American Energy and Mineral Infrastructure Act of 2026
Introduced
In committee
Current stepReported
Not yetPassed Senate
Not yetPassed House
Not yetResolving differences
Not yetSent to the president
Not yetSigned
Not yetBecame law
Not yet
AI-generated from the official bill text and not reviewed by a person. It may contain errors. How summaries are made
The American Energy and Mineral Infrastructure Act of 2026 would amend NEPA, the Clean Water Act, and the Natural Gas Act to expedite environmental reviews, modify water certification rules, allow additional mining mill sites, and restrict judicial remedies against federal permits.
Who it affects
Federal agencies (including FERC, the Environmental Protection Agency, the U.S. Army Corps of Engineers, and the Department of the Interior), state and tribal environmental permitting authorities, natural gas pipeline developers, energy and linear infrastructure companies, and hardrock mining operators.
Based on the Introduced in Senate text · gemini-3.8-flash
Generated October 4, 2026 · Read the official text on Congress.gov
Your Vote
1 key actions of 2: Congress.gov's major actions and roll-call votes.
Introduced in Senate
Recorded by: Library of Congress
Sections of law the bill's Introduced in Senate text would amend, repeal or add to, found in the bill's own text. US Code current through Public Law 119-142.
Explanations are AI-generated from the bill text and the current US Code and not reviewed by a person. They may contain errors; the bill's instruction and the current text are shown so you can check them. How explanations are made
- Amends
42 U.S.C. 4321
Congressional declaration of purpose
Current law sets forth the congressional declaration of purpose for the National Environmental Policy Act of 1969 (NEPA), stating national goals to encourage productive harmony between humans and the environment, prevent environmental damage, enrich ecological understanding, and establish the Council on Environmental Quality. The bill would designate these existing goals as subsection (a) and add subsections (b) and (c). The new subsections would specify that NEPA is a purely procedural statute meant only to ensure that federal agencies consider environmental impacts during decision-making, without prescribing specific results. They would also clarify that nothing in the Act mandates specific environmental outcomes or confers substantive rights or duties beyond procedural requirements.
The bill's instruction
Section 2 of the National Environmental Policy Act of 1969 (42 U.S.C. 4321) is amended— (1) by striking the section designation and heading and all that follows through “are: To” and inserting the following: “ 2. Purposes (a) Purposes The purposes of this Act are to ; and” (2) by adding at the end the following: “ (b) Intent This Act— (1) is a procedural statute intended to ensure Federal agencies consider the environmental impacts of their actions during the decisionmaking process; (2) does not mandate particular results; and (3) only prescribes a purely procedural process. (c) Effect Nothing in this Act— (1) mandates any specific environmental outcome or result; or (2) confers substantive rights or imposes substantive duties beyond procedural requirements. .”
Also changed by S. 5653, S. 3224, H.R. 4776, H.R. 1, H.R. 2347
- Amends
42 U.S.C. 4336
Procedure for determination of level of review
Current law outlines threshold determinations and review levels for federal agencies under NEPA, including when environmental documents are not required and when environmental assessments (EAs) or environmental impact statements (EISs) must be prepared. The bill would expand categorical exclusion options to include those established by Congress, and would exempt an agency from preparing an environmental document if another statute serves a similar function or if a lead agency determines a prior state or tribal review meets NEPA's requirements. It would also clarify that agencies are not required to conduct new scientific or technical research after receiving a permit application. Additionally, the bill would add provisions limiting the scope of review to effects proximately caused by the project (excluding speculative, distant, or separate project effects), establishing a presumption that taking no action on tribal trust resources harms the tribe, and barring other agencies from preparing environmental documents if the lead agency determined none was needed.
