Lower Electricity Bills Act
Introduced
In committee
Current stepReported
Not yetPassed House
Not yetPassed Senate
Not yetResolving differences
Not yetSent to the president
Not yetSigned
Not yetBecame law
Not yet
AI-generated from the official bill text and not reviewed by a person. It may contain errors. How summaries are made
The Lower Electricity Bills Act would require the Federal Energy Regulatory Commission to mandate that public utilities use advanced transmission technologies, such as high-performance conductors, when building or upgrading jurisdictional transmission facilities.
Who it affects
This bill directly affects public utilities subject to FERC jurisdiction that plan, construct, modify, or upgrade electric transmission facilities, as well as the Federal Energy Regulatory Commission and the Department of Energy.
Based on the Introduced in House text · gemini-3.8-flash
Generated November 12, 2026 · Read the official text on Congress.gov
Your Vote
1 key actions of 2: Congress.gov's major actions and roll-call votes.
Introduced in House
Recorded by: Library of Congress
Sections of law the bill's Introduced in House text would amend, repeal or add to, found in the bill's own text. US Code current through Public Law 119-142.
Explanations are AI-generated from the bill text and the current US Code and not reviewed by a person. They may contain errors; the bill's instruction and the current text are shown so you can check them. How explanations are made
- Amends
16 U.S.C. 824
Declaration of policy; application of subchapter
Current law sets forth federal policy and jurisdiction over the transmission and wholesale sale of electric energy in interstate commerce under Part II of the Federal Power Act. The bill would add a new section 224 to Part II of the Federal Power Act. This new section would direct the Federal Energy Regulatory Commission (FERC) to require public utilities to use advanced transmission technologies, including best-available transmission conductors, when constructing new jurisdictional transmission facilities or modifying, upgrading, replacing, or reconductoring existing facilities. In proceedings to recover the costs of these technologies through rates, FERC would be required to presume that their use is prudent and that the associated costs are just and reasonable. The bill would also require FERC to issue implementing regulations within one year. The rules would mandate that public utilities perform recurring benefit-cost and least-cost evaluations, consider project timelines and delay risks, deploy advanced transmission technologies when the benefits exceed the costs, and report their deployment decisions to FERC. (Note: The provided text of the bill's instructions ends mid-sentence and was not available in full.)
The bill's instruction
Part II of the Federal Power Act (16 U.S.C. 824 et seq.) is amended by adding at the end the following: “ 224. Use of advanced transmission technologies (a) Definitions In this section: (1) Advanced transmission technology The term advanced transmission technology has the meaning given the term in section 1223(a) of the Energy Policy Act of 2005 (42 U.S.C. 16422(a)). (2) Best-available transmission conductor The term best-available transmission conductor means a transmission conductor that, as determined by the Commission— (A) provides the greatest feasible and commercially available energy-carrying capacity at a given voltage level; (B) provides the highest feasible and commercially available electrical efficiency at that voltage level; and (C) provides the greatest available level of mechanical performance, including mitigating thermal sag at the maximum rated transmission-carrying capacity of the applicable transmission facility. (3) Commission The term Commission means the Federal Energy Regulatory Commission. (4) Covered project The term covered project means the construction of a new transmission facility, or the modification, upgrade, replacement, or reconductoring of an existing transmission facility, subject to the jurisdiction of the Commission under section 201(b). (b) Use of advanced transmission technologies In exercising its authority under sections 205 and 206, the Commission shall require that public utilities use advanced transmission technologies, including best-available transmission conductors, when carrying out covered projects. (c) Presumption of prudence for advanced transmission technologies In any filing seeking to recover the cost of an advanced transmission technology for a covered project, and in any proceeding to determine whether that cost may be recovered through rates, the Commission shall presume that— (1) the use of an advanced transmission technology is a prudent practice; and (2) the costs associated with the use of an advanced transmission technology are just and reasonable. (d) Applicability The requirements of this section apply only to public utilities and only with respect to covered projects. (e) Rulemaking (1) In general Not later than 1 year after the date of enactment of this section, the Commission shall issue an order or rule to implement this section. (2) Requirements In issuing an order or rule under paragraph (1), the Commission shall— (A) require that public utilities conduct, on Commission-established timelines, recurring evaluations— (i) to determine whether the benefits associated with deploying advanced transmission technologies through 1 or more covered projects, including benefits to the current transmission system of the applicable public utility, outweigh the costs (such that the applicable benefit-cost ratio is greater than 1); (ii) that include a least-cost analysis with respect to the transmission system of the applicable public utility; and (iii) that evaluate whether the costs for which recovery is sought reflect due care to minimize the total cost of the applicable covered projects; (B) require public utilities to conduct, on Commission-established timelines, recurring evaluations to consider planning and construction timelines for new transmission assets and risks and impacts of potential delays; (C) require that, if the benefits of 1 or more advanced transmission technologies outweigh the costs (such that the applicable benefit-cost ratio is greater than 1), the applicable public utility shall deploy the advanced transmission technologies on a timeline determined by the Commission; (D) require that decisions on whether to implement advanced transmission technologies based on the recurring evaluations under subparagraphs (A) and (B) are reported to the Commission, in a manner determined by the Commission; (E) in consultation with the Secretary of Energy, establish a methodology for determining whether a transmission conductor is a best-available transmission conductor for purposes of this section; (F) ensure that the methodology established under
Also changed by H.R. 10987, H.R. 10809, S. 5653, H.R. 10539, H.R. 10579
- Amends
42 U.S.C. 16422
Advanced transmission technologies
Subsections (a)
Current law defines "advanced transmission technology" by listing specific technologies that increase the capacity, efficiency, or reliability of an existing or new electric transmission facility, such as underground cables, high-temperature lines, and flexible AC transmission systems, ending with any other technologies that FERC considers appropriate. The bill would expand this statutory definition by adding four specific technologies to the list: dynamic line rating, advanced power flow control, transmission topology optimization, and high-performance conductors. It would redesignate the catch-all provision for other technologies identified by FERC to the end of the expanded list.
The bill's instruction
Section 1223(a) of the Energy Policy Act of 2005 (42 U.S.C. 16422(a)) is amended— (1) in paragraph (18), by striking “and” at the end; (2) by redesignating paragraph (19) as paragraph (23); and (3) by inserting after paragraph (18) the following: “ (19) dynamic line rating; (20) advanced power flow control; (21) transmission topology optimization; (22) high-performance conductors; and .”
Explained by gemini-3.8-flash on November 13, 2026, against the US Code through Public Law 119-138.