) is amended by striking “fuel minerals” and inserting “oil, oil shale, coal (excluding metallurgical coal), or natural gas”. Section 7002(c)(4)(A)(ii) of the Energy Act of 2020 (30 U.S.C. 1606(c)(4)(A)(ii)) is amended by inserting “significant projected domestic production decline,” after “abrupt demand growth,”. Section 7002(f) of the Energy Act of 2020 (30 U.S.C. 1606(f)) is amended— (1) in paragraph (2), by striking “critical” in each place it appears; and (2) by striking paragraph (4).

    Also changed by H.R. 10681, S. 5587, S. 714, H.R. 755

  • Amends

    15 U.S.C. 717b

    Exportation or importation of natural gas; LNG terminals

    Current law establishes that natural gas imports from nations with a free trade agreement requiring national treatment for natural gas, as well as natural gas exports to such nations, are deemed consistent with the public interest and must be granted without modification or delay. The bill would replace subsection (c) with an expanded expedited approval process. In addition to continuing expedited approval for imports and exports involving free-trade nations, it would grant automatic approval without modification or delay for natural gas exports up to 51.75 billion cubic feet per year. It would also exclude from these expedited export processes any nation subject to United States sanctions.

    The bill's instruction

    Section 3 of the Natural Gas Act (15 U.S.C. 717b) is amended by striking subsection (c) and inserting the following: “ (c) Expedited application and approval process (1) In general For purposes of subsection (a), the following actions shall be considered to be consistent with the public interest, and applications for each of the following actions shall be granted without modification or delay: (A) The importation of natural gas referred to in subsection (b). (B) The exportation of natural gas in a volume of not more than 51,750,000,000 cubic feet per year, subject to the last sentence of subsection (a). (C) The exportation of natural gas to a nation with which there is in effect a free trade agreement requiring national treatment for trade in natural gas. (2) Exclusion Subparagraphs (B) and (C) of paragraph (1) shall not apply to any nation subject to sanctions imposed by the United States. .”

    Also changed by S. 4735, S. 4475, H.R. 7977, H.R. 7061, H.R. 5814

  • Amends

    16 U.S.C. 824p

    Siting of interstate electric transmission facilities

    Subsections (h)

    Current law designates the Department of Energy as the lead agency for coordinating federal authorizations and related environmental reviews for interstate electric transmission facilities, and outlines permitting authorities for the Federal Energy Regulatory Commission. The bill would restructure the definitions in subsection (h)(1) and add new restrictions on environmental reviews conducted under NEPA for transmission authorizations. The Commission would be required to evaluate "effects" only as physical changes to the human environment that are reasonably foreseeable, not remote, have a close causal relationship, and could be prevented by the agency, specifically excluding "but for" causation and upstream or downstream emissions. Alternatives analyzed under NEPA would be limited to those meeting the purpose, need, and applicant goals and within federal authority. The bill would also bar the Commission from applying any social cost metrics for greenhouse gas emissions.

    The bill's instruction

    Section 216(h) of the Federal Power Act (16 U.S.C. 824p(h)) is amended— (1) in paragraph (1)— (A) in subparagraph (B), by striking “(B) The term” and inserting the following: “ (B) Inclusions In this subsection, the term ; and” (B) by striking “(1) In this subsection” and all that follows through “The term” in subparagraph (A) and inserting the following: “ (1) Definition of Federal authorization (A) In general In this subsection, the term ; and” (2) by adding at the end the following: “ (10) Additional requirements (A) Definition of effects In conducting a review under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) relating to any Federal authorization (or to any other decision relating to the issuance of a Federal authorization, or the approval or denial of an application, under this section), the Commission shall consider the term “effects”, as used in that Act with respect to impacts and effects, to mean physical changes to the human environment as a result of a proposed action or alternative action to be carried out by a Federal agency that— (i) are reasonably foreseeable, not speculative, and not remote in time or geographically remote; (ii) have a reasonably close causal relationship that is not the product of a lengthy causal chain to the proposed action or alternative action, respectively, as determined by the Commission; (iii) the Commission has the ability to prevent and that would not occur absent the proposed action or alternative action; and (iv) do not constitute potential effects from emissions upstream or downstream of the facility that is the subject of the application under this section. (B) Requirement For purposes of subparagraph (A)(ii), a “but for” causal relationship is insufficient to establish a reasonably close causal relationship. (C) Alternatives In conducting a review described in subparagraph (A), any alternatives required to be analyzed under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) by the Commission shall— (i) meet the purpose and need for the proposed action; (ii) where applicable, meet the goals of the applicant; and (iii) be within the authority of the Federal agency to control. (D) No use of social cost metrics In conducting a review described in subparagraph (A), the Commission shall not consider or apply any metric that purports to estimate the monetized damages or benefits associated with incremental increases or decreases in greenhouse gas emissions. .”