The bill's instruction
Section 106 of the National Environmental Policy Act of 1969 (42 U.S.C. 4336) is amended— (1) in the section heading, by inserting “; scope of review” after “level of review”; (2) in subsection (a)— (A) in paragraph (2), by striking “109 of this Act,” and inserting “109, a categorical exclusion established by Congress,”; (B) in paragraph (3), by striking “or”; (C) in paragraph (4), by striking the period at the end and inserting a semicolon; and (D) by adding at the end the following: “ (5) the proposed agency action is an action for which such agency’s compliance with another statute’s requirements serve a similar function as the requirements of this Act with respect to such action; or (6) the proposed agency action— (A) relates to a project or action that has already been reviewed pursuant to a State or Tribal environmental review statute, ordinance, resolution, regulation, or formally adopted policy; and (B) the lead agency determines such review meets the requirements of this Act. ;” (3) in subsection (b)— (A) in paragraph (2), in the first sentence— (i) by striking “does not” and inserting “is not likely to”; and (ii) by striking “109 of this Act,” and inserting “109, a categorical exclusion established by Congress,”; and (B) in paragraph (3), by striking subparagraph (B) and inserting the following: “ (B) is not required to undertake new scientific or technical research— (i) unless the new scientific or technical research is essential to a reasoned choice among alternatives, and the overall costs and time frame of obtaining it are not unreasonable; or (ii) after the receipt of an application, as applicable, with respect to such proposed agency action. ; and” (4) by adding at the end the following: “ (c) Scope of review In preparing an environmental document for a proposed agency action, a Federal agency— (1) may only consider effects that share a reasonably close causal relationship to, and are proximately caused by, the immediate project or action under consideration; and (2) may not consider effects that are speculative, attenuated from the project or action, separate in time or place from the project or action, or in relation to separate existing or potential future projects or actions. (d) Presumption of negative impacts of taking no action relating to tribal trust resources For any proposed agency action carried out on, or directly affecting, Tribal trust resources (including land and minerals) that is initiated by the federally recognized Indian Tribe for which the United States holds the affected resources in trust, and for which an environmental document was prepared that included consideration of a no action alternative, there shall be a presumption that the effects of taking no action will be negative for the federally recognized Indian Tribe. (e) Effect of threshold determinations on other agencies If a lead agency determines that an environmental document is not required to be prepared with respect to a proposed agency action under subsection (a), no other Federal agency may prepare an environmental document with respect to the proposed agency action. .”
Also changed by S. 5653, H.R. 10261, H.R. 8249, S. 3224, H.R. 4776
- Amends
42 U.S.C. 4336a
Timely and unified Federal reviews
Subsections (a), (b), (d), (g)
Current law directs lead agencies to supervise environmental reviews, set schedules, cooperate with other agencies, and meet specific deadlines and page limits for EAs and EISs. The bill would tie the lead agency's scheduling and cooperating agency participation directly to statutory deadline rules, specify that cooperating local agencies include political subdivisions like counties, parishes, and boroughs, and limit federal cooperating agency comments to matters within their legal jurisdiction. It would also require the purpose and need statement to meet the applicant's goals where applicable. Furthermore, the bill would establish that agencies are not required to consider new scientific or technical research that becomes publicly available after an application is received or after a notice of intent to prepare an environmental document is published (whichever is earlier), and prohibits agencies from delaying reviews to await new research.
The bill's instruction
Section 107(a) of the National Environmental Policy Act of 1969 (42 U.S.C. 4336a(a)) is amended— (A) in paragraph (2)— (i) in subparagraph (B), by striking “at the earliest practicable time” and inserting “in accordance with subsection (g)(2)”; (ii) in subparagraph (D), by striking “carry out the proposed agency action” and inserting “carry out the proposed agency action in accordance with the deadlines described in subsection (g)”; and (iii) in subparagraph (E)— (I) by striking “a review” and inserting “an environmental review”; and (II) by striking “such review” and inserting “such environmental review”; and (B) in paragraph (3)— (i) in the first sentence, by inserting “(including counties, boroughs, parishes, and other political subdivisions of a State)” after “local agency”; and (ii) by adding at the end the following: “Such comments from Federal cooperating agencies shall be limited to matters relating to the proposed agency action with respect to which the Federal cooperating agency has jurisdiction by law.”. Section 107(b) of the National Environmental Policy Act of 1969 (42 U.S.C. 4336a(b)) is amended— (A) by striking “To the extent practicable,” and inserting the following: “ (1) Document To the extent practicable, ; and” (B) by adding at the end the following: “ (2) Consideration timing (A) In general In preparing an environmental document for a proposed agency action, no Federal agency shall be required to consider any scientific or technical research that becomes publicly available after the earlier of, as applicable— (i) the date of receipt of an application with respect to such proposed agency action; and (ii) the date of publication of a notice of intent or decision to prepare such environmental document for such proposed agency action. (B) Applicability to other law Nothing in this paragraph affects any review of information required under subchapter II of chapter 5 of title 5, United States Code, with respect to comments received during the public comment period as applicable. (C) Delay A Federal agency may not delay the issuance of an environmental document or a final agency action, including any decision or determination, on the basis of awaiting new scientific or technical research or information that was not available as of the earlier of the dates described in subparagraph (A). .” Section 107(d) of the National Environmental Policy Act of 1969 (42 U.S.C. 4336a(d)) is amended by striking the period at the end and inserting “, which shall, where applicable, meet the goals of the applicant.”.
