Skip to main content
S. 4337In committeeEnergy

No Big Fossil Bailouts on Your Power Bill Act

Introduced April 16, 2026Origin: Senate

  1. Introduced

  2. In committee

    Current step
  3. Reported

    Not yet
  4. Passed Senate

    Not yet
  5. Passed House

    Not yet
  6. Resolving differences

    Not yet
  7. Sent to the president

    Not yet
  8. Signed

    Not yet
  9. Became law

    Not yet

AI-generated from the official bill text and not reviewed by a person. It may contain errors. How summaries are made

The No Big Fossil Bailouts on Your Power Bill Act would restrict federal emergency orders that delay power plant retirements, requiring public hearings, rate-impact analyses, consideration of environmental alternatives, and customer notices.

Who it affects

This bill directly affects the Federal Energy Regulatory Commission, the Department of Energy, regional transmission organizations, electric utilities subject to emergency orders, state and local regulatory agencies, and utility customers who receive electricity rate impacts or mandatory notices.

Based on the Introduced in Senate text · gemini-3.8-flash

Generated October 5, 2026 · Read the official text on Congress.gov

Your Vote

1 key actions of 2: Congress.gov's major actions and roll-call votes.

  1. Introduced in Senate

    Recorded by: Library of Congress

Sections of law the bill's Introduced in Senate text would amend, repeal or add to, found in the bill's own text. US Code current through Public Law 119-142.

Explanations are AI-generated from the bill text and the current US Code and not reviewed by a person. They may contain errors; the bill's instruction and the current text are shown so you can check them. How explanations are made

  • Amends

    16 U.S.C. 824a

    Interconnection and coordination of facilities; emergencies; transmission to foreign countries

    Subsections (c)

    Current law authorizes the Federal Energy Regulatory Commission to issue emergency orders requiring temporary electrical connections, generation, or transmission during wartime or emergencies caused by sudden demand increases, supply or fuel shortages, or other causes, with or without notice, hearing, or report. Orders conflicting with environmental laws expire within 90 days and require consulting with primary federal environmental agencies before renewal. The bill's instruction is truncated and does not show the full text for newly added paragraph (7). The bill would remove "or other causes" and the phrase "with or without notice, hearing, or report." It would require the Commission, before issuing an order, to consider alternatives to meet the emergency and minimize adverse environmental impacts to the maximum extent practicable. The 90-day expiration would apply to all emergency orders, not just those conflicting with environmental laws. In advance of renewing or reissuing an order, the Commission would be required to hold a public hearing, determine ratepayer impacts and potential environmental law conflicts, and consult with relevant federal, state, and local agencies. If consulted agencies determine adverse rate or environmental impacts exist, the Commission would include conditions and cost estimates they submit, unless the Commission explains why a condition would prevent addressing the emergency. The bill would also bar orders that delay power plant retirements or require closed plants to generate electricity, unless no other method can meet the emergency and the transmission organization requests the delay in writing, and would require an online public docket.

    The bill's instruction

    Section 202(c) of the Federal Power Act (16 U.S.C. 824a(c)) is amended— (1) in paragraph (1), in the first sentence— (A) by striking “or other causes,”; and (B) by striking “with or without notice, hearing, or report,”; (2) in paragraph (2), by adding at the end the following: “Before issuing such an order, the Commission, to the maximum extent practicable, shall consider alternatives to meet the emergency, including alternatives that both meet the emergency and minimize adverse environmental impacts.”; (3) in paragraph (4)— (A) in subparagraph (A), in the first sentence, by striking “that may result in a conflict with a requirement of any Federal, State, or local environmental law or regulation”; (B) in subparagraph (B), in the first sentence— (i) by inserting “advance of” before “renewing or reissuing”; (ii) by striking “shall consult with the” and inserting the following: “shall— “ (i) hold a hearing open to the public on the proposed order; (ii) determine— (I) whether and the extent to which the order will raise rates for ratepayers; and (II) whether the order may result in a conflict with a requirement of any Federal, State, or local environmental law or regulation; and (iii) to accomplish the duties and comply with the requirements described in paragraph (2) and clause (ii), consult with— (I) the relevant State and local agencies or regulators, including the relevant State commission (collectively referred to in this paragraph as the “relevant non-Federal agencies”), in— (aa) each State and locality in which the applicable facility is physically located; and (bb) each State and locality in which the order may result in a conflict described in clause (ii)(II); and (II) the ; and” (iii) in clause (iii)(II) (as so designated), in the first sentence, by striking “such law or regulation, and shall” and inserting the following: “each environmental law or regulation with respect to which the order may result in a conflict described in clause (ii)(II). “ (C) The Commission shall ;” (C) in subparagraph (C) (as so designated)— (i) in the first sentence— (I) by striking “such Federal agency determines” and inserting “1 or more Federal or relevant non-Federal agencies consulted under subparagraph (B)(iii) determine”; and (II) by inserting “rate or” after “adverse”; and (ii) in the second sentence— (I) by striking “The conditions” and inserting “The cost estimates and conditions”; and (II) by striking “such Federal agency” and inserting “any 1 or more Federal or relevant non-Federal agencies”; and (D) by adding at the end the following: “ (D) An order issued under this subsection shall be considered to be a renewed or reissued order subject to the requirements of this paragraph and all other requirements relating to a renewed or reissued order if the order relates to the same facility and a substantially similar emergency as a previous order issued under this subsection. ; and” (4) by adding at the end the following: “ (6) (A) Except as provided in subparagraph (B), the Commission may not issue an order under this subsection that would— (i) prevent or delay the retirement or other permanent closure of a facility for the generation of electric energy; or (ii) require the generation of electric energy at a facility that has retired or otherwise permanently closed. (B) Subparagraph (A) shall not apply to a particular facility if— (i) an emergency exists that cannot be met in any manner other than delay of the retirement or other permanent closure of the facility; and (ii) the applicable Transmission Organization requests in writing to delay the retirement or other permanent closure of the facility. (7) (A) Before issuing an order under paragraph (1), the Commission shall— (i) create a public online docket for matters pertaining to the order; and (ii) publish on a publicly available website— (I) notice of the proposed order, including a link to the docket created under clause (i); and (II) any request submitted pursua

    Also changed by H.R. 10687, H.R. 7977, H.R. 3062, S. 1485

Explained by gemini-3.8-flash on November 16, 2026.