    Also changed by S. 5653, H.R. 10539, H.R. 10302, H.R. 8248, H.R. 7977

  • Amends

    15 U.S.C. 717t-1

    Civil penalty authority

    Subsections (b)

    Current law authorizes the Federal Energy Regulatory Commission to assess civil penalties of up to $1,000,000 per day for violations of the Natural Gas Act, rules, or orders, after notice and opportunity for a public hearing. The bill would amend the notice requirement to specify that civil penalties must be assessed in accordance with the same procedural provisions that govern civil penalties under section 31(d) of the Federal Power Act (which includes procedures for election of administrative or judicial penalty determinations).

    The bill's instruction

    Section 22(b) of the Natural Gas Act (15 U.S.C. 717t–1(b)) is amended by inserting before the period at the end the following: “, in accordance with the same provisions as are applicable under section 31(d) of the Federal Power Act (16 U.S.C. 823b(d)) in the case of civil penalties assessed under that section of that Act (16 U.S.C. 823b)”.

    Also changed by H.R. 8423, S. 4351, H.R. 7977, H.R. 2347

  • Amends

    15 U.S.C. 717n

    Process coordination; hearings; rules of procedure

    Current law designates the Federal Energy Regulatory Commission as the lead agency for coordinating federal authorizations and environmental reviews under NEPA for interstate natural gas facilities and liquefied natural gas terminals. The bill would make technical formatting edits to subsections (a), (e), and (f), and add a new subsection (g) establishing specific requirements for NEPA reviews relating to natural gas authorizations. Under these requirements, "effects" would be defined strictly as reasonably foreseeable, non-remote physical changes with a close causal relationship that the Commission has the power to prevent, excluding upstream and downstream emissions and rejecting "but for" causation. NEPA alternatives would be restricted to those meeting the project's purpose, need, and applicant goals that are within federal authority. The Commission would also be prohibited from using any metric estimating the monetized social cost of greenhouse gas emissions.

    The bill's instruction

    Section 15 of the Natural Gas Act (15 U.S.C. 717n) is amended— (1) in subsection (a), by striking “(a) In this section,” and inserting the following: “ (a) Definition of Federal authorization In this section, ;” (2) in subsection (e)— (A) in the second sentence, by striking “In any proceeding” and inserting the following: “ (2) Proceedings In any proceeding ; and” (B) by striking “(e) Hearings under this act” and inserting the following: “ (e) Hearings and proceedings (1) Hearings Hearings under this Act ;” (3) in subsection (f)— (A) in the second sentence, by striking “No informality” and inserting the following: “ (2) Informalities No informality ; and” (B) by striking “(f) All hearings,” and inserting the following: “ (f) Governing rules (1) In general All hearings, ; and” (4) by inserting after subsection (f) the following: “ (g) Additional requirements (1) Definition of Effects In conducting a review under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) relating to any Federal authorization (or to any other decision relating to the issuance of an order or certificate, or the approval or denial of an application, under section 3 or 7), the Commission shall consider the term “effects”, as used in that Act with respect to impacts and effects, to mean physical changes to the human environment as a result of a proposed action or alternative action to be carried out by a Federal agency that— (A) are reasonably foreseeable, not speculative, and not remote in time or geographically remote; (B) have a reasonably close causal relationship that is not the product of a lengthy causal chain to the proposed action or alternative action, respectively, as determined by the Commission; (C) the Commission has the ability to prevent and that would not occur absent the proposed action or alternative action; and (D) do not constitute potential effects from emissions upstream or downstream of the facility that is the subject of the application under section 3 or 7. (2) Requirement For purposes of paragraph (1)(B), a “but for” causal relationship is insufficient to establish a reasonably close causal relationship. (3) Alternatives In conducting a review described in paragraph (1), any alternatives required to be analyzed under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) by the Commission shall— (A) meet the purpose and need for the proposed action; (B) where applicable, meet the goals of the applicant; and (C) be within the authority of the Federal agency to control. (4) No use of social cost metrics In conducting a review described in paragraph (1), the Commission shall not consider or apply any metric that purports to estimate the monetized damages or benefits associated with incremental increases or decreases in greenhouse gas emissions. .”