- Amends
42 U.S.C. 4336b
Programmatic environmental document
Current law allows agencies that prepare a programmatic environmental document to rely on its analysis for subsequent related actions within 5 years without additional review, and after 5 years if the agency reevaluates the analysis and assumptions. The bill would extend that 5-year reliance period to 10 years. It would also allow a lead agency to satisfy NEPA requirements for a new major federal action by relying on an existing EA, EIS, or categorical exclusion from any federal agency or supervised sponsor if the action and its effects are substantially the same, or by modifying and republishing existing documents if the new action is not substantially the same.
The bill's instruction
Section 108 of the National Environmental Policy Act of 1969 (42 U.S.C. 4336b) is amended— (1) in the matter preceding paragraph (1), by striking “When an agency prepares” and inserting the following: “ (a) Programmatic environmental documents When an agency prepares ;' ” (2) in subsection (a) (as so designated)— (A) in paragraph (1), by striking “5” and inserting “10”; and (B) in paragraph (2), by striking “5” and inserting “10”; and (3) by adding at the end the following: “ (b) Reliance on previously completed environmental reviews (1) Actions that are substantially the same A lead agency may satisfy the requirements of this Act with respect to a major Federal action by relying on an environmental assessment, environmental impact statement, or a categorical exclusion determination that the lead agency, another Federal agency, or a project sponsor under the supervision of a Federal agency completed for another major Federal action if the lead agency determines that— (A) the new major Federal action is substantially the same as the other major Federal action or, if applicable, an alternative analyzed in such environmental assessment or environmental impact statement; and (B) if applicable, the effects of the new major Federal action are substantially the same as the effects analyzed in such environmental assessment or environmental impact statement. (2) Actions that are not substantially the same (A) In general If a new major Federal action is not substantially the same as another major Federal action or an alternative analyzed in an environmental assessment or environmental impact statement completed by the lead agency, another Federal agency, or a project sponsor under the supervision of a Federal agency, the lead agency may modify or augment any such previously completed environmental assessment or environmental impact statement as necessary to satisfy the requirements of this Act with respect to the new major Federal action. (B) Public availability The lead agency shall make any environmental assessment or environmental impact statement modified under subparagraph (A) publicly available as a new environmental assessment or environmental impact statement. .”
Also changed by S. 5653, H.R. 6163, S. 3224, H.R. 4776, H.R. 2347
- Amends
42 U.S.C. 4336c
Adoption of categorical exclusions
Current law permits a federal agency to adopt a categorical exclusion listed in another agency's NEPA procedures by following a four-step process, which includes identifying the exclusion, consulting with the establishing agency, notifying the public, and documenting the adoption. The bill would amend this section to allow agencies to also adopt categorical exclusions that were legislatively enacted or established by Congress, and would make interagency consultation required only "if applicable" (such as when the exclusion is not created by Congress).
The bill's instruction
Section 109 of the National Environmental Policy Act of 1969 (42 U.S.C. 4336c) is amended— (1) in the matter preceding paragraph (1), in the first sentence, by inserting “, or that was legislatively enacted by Congress,” after “procedures”; (2) in paragraph (1), by inserting “, or that was established by Congress,” after “procedures”; and (3) in paragraph (2), by inserting “if applicable,” before “consult”.
