Power and Water for Families Act of 2026
Introduced
In committee
Current stepReported
Not yetPassed House
Not yetPassed Senate
Not yetResolving differences
Not yetSent to the president
Not yetSigned
Not yetBecame law
Not yet
AI-generated from the official bill text and not reviewed by a person. It may contain errors. How summaries are made
The Power and Water for Families Act of 2026 would require electric utilities to recover upgrade costs from large-load facilities like data centers, promote extra power generation, and establish tax credits for surplus power projects and industrial water reuse.
Who it affects
Electric utilities, state utility regulatory authorities, nonregulated electric utilities, large-load electricity consumers such as data centers with peak demands of 100 megawatts or more, municipal water providers, and industrial, manufacturing, and food processing facilities investing in water recycling systems.
Based on the Introduced in House text · gemini-3.8-flash
Generated October 4, 2026 · Read the official text on Congress.gov
Your Vote
1 key actions of 2: Congress.gov's major actions and roll-call votes.
Introduced in House
Recorded by: Library of Congress
Sections of law the bill's Introduced in House text would amend, repeal or add to, found in the bill's own text. US Code current through Public Law 119-142.
Explanations are AI-generated from the bill text and the current US Code and not reviewed by a person. They may contain errors; the bill's instruction and the current text are shown so you can check them. How explanations are made
- Amends
26 U.S.C. 46
Amount of credit
Currently, Section 46 lists seven component credits that make up the investment credit under the general business credit, including the rehabilitation credit, energy credit, and clean electricity investment credit. The bill would amend this section by adding an eighth component: the qualifying additive generation project credit.
The bill's instruction
Section 46 of the Internal Revenue Code of 1986 is amended by adding at the end the following: “ (8) the qualifying additive generation project credit. .”
Also changed by S. 5513, S. 5453, H.R. 9921, H.R. 7977, H.R. 7821
- Amends
16 U.S.C. 2622
Obligations to consider and determine
Currently, Section 2622 establishes time limits and procedural requirements for state regulatory authorities and nonregulated electric utilities to consider and determine whether to adopt various federal ratemaking standards, and provides exceptions for prior state actions. The bill would require state regulatory authorities and nonregulated electric utilities to begin considering the new standard for large-load customers within one year of enactment (or set a hearing date), and to complete consideration and make determinations regarding the large-load customer standard and the additive generation standard within two years of enactment. The bill would also exempt utilities from these deadlines if, prior to enactment, the state or utility already implemented the standard (or a comparable standard), conducted a proceeding to consider it, or had its state legislature vote on it.
The bill's instruction
Section 112 of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2622) is amended— (1) in subsection (b), by adding at the end the following: “ (9) (A) Not later than 1 year after the date of enactment of this paragraph, each State regulatory authority (with respect to each electric utility for which the State has ratemaking authority) and each nonregulated electric utility shall commence consideration under section 111, or set a hearing date for consideration, with respect to the standard established by paragraph (22) of section 111(d). (B) Not later than 2 years after the date of enactment of this paragraph, each State regulatory authority (with respect to each electric utility for which the State has ratemaking authority) and each nonregulated electric utility shall complete the consideration and make the determination under section 111 with respect to the standard established by paragraphs (22) and (23) of section 111(d). ;” (2) in subsection (c)— (A) by striking “subsection (b)(2)” and inserting “subsection (b)”; and (B) by inserting “In the case of the standard established by paragraphs (22) and (23) of section 111(d), the reference contained in this subsection to the date of enactment of this Act shall be deemed to be a reference to the date of enactment of that paragraph (22) and (23).” after “paragraph (21).”; and (3) by adding at the end the following: “ (i) Other prior state actions Subsections (b) and (c) shall not apply to the standard established by paragraphs (22) and (23) of section 111(d) in the case of any electric utility in a State if, before the date of enactment of this subsection— (1) the State has implemented for the electric utility the standard (or a comparable standard); (2) the State regulatory authority for the State or the relevant nonregulated electric utility has conducted a proceeding to consider implementation of the standard (or a comparable standard) for the electric utility; or (3) the State legislature has voted on the implementation of the standard (or a comparable standard) for the electric utility. .”
