Socket Full of Sunshine Act
Introduced
In committee
Current stepReported
Not yetPassed House
Not yetPassed Senate
Not yetResolving differences
Not yetSent to the president
Not yetSigned
Not yetBecame law
Not yet
AI-generated from the official bill text and not reviewed by a person. It may contain errors. How summaries are made
The Socket Full of Sunshine Act would require states to consider regulatory standards to encourage portable solar generation devices, establish a Department of Energy grant program for point-of-sale consumer rebates, and mandate new federal safety and cost-saving labeling standards.
Who it affects
This bill affects state utility regulatory authorities, electric utilities, consumers and tenants purchasing plug-in solar equipment, landlords of residential rental properties, manufacturers and sellers of portable solar devices, the Department of Energy, the Federal Trade Commission, and the Consumer Product Safety Commission.
Based on the Introduced in House text · gemini-3.8-flash
Generated October 20, 2026 · Read the official text on Congress.gov
Your Vote
1 key actions of 2: Congress.gov's major actions and roll-call votes.
Introduced in House
Recorded by: Library of Congress
Sections of law the bill's Introduced in House text would amend, repeal or add to, found in the bill's own text. US Code current through Public Law 119-142.
Explanations are AI-generated from the bill text and the current US Code and not reviewed by a person. They may contain errors; the bill's instruction and the current text are shown so you can check them. How explanations are made
- Amends
16 U.S.C. 2621
Consideration and determination respecting certain ratemaking standards
Subsections (d), (a)
Current law establishes federal standards that state utility regulatory authorities and nonregulated electric utilities must consider adopting. The bill would amend subsection (a) to clarify that states must consider each standard "except as otherwise provided." The bill would also add a new federal standard under subsection (d) requiring states to consider measures to promote the use of portable solar generation devices, especially those manufactured in the United States. Under this standard, states would consider exempting these devices from interconnection agreement requirements and net metering program requirements, and prohibiting electric utilities from requiring prior approval, insurance purchases, extra fees, or additional equipment beyond what is integrated into the device. The bill defines a "portable solar generation device" as a movable photovoltaic device generating up to 1,200 watts that connects via a standard 120-volt alternating current outlet, complies with the National Electrical Code, is certified by a nationally recognized testing laboratory, and meets specified power control requirements.
The bill's instruction
Section 111(d) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2621(d)) is amended by adding at the end the following: “ (22) Portable solar generation devices (A) Consideration Each State shall consider measures to promote the use of portable solar generation devices, particularly those manufactured in the United States, including by— (i) exempting portable solar generation devices from— (I) any requirement to obtain or execute an interconnection agreement prior to operating the portable solar generation device; and (II) net metering program requirements; and (ii) prohibiting electric utilities from requiring an electric consumer using a portable solar generation device to— (I) obtain the electric utility’s approval prior to installing or using the portable solar generation device; (II) purchase insurance for use of the portable solar generation device; (III) pay any fee or charge related to the portable solar generation device; or (IV) install any additional controls or equipment beyond what is integrated into the portable solar generation device. (B) Definition In this paragraph, the term portable solar generation device means a moveable photovoltaic generation device that— (i) has a maximum power output of not more than 1,200 watts; (ii) is designed to be connected to a building’s electrical system through a standard 120-volt alternating current outlet; (iii) is intended primarily to offset part of the electricity consumption of the electric consumer who owns or uses the device; (iv) meets the standards of the most recent version of the National Electrical Code; (v) is certified by Underwriters Laboratories or an equivalent nationally recognized testing laboratory; and (vi) is equipped with a power control system, if the device has a maximum power output that is greater than or equal to 400 watts. .” Section 111(a) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2621(a)) is amended by striking “Each State” and inserting “Except as otherwise provided, each State”.
Also changed by H.R. 10738, H.R. 10322, S. 5159, S. 5028, H.R. 9655
- Amends
16 U.S.C. 2622
Obligations to consider and determine
Current law sets specific deadlines and rules for state regulatory authorities and nonregulated utilities to consider and decide on federal ratemaking standards, and exempts utilities if the state took prior qualifying actions. The bill would require state regulatory authorities to begin considering the new portable solar generation standard (or set a hearing date) within 1 year of its enactment, and to complete their consideration and make a determination within 2 years. It would also apply existing enforcement provisions to the new standard if states fail to act within the required deadlines. Finally, the bill would add an exemption for state-regulated electric utilities if, before the new provision's enactment, the state already implemented the standard (or a comparable one), held a proceeding to consider it, or had its legislature vote on it within the preceding 3 years.
The bill's instruction
Section 112(b) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2622(b)) is amended by adding at the end the following: “ (9) (A) Not later than 1 year after the date of enactment of this paragraph, each State regulatory authority (with respect to each electric utility for which the State has ratemaking authority) shall commence consideration under section 111, or set a hearing date for consideration, with respect to the standard established by paragraph (22) of section 111(d). (B) Not later than 2 years after the date of enactment of this paragraph, each State regulatory authority (with respect to each electric utility for which the State has ratemaking authority) shall complete the consideration and make the determination under section 111 with respect to the standard established by paragraph (22) of section 111(d). .” Section 112(c) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2622(c)) is amended by adding at the end the following: “In the case of the standard established by paragraph (22) of section 111(d), the reference contained in this subsection to the date of enactment of this Act shall be deemed to be a reference to the date of enactment of that paragraph (22).”. Section 112 of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2622) is amended by adding at the end the following: “ (i) Prior State actions Subsections (b) and (c) shall not apply to the standard established by paragraph (22) of section 111(d) in the case of any State regulated electric utility in a State if, before the date of enactment of this subsection— (1) the State has implemented for the State regulated electric utility the standard (or a comparable standard); (2) the State regulatory authority for the State has conducted a proceeding to consider implementation of the standard (or a comparable standard) for the State regulated electric utility; or (3) the State legislature has voted on the implementation of the standard (or a comparable standard) for the State regulated electric utility during the 3-year period ending on that date of enactment. .”
Also changed by H.R. 10738, H.R. 10322, S. 5159, S. 5028, H.R. 9655
- Amends
16 U.S.C. 2634
Prior and pending proceedings
Current law allows proceedings and actions begun before the enactment of standards under the Public Utility Regulatory Policies Act of 1978 to satisfy statutory requirements if they substantially conformed to those requirements. The bill would add a provision specifying that, for the new portable solar generation standard, references to the date of enactment mean the date the new standard is enacted.
The bill's instruction
Section 124 of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2634) is amended by adding at the end the following: “In the case of the standard established by paragraph (22) of section 111(d), the reference contained in this section to the date of enactment of this Act shall be deemed to be a reference to the date of enactment of that paragraph (22).”.
Also changed by H.R. 10738, S. 5159, S. 5028, H.R. 9655, H.R. 9419
Explained by gemini-3.8-flash on October 21, 2026, against the US Code through Public Law 119-121.