- Amends
42 U.S.C. 4336e
Definitions
Current law defines key terms used in NEPA, including categorical exclusion, major Federal action, and programmatic environmental document. The bill would define "authorization" as any federal permit, license, lease, right-of-way, or administrative approval needed for a project. It would also define "reasonably foreseeable" environmental effects as those with a close causal link proximately caused by the action, explicitly excluding speculative, attenuated, or unrelated project effects. Additionally, the bill would broaden exclusions from the definition of "major Federal action" to include grants, cost-share awards, certain Farm Service Agency loan guarantees, and actions where another agency is already handling NEPA compliance. It would explicitly state that providing federal funding cannot be the sole basis for designating an activity as a major federal action.
The bill's instruction
Section 111 of the National Environmental Policy Act of 1969 (42 U.S.C. 4336e) is amended— (1) in paragraph (1), by inserting “, or Congress deems by statute,” after “Federal agency has determined”; (2) by redesignating paragraphs (1), (2), (3), (4), (5), (6), (7), (8), (11), (12), and (13) as paragraphs (2), (3), (4), (5), (6), (7), (8), (11), (12), (13), and (15), respectively, and moving all paragraphs of the section so as to appear in numerical order; (3) by inserting before paragraph (2) (as so redesignated) the following: “ (1) Authorization The term authorization means any lease, right-of-way, easement, license, permit, approval, finding, determination, or other administrative decision issued by an agency, or any interagency consultation, that is required or authorized under Federal law in order to construct, modify, or operate a project. ;” (4) in paragraph (10)— (A) in subparagraph (B)— (i) in clause (iii)— (I) by inserting “grants (including capitalization grants), cost share awards,” after “loan guarantees,”; (II) by striking “sufficient” and inserting “complete”; and (III) by striking “subsequent use of such financial assistance or the”; (ii) in clause (iv), by striking “section 7(a) or (b) and of the Small Business Act ( U.S.C. 636(a)), or” and inserting “subsection (a) or (b) of section 7 of the Small Business Act (15 U.S.C. 636) or”; (iii) by redesignating clauses (iv) through (vii) as clauses (vi) through (ix), respectively; (iv) by inserting after clause (iii) the following: “ (iv) farm ownership and operating loan guarantees by the Farm Service Agency pursuant to section 305 and subtitle B of the Consolidated Farm and Rural Development Act (7 U.S.C. 1925, 1941 et seq.); (v) the issuance of a permit or other authorization by a Federal agency where the proposal under consideration is otherwise being evaluated or was previously evaluated by the lead agency in compliance with this Act; ; and” (v) in clause (viii) (as so redesignated), by striking “entirely”; and (B) by adding at the end the following: “ (C) Additional exclusions An agency action may not be determined to be a major Federal action solely on the basis of the provision of Federal funds, including a grant, loan, loan guarantee, and funding assistance. ; and” (5) by inserting after paragraph (13) (as so redesignated) the following: “ (14) Reasonably foreseeable (A) In general The term reasonably foreseeable, with respect to environmental effects of a proposed agency action, means effects that share a reasonably close causal relationship to, and are proximately caused by, the immediate project or action under consideration. (B) Exclusions The term reasonably foreseeable, with respect to environmental effects of a proposed agency action, does not include effects that are— (i) speculative; (ii) attenuated from the proposed agency action; (iii) separate in time or place from the proposed agency action; or (iv) in relation to separate existing or potential future projects. .”
Also changed by S. 5653, H.R. 8249, S. 3224, H.R. 4776, H.R. 2347
- Amends
42 U.S.C. 4336f
Project sponsor opt-in fees for environmental reviews
This section currently establishes a mechanism where project sponsors can pay optional fees to expedite environmental assessments and environmental impact statements, numbered as section 112 of NEPA (42 U.S.C. 4336f). The bill would redesignate the provision as section 110A of the Act and move it to appear immediately after section 110.
The bill's instruction
by redesignating section 112 (42 U.S.C. 4336f) as section 110A, and moving the section so as to appear after section 110; and
Also changed by S. 4475
- Amends
42 U.S.C. 4344
Duties and functions
Subsections (4)
Current law tasks the Council on Environmental Quality with developing and recommending national policies to improve environmental quality to meet the conservation, social, economic, health, and other goals of the nation. The bill would amend paragraph (4) of this section to add "energy" to that list of national goals and requirements.
