Skip to main content
H.R. 8241In committeeEnergy

Power for the People Act of 2026

DemocratPaul Tonko
Introduced April 9, 2026Origin: House

  1. Introduced

  2. In committee

    Current step
  3. Reported

    Not yet
  4. Passed House

    Not yet
  5. Passed Senate

    Not yet
  6. Resolving differences

    Not yet
  7. Sent to the president

    Not yet
  8. Signed

    Not yet
  9. Became law

    Not yet

AI-generated from the official bill text and not reviewed by a person. It may contain errors. How summaries are made

The Power for the People Act of 2026 would require electric grid operators to establish data center load queues, prioritize clean-powered facilities, assign local transmission upgrade costs directly to data centers, and encourage states to adopt data center-specific utility rate classes.

Who it affects

The bill directly applies to large non-federal data centers with over 50 megawatts of electricity demand and their owners, operators, and construction contractors. It also regulates grid operators (such as Regional Transmission Organizations, Independent System Operators, and transmitting utilities), public electric utilities, state utility regulatory authorities, nonregulated electric utilities, the Federal Energy Regulatory Commission, and the Department of Energy.

Based on the Introduced in House text · gemini-3.8-flash

Generated October 5, 2026 · Read the official text on Congress.gov

Your Vote

1 key actions of 2: Congress.gov's major actions and roll-call votes.

  1. Introduced in House

    Recorded by: Library of Congress

Sections of law the bill's Introduced in House text would amend, repeal or add to, found in the bill's own text. US Code current through Public Law 119-142.

Explanations are AI-generated from the bill text and the current US Code and not reviewed by a person. They may contain errors; the bill's instruction and the current text are shown so you can check them. How explanations are made

  • Amends

    16 U.S.C. 2621

    Consideration and determination respecting certain ratemaking standards

    Subsections (d)

    Currently, Section 111(d) of the Public Utility Regulatory Policies Act of 1978 sets federal ratemaking standards that state regulatory authorities and nonregulated electric utilities must consider, such as net metering, integrated resource planning, and electric vehicle charging programs. The bill would add a new federal standard requiring each state that has or has proposed at least one data center to consider establishing a specific rate class for data centers. This rate class would be designed to ensure data center owners and operators cover the full cost of needed generation, transmission, and distribution upgrades. In evaluating the rate class, states would consider several potential requirements, including minimum demand charges based on requested peak demand, longer utility contract lengths, increased up-front interconnection study costs or collateral, multi-year load ramp periods that do not compromise reliability, clean transition tariffs supporting zero-emissions technologies, and contributions in aid of construction for upfront utility investments.

    The bill's instruction

    Section 111(d) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2621(d)) is amended by adding at the end the following: “ (22) Data centers (A) Definitions In this paragraph, the terms data center, data center owner or operator, and load interconnection request have the meanings given those terms in section 3 of the Power for the People Act of 2026. (B) Standard Each State in which at least 1 data center is located or has been proposed via load interconnection request, legal filing, or public announcement shall consider— (i) establishing a rate class specific to data centers to ensure that data center owners and operators are covering the full cost of the generation, transmission, and distribution upgrades necessary to serve data centers; and (ii) including as requirements for the data center rate class, in addition to any other potential requirements the State chooses to examine— (I) minimum demand charges for data center owners and operators based on requested peak electricity demand if the monthly usage of a data center is less than its requested demand to ensure that ratepayers are not paying increased costs for generation and transmission built to serve data centers; (II) an extension of minimum utility contract lengths for data center customers to ensure that data center load does not leave utilities and ratepayers with stranded costs; (III) an increase in up-front interconnection study costs, deposit amounts, or collateral requirements for data center projects to ensure that the interconnection queue is not slowed down by projects that are unlikely to come to fruition; (IV) permissible “load ramp” periods for data centers that allow data center customers to start service with a lower-than-requested capacity and gradually increase their power demand over a period of multiple years to reach their full requested capacity, subject to the condition that flexible load interconnection pursuant to this subclause does not undermine grid reliability; (V) a “clean transition tariff” that allows data center customers to financially support novel zero-emissions energy technologies to meet their electricity demand in cooperation with intermediaries, such as a utility company; and (VI) the use of contribution in aid of construction (commonly referred to as “CIAC”) as a tool to have the data center customer pay upfront for the utility investment determined to be the responsibility of that data center. .”

