Skip to main content
S. 4806In committeeEnergy

POWER Up Act

Introduced June 17, 2026Origin: Senate

  1. Introduced

  2. In committee

    Current step
  3. Reported

    Not yet
  4. Passed Senate

    Not yet
  5. Passed House

    Not yet
  6. Resolving differences

    Not yet
  7. Sent to the president

    Not yet
  8. Signed

    Not yet
  9. Became law

    Not yet

AI-generated from the official bill text and not reviewed by a person. It may contain errors. How summaries are made

The POWER Up Act would give the Federal Energy Regulatory Commission jurisdiction over connecting large electricity-demand facilities directly to the interstate electric transmission grid.

Who it affects

The bill directly applies to the Federal Energy Regulatory Commission (FERC), transmission grid operators, owners and developers of facilities with peak electricity demand of 100 megawatts or more (such as large industrial sites or data centers), and hybrid load-and-generation facilities seeking interconnection to the interstate transmission system.

Based on the Introduced in Senate text · gemini-3.8-flash

Generated October 4, 2026 · Read the official text on Congress.gov

Your Vote

1 key actions of 2: Congress.gov's major actions and roll-call votes.

  1. Introduced in Senate

    Recorded by: Library of Congress

Sections of law the bill's Introduced in Senate text would amend, repeal or add to, found in the bill's own text. US Code current through Public Law 119-142.

Explanations are AI-generated from the bill text and the current US Code and not reviewed by a person. They may contain errors; the bill's instruction and the current text are shown so you can check them. How explanations are made

  • Amends

    16 U.S.C. 824

    Declaration of policy; application of subchapter

    Currently, Section 201 of the Federal Power Act outlines the jurisdiction of the Federal Energy Regulatory Commission (FERC) over the transmission and wholesale sale of electric energy in interstate commerce, while generally leaving retail service, local distribution, and facility generation to state regulation. It does not provide explicit FERC jurisdiction over connecting large electricity consumers directly to the interstate transmission system. The bill would add subsection (h) to give FERC jurisdiction over the interconnection of any "large load facility" to interstate electric transmission facilities. A large load facility is defined as a facility, or group of commonly owned or controlled facilities at a single or contiguous site, with a projected aggregate peak electricity demand of 100 megawatts or greater, though FERC could adjust this threshold by rule. These interconnections would be treated as components of open access transmission service. The bill would also require FERC to issue a final rule within 18 months establishing standardized interconnection procedures and agreements—including procedures for hybrid facilities combining large load and generation—as well as a test to assist in connecting these facilities to transmission lines. Finally, the amendment preserves state and local authority over facility siting, permitting, and construction, as well as over retail electric rates, retail service, local distribution facilities, and electricity generation.

    The bill's instruction

    Section 201 of the Federal Power Act (16 U.S.C. 824) is amended by adding at the end the following: “ (h) Jurisdiction over large load interconnection (1) Definitions In this subsection: (A) Commission The term Commission means the Federal Energy Regulatory Commission. (B) Large load facility (i) In general The term large load facility means any facility, or group of facilities described in clause (ii), the projected aggregate peak electricity demand of which is 100 megawatts or greater, subject to clause (iii). (ii) Group of facilities described A group of facilities referred to in clause (i) is a group of facilities— (I) under common ownership or control; and (II) located at— (aa) a single site; or (bb) contiguous sites. (iii) Adjustment The Commission may, by rule, adjust the projected aggregate peak electricity demand at which a facility, or a group of facilities described in clause (ii), will be considered to be a large load facility, as the Commission determines to be necessary to ensure— (I) the reliability of the bulk-power system (as defined in section 215(a)); and (II) the provision of just, reasonable, and not unduly discriminatory or preferential transmission service. (2) Jurisdiction over interconnection (A) In general The Commission shall have jurisdiction over the interconnection of any large load facility to 1 or more facilities used for the transmission of electric energy in interstate commerce. (B) Treatment The interconnection of a large load facility as described in subparagraph (A) shall be— (i) subject to the requirements of this section, section 205, and section 206; and (ii) considered to be a component of open access transmission service. (3) Rulemaking Not later than 18 months after the date of enactment of this subsection, the Commission shall issue a final rule establishing— (A) standardized procedures and agreements for the interconnection of large load facilities, including procedures for hybrid facilities that combine large load and generation at a single point of interconnection; and (B) a test for transmission facilities to aid in the interconnection of large load facilities and transmission facilities, including transmission lines. (4) Preservation of State authority Nothing in this subsection affects the authority of any State or local government over— (A) the siting, permitting, or construction of any facility; (B) retail electric service or rates; (C) facilities used in the local distribution of electric energy; or (D) the generation of electric energy. .”

    Also changed by H.R. 10987, H.R. 10988, H.R. 10809, S. 5653, H.R. 10539

Explained by gemini-3.8-flash on November 5, 2026, against the US Code through Public Law 119-136.