Power for the People Act of 2026
Introduced
In committee
Current stepReported
Not yetPassed Senate
Not yetPassed House
Not yetResolving differences
Not yetSent to the president
Not yetSigned
Not yetBecame law
Not yet
AI-generated from the official bill text and not reviewed by a person. It may contain errors. How summaries are made
The Power for the People Act of 2026 would require federal grid rules for data center interconnection queues and cost allocations, while encouraging states to establish specific electricity rate classes for large data centers to protect general ratepayers.
Who it affects
This bill directly affects large, non-federal data center owners and operators demanding over 50 megawatts, electric grid operators (including Regional Transmission Organizations, Independent System Operators, and transmitting utilities), public and nonregulated electric utilities, state utility regulatory authorities, the Federal Energy Regulatory Commission, the Department of Energy, and construction workers and contractors involved in building data centers and associated power supplies.
Based on the Introduced in Senate text · gemini-3.8-flash
Generated October 5, 2026 · Read the official text on Congress.gov
Your Vote
1 key actions of 2: Congress.gov's major actions and roll-call votes.
Introduced in Senate
Recorded by: Library of Congress
Sections of law the bill's Introduced in Senate text would amend, repeal or add to, found in the bill's own text. US Code current through Public Law 119-142.
- Amends
16 U.S.C. 2621
Consideration and determination respecting certain ratemaking standards
Subsections (d)
No AI explanation of this change yet.
The bill's instruction
Section 111(d) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2621(d)) is amended by adding at the end the following: “ (22) Data centers (A) Definitions In this paragraph, the terms data center, data center owner or operator, and load interconnection request have the meanings given those terms in section 3 of the Power for the People Act of 2026. (B) Standard Each State in which at least 1 data center is located or has been proposed via load interconnection request, legal filing, or public announcement shall consider— (i) establishing a rate class specific to data centers to ensure that data center owners and operators are covering the full cost of the generation, transmission, and distribution upgrades necessary to serve data centers; and (ii) including as requirements for the data center rate class, in addition to any other potential requirements the State chooses to examine— (I) minimum demand charges for data center owners and operators based on requested peak electricity demand if the monthly usage of a data center is less than its requested demand to ensure that ratepayers are not paying increased costs for generation and transmission built to serve data centers; (II) an extension of minimum utility contract lengths for data center customers to ensure that data center load does not leave utilities and ratepayers with stranded costs; (III) an increase in up-front interconnection study costs, deposit amounts, or collateral requirements for data center projects to ensure that the interconnection queue is not slowed down by projects that are unlikely to come to fruition; (IV) permissible “load ramp” periods for data centers that allow data center customers to start service with a lower-than-requested capacity and gradually increase their power demand over a period of multiple years to reach their full requested capacity, subject to the condition that flexible load interconnection pursuant to this subclause does not undermine grid reliability; (V) a “clean transition tariff” that allows data center customers to financially support novel zero-emissions energy technologies to meet their electricity demand in cooperation with intermediaries, such as a utility company; and (VI) the use of contribution in aid of construction (commonly referred to as “CIAC”) as a tool to have the data center customer pay upfront for the utility investment determined to be the responsibility of that data center. .”
Also changed by H.R. 10851, H.R. 10738, H.R. 10322, S. 5159, S. 5028
- Amends
16 U.S.C. 2622
Obligations to consider and determine
No AI explanation of this change yet.
The bill's instruction
Section 112(b) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2622(b)) is amended— (A) in paragraph (8), by indenting subparagraph (B) appropriately; and (B) by adding at the end the following: “ (9) (A) Not later than 1 year after the date of enactment of this paragraph, each State regulatory authority (with respect to each electric utility for which the State has ratemaking authority) and each nonregulated electric utility shall commence consideration under section 111, or set a hearing date for consideration, with respect to the standard established by paragraph (22) of section 111(d). (B) Not later than 2 years after the date of enactment of this paragraph, each State regulatory authority (with respect to each electric utility for which the State has ratemaking authority), and each nonregulated electric utility shall complete the consideration and make the determination under section 111 with respect to the standard established by paragraph (22) of section 111(d). .” Section 112(c) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2622(c)) is amended by adding at the end the following: “In the case of the standard established by paragraph (22) of section 111(d), the reference contained in this subsection to the date of enactment of this Act shall be deemed to be a reference to the date of enactment of that paragraph (22).”. Section 112 of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2622) is amended— (i) in subsection (h), in the subsection heading, by striking “Other”; and (ii) by adding at the end the following: “ (i) Prior State actions Subsections (b) and (c) shall not apply to the standard established by paragraph (22) of section 111(d) in the case of any electric utility in a State if, before the date of enactment of this subsection— (1) the State has implemented the standard (or a comparable standard) for the electric utility; (2) the State regulatory authority for the State or the relevant nonregulated electric utility has conducted a proceeding to consider implementation of the standard (or a comparable standard) for the electric utility; or (3) the State legislature has voted on the implementation of the standard (or a comparable standard) for the electric utility. .”
Also changed by H.R. 10851, H.R. 10738, H.R. 10322, S. 5159, S. 5028
- Amends
16 U.S.C. 2634
Prior and pending proceedings
No AI explanation of this change yet.
The bill's instruction
Section 124 of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2634) is amended by adding at the end the following: “In the case of the standard established by paragraph (22) of section 111(d), the reference contained in this section to the date of enactment of this Act shall be deemed to be a reference to the date of enactment of that paragraph (22).”.
Also changed by H.R. 10851, H.R. 10738, S. 5159, S. 5028, H.R. 9655