H.R. 3157ReportedEnergy

State Energy Accountability Act

Introduced May 1, 2025Origin: House

  1. Introduced

  2. In committee

  3. Reported

    Current step
  4. Passed House

    Not yet
  5. Passed Senate

    Not yet
  6. Resolving differences

    Not yet
  7. Sent to the president

    Not yet
  8. Signed

    Not yet
  9. Became law

    Not yet

AI-generated from the official bill text, with the Congressional Research Service summary as context, and not reviewed by a person. It may contain errors. How summaries are made

The State Energy Accountability Act would require state utility regulators enforcing intermittent energy mandates to evaluate and publish reports on their effects on electric grid reliability, resource adequacy, and utility rates.

Who it affects

This bill directly affects state public utility commissions and other state regulatory authorities that oversee electric utilities. It also affects state-regulated electric utilities subject to state renewable or intermittent energy mandates, as well as electric generation facilities providing power to the bulk-power system.

Based on the Reported in House text · gemini-3.8-flash

Generated October 7, 2026 · Read the official text on Congress.gov

Official summary from the Congressional Research Service

Summary of the bill as Reported to House · September 17, 2025

State Energy Accountability Act This bill directs each state that implements certain energy policies (e.g., policies that require solar or wind energy) to conduct, and make publicly available, a general evaluation of the effects that those policies have on the rates and reliability of the state's electric power grid, including information about meeting electricity demand during emergencies, periods of high demand, or extreme weather events.

Read this summary on Congress.gov

Your Vote

2 key actions of 9: Congress.gov's major actions and roll-call votes.

  1. Reported by the Committee on Energy and Commerce. H. Rept. 119-301.

    Recorded by: House floor actions · Library of Congress

  2. Introduced in House

    Recorded by: Library of Congress

Sections of law the bill's Reported in House text would amend, repeal or add to, found in the bill's own text. US Code current through Public Law 119-138.

  • Amends

    16 U.S.C. 2621

    Consideration and determination respecting certain ratemaking standards

    Subsections (d)

    No AI explanation of this change yet.

    The bill's instruction

    Section 111(d) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2621(d)) is amended by adding at the end the following: “ (22) Evaluation of effects of State policies on reliable availability of electric energy (A) In general Each State regulatory authority that implements an intermittent energy policy shall conduct, and make publicly available, a general evaluation of— (i) the effects of implementing the intermittent energy policy on the reliability of the bulk-power system in the State, including an assessment of the adequacy of available electric energy resources over a 10-year period; (ii) the ability of electric energy resources that comply with the requirements of the intermittent energy policy to meet electric energy demand during emergencies, periods of high demand, or extreme weather events; (iii) the effects of implementing the intermittent energy policy on rates charged by electric utilities; (iv) whether reliable generation facilities that are removed from service in order to comply with the requirements of the intermittent energy policy can be replaced with sufficient electric generation facilities meeting such requirements, which have a capacity accreditation that is equivalent to the capacity accreditation of the removed facilities, to maintain the reliability of the bulk-power system in the State; and (v) the extent to which implementation of the intermittent energy policy requires electric utilities in the State to use replacement electric energy supplies that are generated by reliable generation facilities located outside the State in order to maintain the reliability of the bulk-power system in the State. (B) Prior State actions Notwithstanding section 124 and paragraphs (1) and (2) of section 112(a), each State regulatory authority shall consider and make a determination concerning the standard set out in subparagraph (A) in accordance with the requirements of subsections (a) and (b) of this section, without regard to any proceedings commenced prior to the enactment of this paragraph. (C) Time limitation Notwithstanding subsections (b) and (c) of section 112, each State regulatory authority shall consider and make a determination concerning whether it is appropriate to implement the standard set out in subparagraph (A) not later than 1 year after the date of enactment of this paragraph. (D) Public availability A State regulatory authority that has made a determination concerning whether to implement, and is implementing, the standard set out in subparagraph (A) shall make publicly available the general evaluation described in such subparagraph— (i) if the applicable State has adopted an intermittent energy policy before the date on which the State regulatory authority makes such determination, not later than 1 year after such date of determination; and (ii) if the applicable State adopts an intermittent energy policy after the date on which the State regulatory authority makes such determination, not later than 1 year after the date of such adoption. (E) Definitions In this paragraph: (i) Bulk-power system The term bulk-power system has the meaning given that term in section 215 of the Federal Power Act (16 U.S.C. 824o). (ii) Intermittent energy policy The term intermittent energy policy means any requirement of a State, enforced by a State regulatory authority, that a State regulated electric utility ensure that a specified portion of the electric energy sold by such electric utility is generated by facilities that are not reliable generation facilities. (iii) Reliable generation facility The term reliable generation facility means an electric generation facility that ensures the reliable availability of electric energy by— (I) having operational characteristics to enable the generation of electric energy on a continuous basis for a period of not fewer than 30 days; (II) having— (aa) adequate fuel, or a continuously available energy source, on-site to enable the generation of electric energy on a continuous basis for a period of not fewer than 30 days; or (bb) contractual ob

    Also changed by H.R. 10851, H.R. 10738, H.R. 10322, S. 5159, S. 5028