    Also changed by H.R. 7977, H.R. 381

  • Amends

    43 U.S.C. 1712

    Land use plans

    Subsections (c)

    Current law directs the Secretary of the Interior to observe specific criteria when developing and revising public land use plans, including multiple use, sustained yield, environmental protection, compliance with pollution laws, and coordination with state, local, and tribal plans. The bill would add a new criterion requiring the Secretary to review a mineral resource assessment applicable to the lands covered by the land use plan completed within the preceding 10 years. In consultation with the Secretary of Energy and the Secretary of Defense, the Secretary would also be required to determine the significance of minerals on those public lands to energy security, national security, and economic security.

    The bill's instruction

    Section 202(c) of the Federal Land Policy and Management Act of 1976 (43 U.S.C. 1712(c)) is amended— (1) in paragraph (8), by striking “and” at the end; (2) by redesignating paragraph (9) as paragraph (10); and (3) by inserting after paragraph (8) the following: “ (9) (A) review a mineral resource assessment applicable to the public lands covered by the land use plan that was completed during the 10-year period ending on the effective date of the land use plan; and (B) in consultation with the Secretary of Energy and the Secretary of Defense, determine the significance of the minerals located within the public lands to energy security, national security, and economic security, in accordance with subparagraph (A); and .”

    Also changed by S. 5526, H.R. 7567, H.R. 7578, S. 1462, S. 859

  • Amends

    30 U.S.C. 1607

    Critical minerals supply chains and reliability

    Current law establishes performance improvements and reporting requirements for federal permitting of "critical mineral" production on federal lands. The bill would change the scope of the section from "critical minerals" to "minerals" generally. It would add statutory definitions for lead agency, mineral, mineral exploration or mine permit, and mineral project, and direct the Bureau of Land Management and the Forest Service to improve permitting for all mineral projects on federal land. It would require agencies to defer to and rely on baseline data, analyses, and reviews by state agencies with environmental or reclamation jurisdiction. The bill would also add requirements for lead agencies to enter into memoranda of agreement with project applicants and set NEPA deadlines not to exceed one year for an environmental assessment and two years for an environmental impact statement (with limited extensions allowed). The provided bill text ends mid-sentence while describing extensions.

    The bill's instruction

    Section 40206 of the Infrastructure Investment and Jobs Act (30 U.S.C. 1607) is amended— (1) in the section heading, by striking “Critical minerals” and inserting “Minerals”; (2) by striking subsection (a) and inserting the following: “ (a) Definitions In this section: (1) Lead agency The term lead agency means the Federal agency with primary responsibility for issuing a mineral exploration or mine permit or lease for a mineral project. (2) Mineral The term mineral has the meaning given the term in section 2006(a) of the Let America Build Act of 2026. (3) Mineral exploration or mine permit The term mineral exploration or mine permit means— (A) an authorization of the Bureau of Land Management or the Forest Service, as applicable, for exploration for minerals that require analysis under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); (B) a plan of operations for a mineral project approved by the Bureau of Land Management or the Forest Service; or (C) any other Federal permit or authorization for a mineral project. (4) Mineral project The term “mineral project” means a project that— (A) is located on— (i) a mining claim, millsite claim, or tunnel site claim for any mineral; (ii) lands open to mineral entry; or (iii) a Federal mineral lease; and (B) is for the purposes of exploring for or producing minerals. ;” (3) in subsection (b), by striking “critical” each place it appears; (4) in subsection (c)— (A) in the matter preceding paragraph (1)— (i) by striking “critical mineral production on Federal land” and inserting “mineral projects”; and (ii) by striking “practicable, shall complete the” and inserting “practicable, and in accordance with subsection (h), shall complete those”; (B) in paragraph (1), by striking “critical mineral-related activities on Federal land” and inserting “mineral projects”; (C) in paragraph (8), by striking “and” at the end; (D) in paragraph (9), by striking the period at the end and inserting “; and”; and (E) by adding at the end the following: “ (10) deferring to and relying on baseline data, analyses, and reviews performed by State agencies with jurisdiction over the environmental or reclamation permits for the proposed mineral project. ;” (5) in subsection (d)— (A) by striking “critical” each place it appears; and (B) in paragraph (3), in the matter preceding subparagraph (A), by striking “mineral-related activities on Federal land” and inserting “mineral projects”; (6) in subsection (e), by striking “critical”; (7) in subsection (f), by striking “critical” each place it appears; (8) in subsection (g), by striking “critical”; and (9) by adding at the end the following: “ (h) Other requirements (1) Memorandum of agreement To maximize efficiency and effectiveness of the Federal permitting and review processes described in subsection (c), the lead agency in the Federal permitting and review processes of a mineral project shall enter into a memorandum of agreement with a project applicant on request by the applicant to carry out the activities described in that subsection. (2) Consultation A lead agency described in paragraph (1) shall carry out that paragraph in consultation with— (A) any other Federal agency involved in the applicable Federal permitting and review processes; and (B) on request of the project applicant, an affected State government, local government, Indian Tribe, or other entity that the lead agency determines appropriate. (3) Timelines and schedules (A) Deadlines Any timeline or schedule established under subsection (c)(1) relating to a review under section 102(2)(C) of the National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)(C)) shall require that the review process not exceed— (i) 1 year for an environmental assessment; and (ii) 2 years for an environmental impact statement. (B) Extension A project applicant may enter into 1 or more agreements with a lead agency to extend 1 or more of the deadlines described in subparagraph (A) by not more than 6
  • Amends