The bill's instruction
Section 204(4) of the National Environmental Policy Act of 1969 (42 U.S.C. 4344(4)) is amended by inserting “energy,” after “health,”.
- Amends
33 U.S.C. 1342
National pollutant discharge elimination system
Subsections (a), (b)(1)(B)
Current law establishes the National Pollutant Discharge Elimination System (NPDES), authorizing the Environmental Protection Agency (EPA) and approved state programs to issue permits for the discharge of pollutants into navigable waters for terms not exceeding 5 years. The bill would increase the maximum term for approved state NPDES permits from 5 years to 10 years under subsection (b)(1)(B). It would also add paragraph (6) to subsection (a), granting the EPA Administrator clear authority to issue general permits on a state, regional, nationwide, or delineated area basis. If the EPA decides not to reissue a general permit covering similar discharges, it would have to give 2 years' advance notice in the Federal Register. If a permit expires without such notice, its terms would automatically continue to cover existing and qualifying new discharges until a replacement permit is issued or 2 years after notice is published.
The bill's instruction
Section 402(a) of the Federal Water Pollution Control Act (33 U.S.C. 1342(a)) is amended by adding at the end the following: “ (6) General permits (A) Permits authorized The Administrator may issue general permits under this section on a State, regional, or nationwide basis, or for a delineated area, for discharges associated with any category of activities the discharges of which are of similar types and from similar sources. (B) Permit expiration notification If the Administrator does not intend to issue a general permit under this paragraph that covers discharges that are substantially similar to discharges covered by a previously issued general permit, not later than the date that is 2 years before the date on which the previously issued general permit will expire, the Administrator shall publish in the Federal Register a notice of the decision not to reissue the general permit. (C) Application of permit terms of an expired permit (i) In general If a general permit issued under this paragraph expires and the Administrator has not published a notice under subparagraph (B), the Administrator shall, until the date described in clause (ii)— (I) continue to apply the terms, conditions, and requirements of the expired general permit to any discharge that was covered by the expired general permit; and (II) apply those terms, conditions, and requirements to any discharge that would have been covered by the expired general permit (in accordance with any relevant requirements for that coverage) if the discharge had occurred before that expiration. (ii) Date described The date referred to in clause (i) is the date that is the earlier of— (I) the date on which the Administrator issues a new general permit for discharges substantially similar to those covered by the expired general permit; and (II) the date that is 2 years after the date on which the Administrator publishes in the Federal Register a notice described in subparagraph (B). .” Section 402(b)(1)(B) of the Federal Water Pollution Control Act (33 U.S.C. 1342(b)(1)(B)) is amended by striking “five years” and inserting “10 years”.
Also changed by S. 5653, H.R. 6090, H.R. 4879, H.R. 3897, H.R. 3898
- Amends
15 U.S.C. 717r
Rehearing and review
Current law under Section 19 of the Natural Gas Act governs rehearing and judicial review of orders issued by the Federal Energy Regulatory Commission (FERC), granting federal courts of appeals jurisdiction to affirm, modify, set aside, or remand agency orders regarding natural gas facilities. The bill would update a cross-reference regarding Supreme Court review and add a limitation on judicial remedies for orders under sections 3 or 7 of the Act. Specifically, the court could not set aside, vacate, or void a FERC order or action. Instead, if the court finds an agency action prevents facility construction or operation and violates federal law or lacks clear and convincing evidence, it would be required to remand the matter to the agency for appropriate action without vacating the permit or issuing an injunction.
The bill's instruction
Section 19 of the Natural Gas Act (15 U.S.C. 717r) is amended— (1) in subsection (b), in the eighth sentence, by striking “certification” and all that follows through the period at the end and inserting “certification as provided in section 1254 of title 28, United States Code.”; and (2) in subsection (d)— (A) in paragraph (3), in the first sentence, by striking “If the Court finds” and inserting the following: “Except as provided in paragraph (6), if the Court finds”; and (B) by adding at the end the following: “ (6) Exception for certain orders or actions (A) In general Notwithstanding any other provision of this section, for petitions challenging an order or action taken by the Commission under section 3 or section 7, the court may not set aside, vacate, or otherwise void that order or action. (B) Court action Notwithstanding chapter 7 of title 5, United States Code, the Court shall remand the proceeding, without vacatur or injunction, to the applicable Federal or State agency to take appropriate action if the Court finds that an order or action described in paragraph (1)— (i) would prevent the construction, expansion, or operation of the facility subject to section 3 or 7; and (ii) (I) is inconsistent with applicable Federal law; or (II) is not supported by clear and convincing evidence. .”
