GRID Savings Act of 2026
Introduced
In committee
Current stepReported
Not yetPassed Senate
Not yetPassed House
Not yetResolving differences
Not yetSent to the president
Not yetSigned
Not yetBecame law
Not yet
AI-generated from the official bill text and not reviewed by a person. It may contain errors. How summaries are made
The GRID Savings Act of 2026 would amend the Federal Power Act to establish Federal Energy Regulatory Commission jurisdiction and standardized rules for connecting large nonresidential electricity loads of at least 150 megawatts to the interstate transmission grid.
Who it affects
This bill directly affects the Federal Energy Regulatory Commission, transmitting electric utilities operating in interstate commerce, state utility commissions, and commercial or industrial entities that own, control, or develop large electric loads of 150 megawatts or more (such as data centers or large industrial manufacturing facilities).
Based on the Introduced in Senate text · gemini-3.8-flash
Generated October 3, 2026 · Read the official text on Congress.gov
Your Vote
1 key actions of 2: Congress.gov's major actions and roll-call votes.
Introduced in Senate
Recorded by: Library of Congress
Sections of law the bill's Introduced in Senate text would amend, repeal or add to, found in the bill's own text. US Code current through Public Law 119-142.
Explanations are AI-generated from the bill text and the current US Code and not reviewed by a person. They may contain errors; the bill's instruction and the current text are shown so you can check them. How explanations are made
- Amends
16 U.S.C. 824
Declaration of policy; application of subchapter
Current law under Part II of the Federal Power Act declares federal policy and establishes the jurisdiction of the Federal Energy Regulatory Commission (FERC) over the transmission and wholesale sale of electric energy in interstate commerce, while generally reserving regulation of generation, local distribution, and retail sales to the states. The bill would amend Part II by adding a new Section 224 governing "Large load interconnection." The provided excerpt of this new section adds definitions for key regulatory terms, including defining a "covered large load" as a new or expanded nonresidential electric load (or affiliated group of loads) with a requested or projected peak electric demand of at least 150 megawatts behind a single point of interconnection, regardless of whether it includes generation or storage resources. It also defines terms including "bulk-power system," "covered large-load customer," "dedicated resource," "Direct Assignment Facility," "Interconnection Facility," and "Network Upgrade." Because the bill text provided in the instructions is truncated, it does not show the full substantive requirements or regulatory mechanisms of the newly added section beyond these initial definitions.
The bill's instruction
Part II of the Federal Power Act (16 U.S.C. 824 et seq.) is amended by adding at the end the following: “ 224. Large load interconnection (a) Definitions In this section: (1) Bulk-power system The term bulk-power system has the meaning given the term in section 215(a). (2) Commission The term Commission means the Federal Energy Regulatory Commission. (3) Covered large load (A) In general The term covered large load means a new or expanded nonresidential electric load, or a group of such loads under common ownership, control, or affiliation at a single site or at contiguous or adjacent sites sharing electric infrastructure (including phased development), that has an aggregate requested or projected peak electric demand of not less than 150 megawatts behind a single point of interconnection. (B) Combined configurations A load or group of loads described in subparagraph (A) shall be a covered large load without regard to whether it is proposed to be interconnected, studied, or served in combination with 1 or more generation or energy storage resources, and peak electric demand shall be measured without reduction for any such resource. (4) Covered large-load customer The term covered large-load customer means a person that owns, controls, or operates a covered large load. (5) Dedicated resource The term dedicated resource means a new or incremental generation resource, energy storage resource, or enforceable flexibility arrangement, including a resource located behind the meter of, co-located with, or proximate to and electrically deliverable to the applicable covered large load, that is dedicated to the covered large load and subject to 1 or more enforceable, metered commitments. (6) Direct Assignment Facility The term Direct Assignment Facility means a facility, or any portion of a facility, that is— (A) constructed for the sole use or benefit of a particular covered large-load customer; (B) classified as a Direct Assignment Facility under the applicable tariff or service agreement accepted or approved by the Commission, consistent with the definition of the term Direct Assignment Facilities in the pro forma open access transmission tariff established by the Commission under section 35.28 of title 18, Code of Federal Regulations (or a successor regulation), as adapted by the Commission for covered large loads; and (C) specified as a Direct Assignment Facility in the applicable tariff or service agreement accepted or approved by the Commission. (7) Interconnection Facility The term Interconnection Facility means a facility classified as an Interconnection Facility under the applicable tariff or service agreement accepted or approved by the Commission, consistent with the definition of the term Interconnection Facilities in the standard interconnection procedures and agreements established by the Commission under section 35.28 of title 18, Code of Federal Regulations (or a successor regulation), as adapted by the Commission for covered large loads. (8) Network upgrade The term Network Upgrade means an addition, modification, or upgrade to the transmission system of a transmitting utility, at or beyond the point at which the Interconnection Facilities for a covered large load connect to that system, that is required to accommodate the interconnection of, or transmission service to serve, the covered large load, consistent with the definition of the term Network Upgrades in the standard interconnection procedures and agreements established by the Commission under section 35.28 of title 18, Code of Federal Regulations (or a successor regulation), as adapted by the Commission for covered large loads. (9) Stand Alone Network Upgrade The term Stand Alone Network Upgrade means a Network Upgrade classified as a Stand Alone Network Upgrade under the applicable tariff or service agreement accepted or approved by the Commission, consistent with the definition of the term Stand Alone Network Upgrades in the standard interconnection procedures and agreements established by the Commission under section 35.28 of title 18, Code of Feder
Also changed by H.R. 10987, H.R. 10988, H.R. 10809, S. 5653, H.R. 10539
Explained by gemini-3.8-flash on October 30, 2026, against the US Code through Public Law 119-134.