    Also changed by H.R. 10851, H.R. 10738, H.R. 10322, S. 5159, S. 5028

  • Amends

    16 U.S.C. 2622

    Obligations to consider and determine

    Currently, Section 112 establishes time limits for state regulatory authorities and nonregulated electric utilities to begin and finish considering each federal ratemaking standard, mandates consideration during the first subsequent rate proceeding if deadlines are missed, and exempts states that took prior action before specified dates. The bill would require state authorities and nonregulated utilities to start considering the new data center standard within one year after enactment and complete their determination within two years. If an entity fails to meet these deadlines, it would be required to address the standard during its first rate proceeding started more than three years after enactment. The bill would also exempt states and utilities from these deadlines if, prior to enactment, the state already implemented the data center standard (or a comparable standard), conducted a proceeding to consider it, or had its legislature vote on it.

    The bill's instruction

    Section 112(b) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2622(b)) is amended— (A) in paragraph (8), by indenting subparagraph (B) appropriately; and (B) by adding at the end the following: “ (9) (A) Not later than 1 year after the date of enactment of this paragraph, each State regulatory authority (with respect to each electric utility for which the State has ratemaking authority) and each nonregulated electric utility shall commence consideration under section 111, or set a hearing date for consideration, with respect to the standard established by paragraph (22) of section 111(d). (B) Not later than 2 years after the date of enactment of this paragraph, each State regulatory authority (with respect to each electric utility for which the State has ratemaking authority), and each nonregulated electric utility shall complete the consideration and make the determination under section 111 with respect to the standard established by paragraph (22) of section 111(d). .” Section 112(c) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2622(c)) is amended by adding at the end the following: “In the case of the standard established by paragraph (22) of section 111(d), the reference contained in this subsection to the date of enactment of this Act shall be deemed to be a reference to the date of enactment of that paragraph (22).”. Section 112 of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2622) is amended— (i) in subsection (h), in the subsection heading, by striking “Other”; and (ii) by adding at the end the following: “ (i) Prior State actions Subsections (b) and (c) shall not apply to the standard established by paragraph (22) of section 111(d) in the case of any electric utility in a State if, before the date of enactment of this subsection— (1) the State has implemented the standard (or a comparable standard) for the electric utility; (2) the State regulatory authority for the State or the relevant nonregulated electric utility has conducted a proceeding to consider implementation of the standard (or a comparable standard) for the electric utility; or (3) the State legislature has voted on the implementation of the standard (or a comparable standard) for the electric utility. .”

    Also changed by H.R. 10851, H.R. 10738, H.R. 10322, S. 5159, S. 5028

  • Amends

    16 U.S.C. 2634

    Prior and pending proceedings

    Currently, Section 124 allows state and utility proceedings and actions initiated prior to the enactment of the Public Utility Regulatory Policies Act of 1978—or prior to specific amendment dates for subsequently added standards—to satisfy statutory requirements if they substantially conformed to those standards. The bill would amend this section so that, for the newly added data center standard, the applicable baseline date refers to the date of enactment of the new data center paragraph.

    The bill's instruction

    Section 124 of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2634) is amended by adding at the end the following: “In the case of the standard established by paragraph (22) of section 111(d), the reference contained in this section to the date of enactment of this Act shall be deemed to be a reference to the date of enactment of that paragraph (22).”.

    Also changed by H.R. 10851, H.R. 10738, S. 5159, S. 5028, H.R. 9655

Explained by gemini-3.8-flash on November 17, 2026.

Bills Congress.gov lists as related, and bills that share legislative subjects with this one.