Also changed by H.R. 10500, S. 4765
- Amends
30 U.S.C. 28f
Fee
Current law establishes an annual claim maintenance fee of $100 per claim or site for unpatented lode mining claims, placer claims, mill sites, and tunnel sites, which substitutes for annual assessment work requirements. The bill would update statutory cross-references by replacing references to "the Mining Law of 1872 (30 U.S.C. 28–28e)" with citations to sections 2319 through 2344 of the Revised Statutes (30 U.S.C. 22 et seq.). It would also restructure subsections (a) and (b) into designated subparagraphs and paragraphs without altering the substantive fee amounts or deadlines.
The bill's instruction
Section 10101 of the Omnibus Budget Reconciliation Act of 1993 (30 U.S.C. 28f) is amended— (1) by striking “the Mining Law of 1872 (30 U.S.C. 28–28e)” each place it appears and inserting “sections 2319 through 2344 of the Revised Statutes (30 U.S.C. 22 et seq.)”; (2) in subsection (a)— (A) in paragraph (1)— (i) in the second sentence, by striking “Such claim maintenance fee” and inserting the following: “ (B) Fee The claim maintenance fee under subparagraph (A) ; and” (ii) in the first sentence, by striking “The holder of” and inserting the following: “ (A) In general The holder of ; and” (B) in paragraph (2)— (i) in the second sentence— (I) by striking “the Mining Law of 1872 (30 U.S.C. 28 to 28e)” and inserting “sections 2319 through 2344 of the Revised Statutes (30 U.S.C. 22 et seq.)”; and (II) by striking “Such claim maintenance fee” and inserting the following: “ (B) Fee The claim maintenance fee under subparagraph (A) ; and” (ii) in the first sentence, by striking “The holder of” and inserting the following: “ (A) In general The holder of ; and” (3) in subsection (b)— (A) in the second sentence, by striking “The location fee” and inserting the following: “ (2) Fee The location fee ; and” (B) in the first sentence, by striking “The claim main tenance fee” and inserting the following: “ (1) In general The claim maintenance fee .”
Also changed by S. 5653, S. 4795, S. 4765, H.R. 6674, H.R. 4754
- Amends
30 U.S.C. 42
Patents for nonmineral lands: application, survey, notice, acreage limitation, payment
Current law allows owners of lode or placer mining claims to obtain patents for nonadjacent, nonmineral land for milling or mining purposes, capping each mill site location at 5 acres. The bill would add subsection (c) to authorize claim holders to locate as many 5-acre mill sites on public land (whether mineral-in-character, nonmineral, or undetermined) as are reasonably necessary for waste rock, tailings disposal, or mining operations under an approved plan of operations. These mill sites would not grant mineral rights and could not be patented. The amendment text provided in the bill was truncated at the end of paragraph (8), so any subsequent savings provisions in that subsection were not fully available.