Also changed by H.R. 10851, H.R. 10738, H.R. 10322, S. 5159, S. 5028
- Amends
16 U.S.C. 2634
Prior and pending proceedings
This section updates the reference date for prior and pending proceedings to be the date of enactment of the bill for the newly established standard in paragraph (22).
The bill's instruction
Section 124 of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2634) is amended by adding at the end the following: “In the case of the standard established by paragraph (22) of section 111(d), the reference contained in this section to the date of enactment of this Act shall be deemed to be a reference to the date of enactment of that paragraph (22).”.
Also changed by H.R. 10851, H.R. 10738, S. 5159, S. 5028, H.R. 9655
- Adds
26 U.S.C. 48F
Current federal tax law does not include a dedicated investment credit for qualifying water reuse projects. The bill would add Section 48F, establishing a qualifying water reuse project credit equal to 30 percent of the taxpayer's qualified investment in qualified depreciable tangible property placed in service during the tax year. Qualifying projects include those that install, replace, or modify onsite water recycling systems at industrial, manufacturing, data center, or food processing facilities; replace freshwater use with recycled water from a municipal provider; or build or expand municipal recycling systems to secure recycled water. The section also provides rules for property transferred to utilities under written agreements and terminates the credit for projects placed in service more than 10 years after enactment.
The bill's instruction
Subpart E of part IV of subchapter A of chapter 1 of the Internal Revenue Code of 1986 is amended by inserting after section 48E the following new section: “ 48F. Qualifying water reuse project credit (a) In general For purposes of section 46, the qualifying water reuse project credit for any taxable year is an amount equal to 30 percent of the qualified investment for such taxable year with respect to any qualifying water reuse project of the taxpayer. (b) Qualified investment (1) In general For purposes of subsection (a), the qualified investment with respect to any qualifying water reuse project for any taxable year is the basis of qualified property placed in service by the taxpayer during such taxable year which is part of such qualifying water reuse project. (2) Qualified property For purposes of this subsection, the term “qualified property” means property— (A) which is tangible property, (B) with respect to which depreciation (or amortization in lieu of depreciation) is allowable, and (C) which is— (i) constructed, reconstructed, or erected by the taxpayer, or (ii) acquired by the taxpayer if the original use of such property commences with the taxpayer. (3) Certain qualified progress expenditures rules made applicable Rules similar to the rules of subsections (c)(4) and (d) of section 46 (as in effect on the day before the enactment of the Revenue Reconciliation Act of 1990) shall apply for purposes of this section. (c) Qualifying water reuse project For purposes of this section— (1) In general The term “qualifying water reuse project” means a project which— (A) installs, replaces, or modifies an onsite water recycling system within an industrial, manufacturing, data center, or food processing facility, (B) replaces the use of freshwater, such as groundwater, with recycled water from a municipal water provider for the production of goods or provision of services by the taxpayer, or (C) builds or expands a municipal water recycling system for the purpose of securing recycled water for the production of goods or provision of services. (2) Water recycling system The term “water recycling system” means infrastructure needed for the production, storage, conveyance, and use of recycled water. (3) Recycled water The term “recycled water” means former wastewater, including both industrial and municipal wastewater, that has been treated and cleaned for a specific beneficial use. (d) Special rule for certain property transferred to utilities (1) In general In the case of any qualified transfer property transferred from a person to a utility— (A) such property shall be treated as qualified property with respect to such person, (B) such person shall be treated as having placed such property in service at the time of such transfer, (C) the basis of such person in such property which is taken into account under subsection (b)(1) shall be the basis of such person in such property at the time of such transfer, and (D) such property shall not be taken into account for purposes of determining any credit allowed under this section to such utility. (2) Qualified transfer property For purposes of this subsection, the term “qualified transfer property” means property transferred from a person to a utility if— (A) such property is qualified property with respect to such utility, and (B) such person and such utility enter into a binding written agreement under which such person is treated as eligible for the credit allowed under this section with respect to such property in lieu of such utility. (e) Termination This section shall not apply to any qualified investment with respect to any qualifying water reuse project unless such project is placed in service not later than the date which is 10 years after the date of the enactment of this section. .”