    30 U.S.C. 28f

    Fee

    Current law requires claimants to pay an annual claim maintenance fee of $100 per claim or site for unpatented lode mining claims, mill sites, tunnel sites, and placer claims, in lieu of assessment work requirements under the Mining Law of 1872. The bill would make structural and grammatical adjustments to subsections (a) and (b), designating existing sentences into numbered and lettered paragraphs and subparagraphs. It would also replace references to "the Mining Law of 1872 (30 U.S.C. 28–28e)" with updated statutory cross-references to "sections 2319 through 2344 of the Revised Statutes (30 U.S.C. 22 et seq.)."

    The bill's instruction

    Section 10101 of the Omnibus Budget Reconciliation Act of 1993 (30 U.S.C. 28f) is amended— (A) by striking “the Mining Law of 1872 (30 U.S.C. 28–28e)” each place it appears and inserting “sections 2319 through 2344 of the Revised Statutes (30 U.S.C. 22 et seq.)”; (B) in subsection (a)— (i) in paragraph (1)— (I) in the second sentence, by striking “Such claim maintenance fee” and inserting the following: “ (B) Fee The claim maintenance fee under subparagraph (A) ; and” (II) in the first sentence, by striking “The holder of” and inserting the following: “ (A) In general The holder of ; and” (ii) in paragraph (2)— (I) in the second sentence— (aa) by striking “the Mining Law of 1872 (30 U.S.C. 28 to 28e)” and inserting “sections 2319 through 2344 of the Revised Statutes (30 U.S.C. 22 et seq.)”; and (bb) by striking “Such claim maintenance fee” and inserting the following: “ (B) Fee The claim maintenance fee under subparagraph (A) ; and” (II) in the first sentence, by striking “The holder of” and inserting the following: “ (A) In general The holder of ; and” (C) in subsection (b)— (i) in the second sentence, by striking “The location fee” and inserting the following: “ (2) Fee The location fee ; and” (ii) in the first sentence, by striking “The claim main tenance fee” and inserting the following: “ (1) In general The claim maintenance fee .”

    Also changed by S. 5653, S. 4944, S. 4795, H.R. 6674, H.R. 4754

  • Amends

    30 U.S.C. 42

    Patents for nonmineral lands: application, survey, notice, acreage limitation, payment

    Current law allows proprietors of lode or placer mining claims to obtain patents for up to five acres of nonmineral, noncontiguous land for use as a mill site for mining, milling, or reduction operations. The bill would add a new subsection (c) allowing claim proprietors to locate and include within an approved plan of operations as many additional five-acre mill sites on public land as are reasonably necessary for waste rock, tailings disposal, or other operations incident to mineral development. These mill sites could be located on lands that are mineral-in-character, nonmineral, or of undetermined mineral character, including tracts with existing lode or placer claims. The new mill sites would convey no mineral rights and would be ineligible for patenting. The bill also includes savings provisions preserving existing rights and environmental regulatory authorities, but the provided text cuts off mid-sentence.