The bill's instruction
Section 2337 of the Revised Statutes (30 U.S.C. 42) is amended by adding at the end the following: “ (c) Additional mill sites (1) Definitions In this subsection: (A) Mill site The term mill site means a location of public land that is reasonably necessary for waste rock or tailings disposal or other operations reasonably incident to mineral development on, or production from land included in a plan of operations. (B) Operations; Operator The terms operations and operator have the meanings given those terms in section 3809.5 of title 43, Code of Federal Regulations (as in effect on the date of enactment of this subsection). (C) Plan of operations The term plan of operations means a plan of operations that an operator must submit and the Secretary of the Interior or the Secretary of Agriculture, as applicable, must approve before an operator may begin operations, in accordance with, as applicable— (i) subpart 3809 of title 43, Code of Federal Regulations (or successor regulations establishing application and approval requirements); and (ii) part 228 of title 36, Code of Federal Regulations (or successor regulations establishing application and approval requirements). (D) Public land The term public land means land owned by the United States that is open to location under sections 2319 through 2344 of the Revised Statutes (30 U.S.C. 22 et seq.), including— (i) land that is mineral-in-character (as defined in section 3830.5 of title 43, Code of Federal Regulations (as in effect on the date of enactment of this subsection)); (ii) nonmineral land (as defined in section 3830.5 of title 43, Code of Federal Regulations (as in effect on the date of enactment of this subsection)); and (iii) land where the mineral character has not been determined. (2) In general Notwithstanding subsections (a) and (b), where public land is needed by the proprietor of a lode or placer claim for operations in connection with any lode or placer claim within the proposed plan of operations, the proprietor may— (A) locate and include within the plan of operations as many mill site claims under this subsection as are reasonably necessary for its operations; and (B) use or occupy public land in accordance with an approved plan of operations. (3) Mill sites convey no mineral rights A mill site under this subsection does not convey mineral rights to the locator. (4) Size of mill sites A location of a single mill site under this subsection shall not exceed 5 acres. (5) Mill site and lode or placer claims on same tracts of public land A mill site may be located under this subsection on a tract of public land on which the claimant or operator maintains a previously located lode or placer claim. (6) Effect on mining claims The location of a mill site under this subsection shall not affect the validity of any lode or placer claim, or any rights associated with such a claim. (7) Patenting A mill site under this section shall not be eligible for patenting. (8) Savings provisions Nothing in this subsection— (A) diminishes any right (including a right of entry, use, or occupancy) of a claimant; (B) creates or increases any right (including a right of exploration, entry, use, or occupancy) of a claimant on land that is not open to location under the general mining laws; (C) modifies any provision of law or any prior administrative action withdrawing land from location or entry; (D) limits the right of the Federal Government to regulate mining and mining-related activities (including requiring claim validity examinations to establish the discovery of a valuable mineral deposit) in areas withdrawn from mining, including under— (i) the general mining laws; (ii) the Federal Land Policy and Management Act of 1976 (43 U.S.C. 1701 et seq.); (iii) the Wilderness Act (16 U.S.C. 1131 et seq.); (iv) sections 100731 through 100737 of title 54, United States Code; (v) the Endangered Species Act of 1973 (16 U.S.C. 1531 et seq.); (vi) division A of subtitle III of title 54, United States Code (commonly referred to as the ‘National Historic Preservation Act’); or (v
Also changed by S. 5653, S. 4795, S. 4765, H.R. 4754, H.R. 2347
- Amends
33 U.S.C. 1344
Permits for dredged or fill material
Current law under Section 404(c) of the Clean Water Act authorizes the EPA Administrator to prohibit, withdraw, deny, or restrict the use of any defined area as a disposal site for dredged or fill material whenever the discharge would have an unacceptable adverse effect on municipal water, wildlife, fisheries, or recreation. The bill would restructure subsection (c) into numbered paragraphs and establish a specific time window during which the Administrator may exercise this veto or restriction authority. Under the new limitation, the EPA Administrator could only prohibit or restrict a disposal site during the period starting when the applicant submits a complete permit application and ending when the Secretary of the Army issues the permit.
The bill's instruction
Section 404(c) of the Federal Water Pollution Control Act (33 U.S.C. 1344(c)) is amended— (A) in the third sentence— (i) by striking “his findings and his reasons” and inserting “the findings and reasons of the Administrator”; and (ii) by striking “The Administrator” and inserting the following: “ (4) Written determination The Administrator ;” (B) in the second sentence, by striking “Before making such determination,” and inserting the following: “ (3) Consultation Before making a determination under paragraph (1), ;” (C) by striking “(c) The Administrator” and inserting the following: “ (c) Specification or use of defined area (1) In general The Administrator ;” (D) in paragraph (1) (as so designated)— (i) by striking “he is authorized”; and (ii) by striking “he determines, after notice and opportunity for public hearings,” and inserting “the Administrator determines, during the period described in paragraph (2) and after notice and opportunity for public hearings,”; and (E) by inserting after paragraph (1) (as so designated) the following: “ (2) Period of prohibition The period during which the Administrator may prohibit the specification (including the withdrawal of specification) of a defined area as a disposal site, or deny or restrict the use of a defined area for specification (including the withdrawal of specification) as a disposal site, under paragraph (1) is the period that— (A) begins on the date on which an applicant submits all the information required to complete an application for a permit under this section; and (B) ends on the date on which the Secretary issues the permit. .”