Also changed by H.R. 10607, S. 5453, H.R. 9921, S. 4994, S. 4506
- Amends
16 U.S.C. 2621
Consideration and determination respecting certain ratemaking standards
Subsections (d)
Currently, subsection (d) lists 21 federal standards for electric utilities that state regulatory authorities and nonregulated electric utilities must consider adopting under the Public Utility Regulatory Policies Act of 1978. The bill would add two new standards. Paragraph (22) would require rates for "large-load customers" (non-residential retail customers with an aggregate peak electric demand of 100 megawatts or more behind a single interconnection point) to recover the full incremental costs of generation, transmission, or distribution upgrades needed to serve them, including if the customer terminates service, and require upfront financial assurances or contributions. Paragraph (23) would require utilities to consider mechanisms encouraging or requiring large-load customers to develop, acquire, finance, or contractually dedicate new generation resources for their projected load and, where feasible, provide surplus capacity or energy for other customers.
The bill's instruction
Section 111(d) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2621(d)) is amended by adding at the end the following: “ (22) Standards for large-load customers (A) Recovery of full, incremental cost of upgrades A rate charged, or entered into, by an electric utility for providing electric service to a large-load customer shall be designed to recover from the large-load customer the full, incremental cost of any generation, transmission, or distribution upgrade necessary to serve the load of such large-load customer, including in the event of such large-load customer terminating a contract with the electric utility pertaining to the sale of electric energy, or otherwise ceasing the purchase of electric energy from the electric utility. (B) Financial assurances and contributions Before making any generation, transmission, or distribution upgrade that is necessary to serve the load of a large-load customer, an electric utility shall require the large-load customer provide to the electric utility financial assurances or contributions to cover the cost of such upgrade. (C) Large-load customer defined In this paragraph, the term “large-load customer” means a non-residential retail electric customer that, on or after the date of the enactment of this paragraph, requests to enter into, or enters into, a contract pertaining to the sale of electric energy for one or more facilities that— (i) are behind a single point of interconnection; and (ii) have, in the aggregate, a peak electric demand of 100 megawatts or more at a single site or campus. .” Section 111(d) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2621(d)), as amended by section 101 of this Title, is further amended by adding at the end the following: “ (23) Additive generation for large-load customers (A) In general Each electric utility shall consider the establishment of rates, contracts, tariffs, service agreements, or other mechanisms under which service to a large-load customer is encouraged or required to develop, acquire, finance, or contractually dedicate new or incremental generation resources sufficient to serve the projected load of such large-load customer and, where feasible, to provide additional capacity, energy, capacity attributes, or other resource benefits for the benefit of other customers. (B) Additive generation incentive In carrying out subparagraph (A), including as a means of satisfying or supplementing the standard described in paragraph (22), each electric utility shall consider mechanisms under which any capacity, energy, capacity attributes, or other resource benefits in excess of the projected load of such large-load customer may be made available, through long-term contracts or other market-based mechanisms, to load-serving entities serving residential, agricultural, small business, or other existing customers. (C) Flexible implementation A State regulatory authority, with respect to each electric utility for which the State regulatory authority has ratemaking authority, and each nonregulated electric utility may implement the standard under this paragraph through— (i) physical allocation of generating capacity; (ii) long-term power purchase agreements; (iii) contractual or financial arrangements; (iv) market-based mechanisms; (v) tariff conditions or special contracts for large-load customers; or (vi) any other mechanism determined appropriate by the State regulatory authority or nonregulated electric utility. (E) No mandatory resource allocation Nothing in this paragraph shall be construed to require a State regulatory authority or nonregulated electric utility to mandate the physical allocation of generating capacity or to require a uniform percentage set-aside of new or incremental generation resources. (F) Large-load customer defined In this paragraph, the term “large-load customer” has the meaning given such term in paragraph (22)(C). .”
Also changed by H.R. 10851, H.R. 10738, H.R. 10322, S. 5159, S. 5028
Explained by gemini-3.8-flash on November 4, 2026, against the US Code through Public Law 119-136.