Skip to main content
H.R. 5600In committeeEnergy

SPEED and Reliability Act of 2025

Introduced September 26, 2025Origin: House

  1. Introduced

  2. In committee

    Current step
  3. Reported

    Not yet
  4. Passed House

    Not yet
  5. Passed Senate

    Not yet
  6. Resolving differences

    Not yet
  7. Sent to the president

    Not yet
  8. Signed

    Not yet
  9. Became law

    Not yet

AI-generated from the official bill text and not reviewed by a person. It may contain errors. How summaries are made

The SPEED and Reliability Act of 2025 would amend the Federal Power Act to revise how the Federal Energy Regulatory Commission permits, coordinates, and allocates the costs of interstate electric transmission facilities.

Who it affects

Electric transmitting utilities, energy customers, landowners (including farmers and ranchers along proposed transmission paths), Indian Tribes, state utility commissions, the Federal Energy Regulatory Commission, and the Department of the Interior. It specifically excludes utilities operating solely within the ERCOT grid.

Based on the Introduced in House text · gemini-3.8-flash

Generated October 6, 2026 · Read the official text on Congress.gov

Your Vote

1 key actions of 2: Congress.gov's major actions and roll-call votes.

  1. Introduced in House

    Recorded by: Library of Congress

Sections of law the bill's Introduced in House text would amend, repeal or add to, found in the bill's own text. US Code current through Public Law 119-142.

  • Amends

    16 U.S.C. 824p

    Siting of interstate electric transmission facilities

    No AI explanation of this change yet.

    The bill's instruction

    Section 216 of the Federal Power Act (16 U.S.C. 824p) is amended by striking subsection (a) and inserting the following: “ (a) Definitions In this section: (1) Commission The term Commission means the Federal Energy Regulatory Commission. (2) ERO The term ERO has the meaning given such term in section 215(a). (3) Improved reliability The term improved reliability means that, on balance, considering each of the matters described in subparagraphs (A) through (D), reliability is improved in a material manner that benefits customers through at least one of the following: (A) Facilitating compliance with a mandatory standard for reliability approved by the Commission under section 215. (B) A reduction in expected unserved energy, loss of load hours, or loss of load probability (as defined by the ERO). (C) Facilitating compliance with a tariff requirement or process for resource adequacy on file with the Commission. (D) Any other similar material improvement, including a reduction in correlated outage risk, such as achieved through increased geographic or resource diversification. (4) Landowner input The term landowner input means input received— (A) by the Commission; (B) from affected landowners, such as farmers and ranchers, in the path of the proposed construction or modification of an electric transmission facility; and (C) pursuant to notification provided to, and consultation with, those affected landowners, farmers, and ranchers by the Commission. (5) Secretary The term Secretary means the Secretary of Energy. .” Section 216(b) of the Federal Power Act (16 U.S.C. 824p(b)) is amended— (1) in the matter preceding paragraph (1), by striking “Except” and all that follows through “finds that” and inserting “Except as provided in subsections (d)(1) and (i), the Commission shall, after notice and an opportunity for hearing, including a public comment period of at least 60 days, issue one or more permits for the construction or modification of electric transmission facilities necessary in the national interest if the Commission finds that”; (2) in paragraph (1)— (A) in subparagraph (A)(i), by inserting “or modification” after “siting”; and (B) in subparagraph (C)— (i) in the matter preceding clause (i), by inserting “or modification” after “siting”; and (ii) in clause (i), by striking “the later of” in the matter preceding subclause (I) and all that follows through the semicolon at the end of subclause (II) and inserting “the date on which the application was filed with the State commission or other entity;”; and (3) by striking paragraphs (2) through (6) and inserting the following: “ (2) the proposed facilities will be used for the transmission of electric energy in interstate (including transmission from the outer Continental Shelf to a State) or foreign commerce; (3) the proposed construction or modification is consistent with the public interest; (4) the proposed construction or modification will significantly reduce transmission congestion in interstate commerce, protect or benefit consumers, and provide improved reliability; (5) the proposed construction or modification is consistent with sound national energy policy and will enhance energy independence; (6) the electric transmission facilities are capable of transmitting electric energy at a voltage of not less than 100 kilovolts or, in the case of facilities that include advanced transmission conductors (including superconductors), as defined by the Commission, voltages determined to be appropriate by the Commission; and (7) the proposed modification (including reconductoring) will maximize, to the extent reasonable and economical, the transmission capabilities of existing towers, structures, or rights-of-way. .” Section 216(e)(3) of the Federal Power Act (16 U.S.C. 824p(e)(3)) is amended by striking “shall conform” and all that follows through the period at the end and inserting “shall be in accordance with rule 71.1 of the Federal Rules of Civil Procedure.”.

    Also changed by S. 5653, H.R. 10539, H.R. 10302, S. 4765, H.R. 8248

  • Amends

    16 U.S.C. 824s

    Transmission infrastructure investment

    Subsections (b)(4)

    No AI explanation of this change yet.

    The bill's instruction

    Section 219(b)(4) of the Federal Power Act (16 U.S.C. 824s(b)(4)) is amended— (1) in subparagraph (A), by striking “and” after the semicolon at the end; (2) in subparagraph (B), by striking the period at the end and inserting “; and”; and (3) by adding at the end the following: “ (C) all prudently incurred costs associated with payments to jurisdictions impacted by electric transmission facilities developed pursuant to section 216. .”

    Also changed by S. 5653, H.R. 8568, H.R. 7977, H.R. 7729, S. 3947

  • Amends

    42 U.S.C. 16421

    Third-party finance

    No AI explanation of this change yet.

    The bill's instruction

    Section 1222 of the Energy Policy Act of 2005 (42 U.S.C. 16421) is amended— (A) in subsection (a)(1)(A), by striking “is located in a national interest electric transmission corridor designated under section 216(a) of the Federal Power Act and”; and (B) in subsection (b)(1)(A), by striking “is located in an area designated under section 216(a) of the Federal Power Act and”.

    Also changed by S. 5653, H.R. 2347

  • Amends

    42 U.S.C. 18713

    Transmission facilitation program

    Subsections (h)(1)(A)

    No AI explanation of this change yet.

    The bill's instruction

    Section 40106(h)(1)(A) of the Infrastructure Investment and Jobs Act (42 U.S.C. 18713(h)(1)(A)) is amended by striking “(A) is located in” and all that follows through “(B) is necessary” in subparagraph (B) and inserting “is necessary”.

    Also changed by S. 5653, S. 3976, H.R. 7728, H.R. 7043, H.R. 2347

  • Amends

    42 U.S.C. 18715

    Transmission facility financing

    Subsections (b)

    No AI explanation of this change yet.

    The bill's instruction

    Section 50151(b) of Public Law 117–169 (42 U.S.C. 18715(b)) is amended by striking “designated by the Secretary to be necessary in the national interest under section 216(a) of the Federal Power Act (16 U.S.C. 824p(a))”.

    Also changed by S. 5653, H.R. 2347