Also changed by S. 5653, S. 4956, S. 4475, H.R. 6693, H.R. 3898
- Amends
33 U.S.C. 1341
Certification
Current law under Section 401 of the Clean Water Act requires any applicant for a federal license or permit involving activities that may result in a discharge into navigable waters to obtain a state or interstate water quality certification, which is waived if the agency does not act within a reasonable period not exceeding one year. The bill would amend paragraph (1) to limit the certification requirement specifically to activities resulting in a discharge "directly into" navigable waters and restrict the review criteria solely to compliance with enumerated federal water quality provisions. It would require certifying authorities to publish certification requirements within 30 days and provide written requests for missing information within 90 days. Because the provided bill instructions were cut off in mid-sentence under subparagraph (E), the complete proposed rules regarding the receipt definition were not fully available in the text.
The bill's instruction
Section 401 of the Federal Water Pollution Control Act (33 U.S.C. 1341) is amended— (1) in subsection (a)— (A) by striking “(a)(1) Any applicant” and all that follows through “No license” in the sixth sentence of paragraph (1) and inserting the following: “ (a) Compliance with applicable requirements (1) Certification required (A) In general Any applicant for a Federal license or permit to conduct any activity, including the construction or operation of facilities, which may result in a discharge directly into the navigable waters shall provide the licensing or permitting agency a certification from the State in which the discharge originates or will originate or, if appropriate, from the interstate water pollution control agency having jurisdiction over the navigable waters at the point where the discharge originates or will originate, that any such discharge will comply with the applicable provisions of sections 301, 302, 303, 306, and 307. (B) Certification of no applicable limitation In the case of any discharge described in subparagraph (A) for which there is not an applicable effluent limitation or other limitation under sections 301(b) and 302, and there is not an applicable standard under sections 306 and 307, the State, interstate water pollution control agency, or Administrator, as applicable, shall so certify, except that any such certification shall not be deemed to satisfy section 511(c). (C) Certification by the administrator In any case in which a State or interstate water pollution control agency has no authority to give a certification under subparagraph (A)— (i) the certification shall be from the Administrator; and (ii) subsection (d) shall apply to the request for certification. (D) Procedures required (i) In general The Administrator and each State and interstate water pollution control agency that has authority to give a certification under this subsection shall establish procedures for public notice in the case of all requests for certification under this subsection by the State, interstate water pollution control agency, or Administrator, as applicable, and, to the extent that the State, interstate water pollution control agency, or Administrator determines it appropriate, procedures for public hearings in connection with specific requests. (ii) Decision criteria A decision to grant or deny a request for certification under this subsection shall be based solely on whether the discharge complies with the applicable provisions of sections 301, 302, 303, 306, and 307, and the grounds for that decision shall be set forth in writing and provided to the applicant. (iii) Deadline for requesting additional information Not later than 90 days after the date on which a State, an interstate water pollution control agency, or the Administrator, as applicable, receives a request for certification under this subsection, the State, interstate water pollution control agency, or Administrator shall identify in writing any specific additional materials or information necessary for the request for certification to be considered complete pursuant to subsection (d). (iv) Publication requirement Not later than 30 days after the date of enactment of this clause, the Administrator and each State and interstate water pollution control agency that has authority to give a certification under this subsection shall publish the requirements for a certification under this subsection for an applicant to use to demonstrate to the Administrator, State, or interstate water pollution control agency, as applicable, compliance with the applicable provisions of sections 301, 302, 303, 306, and 307. (E) Decisionmaking (i) Definition of receipt In this subparagraph, the term receipt, with respect to a request for certification under this subsection, means the date on which the State, interstate water pollution control agency, or Administrator, as applicable, initially receives the request for certification, regardless of whether the request for certification is determined to be complete or additional information is request
Also changed by S. 5653, H.R. 9855, S. 4475, H.R. 3898, H.R. 3928
Explained by gemini-3.8-flash on November 5, 2026, against the US Code through Public Law 119-136.