    The bill's instruction

    Section 2337 of the Revised Statutes (30 U.S.C. 42) is amended by adding at the end the following: “ (c) Additional mill sites (1) Definitions In this subsection: (A) Mill site The term mill site means a location of public land that is reasonably necessary for waste rock or tailings disposal or other operations reasonably incident to mineral development on, or production from land included in a plan of operations. (B) Operations; Operator The terms operations and operator have the meanings given those terms in section 3809.5 of title 43, Code of Federal Regulations (as in effect on the date of enactment of this subsection). (C) Plan of operations The term plan of operations means a plan of operations that an operator must submit and the Secretary of the Interior or the Secretary of Agriculture, as applicable, must approve before an operator may begin operations, in accordance with, as applicable— (i) subpart 3809 of part 3800 of title 43, Code of Federal Regulations (or successor regulations establishing application and approval requirements); and (ii) part 228 of title 36, Code of Federal Regulations (or successor regulations establishing application and approval requirements). (D) Public land The term public land means land owned by the United States that is open to location under sections 2319 through 2344 of the Revised Statutes (30 U.S.C. 22 et seq.), including— (i) land that is mineral-in-character (as defined in section 3830.5 of title 43, Code of Federal Regulations (as in effect on the date of enactment of this subsection)); (ii) nonmineral land (as defined in section 3830.5 of title 43, Code of Federal Regulations (as in effect on the date of enactment of this subsection)); and (iii) land where the mineral character has not been determined. (2) Use of public land Notwithstanding subsections (a) and (b), where public land is needed by the proprietor of a lode or placer claim for operations in connection with any lode or placer claim within the proposed plan of operations, the proprietor may— (A) locate and include within the plan of operations as many mill site claims under this subsection as are reasonably necessary for its operations; and (B) use or occupy public land in accordance with an approved plan of operations. (3) Mill sites convey no mineral rights A mill site under this subsection does not convey mineral rights to the locator. (4) Size of mill sites A location of a single mill site under this subsection shall not exceed 5 acres. (5) Mill site and lode or placer claims on same tracts of public land A mill site may be located under this subsection on a tract of public land on which the claimant or operator maintains a previously located lode or placer claim. (6) Effect on mining claims The location of a mill site under this subsection shall not affect the validity of any lode or placer claim, or any rights associated with such a claim. (7) Patenting A mill site under this subsection shall not be eligible for patenting. (8) Savings provisions Nothing in this subsection— (A) diminishes any right (including a right of entry, use, or occupancy) of a claimant; (B) creates or increases any right (including a right of exploration, entry, use, or occupancy) of a claimant on land that is not open to location under the general mining laws; (C) modifies any provision of law or any prior administrative action withdrawing land from location or entry; (D) limits the right of the Federal Government to regulate mining and mining-related activities (including requiring claim validity examinations to establish the discovery of a valuable mineral deposit) in areas withdrawn from mining, including under— (i) the general mining laws; (ii) the Federal Land Policy and Management Act of 1976 (43 U.S.C. 1701 et seq.); (iii) the Wilderness Act (16 U.S.C. 1131 et seq.); (iv) subchapter III of chapter 1007 of title 54, United States Code; (v) the Endangered Species Act of 1973 (16 U.S.C. 1531 et seq.); (vi) division A of subtitle III of title 54, United States Code (commonly referred to as the ‘National Historic Pre

    Also changed by S. 5653, S. 4944, S. 4795, H.R. 4754, H.R. 2347

  • Amends

    42 U.S.C. 4370m

    Definitions

    Subsections (6)(A)

    Current law defines a "covered project" under Title XLI of the Fixing America's Surface Transportation Act (FAST-41) as an activity requiring federal authorization or environmental review that involves construction of infrastructure across various enumerated sectors (such as renewable or conventional energy, pipelines, manufacturing, and broadband) meeting specific investment and review thresholds. The bill would amend the definition of "covered project" by adding "minerals production" to the list of eligible infrastructure sectors.

    The bill's instruction

    Section 41001(6)(A) of the FAST Act (42 U.S.C. 4370m(6)(A)) is amended in the matter preceding clause (i) by inserting “minerals production,” before “or any other sector”.

    Also changed by H.R. 9248, S. 4561, H.R. 8800, S. 4448, H.R. 8003

Explained by gemini-3.8-flash on November 6, 2026, against the US Code through Public Law 119-136.