The New Source Review Permitting Improvement Act would amend the Clean Air Act to narrow when physical or operational changes at stationary sources trigger modification and preconstruction permit requirements.
Who it affects
This bill directly affects operators and owners of stationary sources and major emitting facilities subject to Clean Air Act regulations, as well as the Environmental Protection Agency and state or local air permitting authorities responsible for implementing New Source Review and preconstruction permitting programs.
Based on the Introduced in Senate text · gemini-3.8-flash
Generated October 3, 2026 · Read the official text on Congress.gov
Your Vote
1 key actions of 2: Congress.gov's major actions and roll-call votes.
Introduced in Senate
Recorded by: Library of Congress
Sections of law the bill's Introduced in Senate text would amend, repeal or add to, found in the bill's own text. US Code current through Public Law 119-142.
Explanations are AI-generated from the bill text and the current US Code and not reviewed by a person. They may contain errors; the bill's instruction and the current text are shown so you can check them. How explanations are made
- Amends
42 U.S.C. 7475
Preconstruction requirements
Current law sets forth preconstruction permit and review requirements that must be met before construction begins on a major emitting facility in clean air areas. The bill would add a new subsection stating that these preconstruction requirements apply only to the physical construction of discrete parts of an emissions unit at a major emitting facility. They would not apply to other on-site physical activities—even if those activities are costly, significantly alter the site, are permanent, or are designed to accommodate an installation to an emissions unit. It would also define "emissions unit" as any part of a stationary source that emits, or has the potential to emit, a regulated air pollutant.
The bill's instruction
Section 165 of the Clean Air Act (42 U.S.C. 7475) is amended by adding at the end the following: “ (f) Applicability to construction (1) In general The requirements of subsection (a) that apply with respect to authorizing construction of a major emitting facility shall apply only with respect to construction that involves physical construction of the discrete parts of an emissions unit at a major emitting facility, regardless of whether the construction involves other physical on-site activities at the major emitting facility, including any such other physical on-site activity that— (A) may be costly; (B) may significantly alter the site; (C) is permanent in nature; or (D) is to accommodate an installation to an emissions unit. (2) Definition of emissions unit In this subsection, the term “emissions unit” means any part of a stationary source that emits, or has the potential to emit, any air pollutant that is regulated under this title. .”
Also changed by H.R. 161
- Amends
42 U.S.C. 7479
Definitions
Subsections (2)
Current law specifies that the term "construction," when used in connection with any source or facility under the prevention of significant deterioration program, includes modifications as defined under section 111(a) of the Clean Air Act. The bill would replace that provision with a new definition specifying that "construction" at a major emitting facility includes a modification under section 111(a), but explicitly excludes any change that does not result in a significant emissions increase, or a significant net emissions increase, in annual actual emissions at the facility.
The bill's instruction
Section 169(2) of the Clean Air Act (42 U.S.C. 7479(2)) is amended by striking subparagraph (C) and inserting the following: “ (C) The term construction, when used in connection with a major emitting facility, includes a modification (as defined in section 111(a)) at such facility, except that for purposes of this subparagraph a modification does not include a change at a major emitting facility that does not result in a significant emissions increase, or a significant net emissions increase, in annual actual emissions at such facility. .”
Also changed by H.R. 161
- Amends
42 U.S.C. 7411
Standards of performance for new stationary sources
Subsections (a)
Current law defines a "modification" as any physical change in, or change in the method of operation of, a stationary source that increases the amount of any air pollutant emitted or results in emitting an air pollutant not previously emitted. The bill would narrow this definition by specifying that a change increases emissions only if the source's post-change maximum achievable hourly emission rate is higher than its maximum achievable hourly rate during any hour in the prior 10 years. In addition, the bill would exclude changes designed to reduce emissions per unit of production, or to restore, maintain, or improve operational reliability or safety, unless the change meets the hourly rate test and the Administrator of the Environmental Protection Agency determines the increase would cause an adverse effect on human health or the environment.
The bill's instruction
Paragraph (4) of section 111(a) of the Clean Air Act (42 U.S.C. 7411(a)) is amended— (1) by inserting “(A)” before “The term”; (2) by adding at the end the following: “For purposes of the preceding sentence, a change increases the amount of any air pollutant emitted by such source only if the maximum hourly emission rate of an air pollutant that is achievable by such source after the change is higher than the maximum hourly emission rate of such air pollutant that was achievable by such source during any hour in the 10-year period immediately preceding the change.”; and (3) by adding at the end the following: “ (B) Notwithstanding subparagraph (A), the term modification does not include a change at a stationary source that is designed— (i) to reduce the amount of any air pollutant emitted by the source per unit of production; or (ii) to restore, maintain, or improve the reliability of operations at, or the safety of, the source, except, with respect to either clause (i) or (ii), when the change would be a modification as defined in subparagraph (A) and the Administrator determines that the increase in the maximum achievable hourly emission rate of a pollutant from such change would cause an adverse effect on human health or the environment. .”
Also changed by H.R. 10918, H.R. 8990, S. 4619, H.R. 161
- Amends
42 U.S.C. 7501
Definitions
Current law defines the terms "modifications" and "modified" for nonattainment areas by referencing the general Clean Air Act modification definition in section 111(a)(4). The bill would replace this definition to state that "modifications" and "modified" mean a modification under section 111(a), but exclude changes at a major emitting facility that do not result in a significant emissions increase, or a significant net emissions increase, in annual actual emissions at the facility.
The bill's instruction
Section 171 of the Clean Air Act (42 U.S.C. 7501) is amended by striking paragraph (4) and inserting the following: “ (4) The terms modifications and modified mean a modification as defined in section 111(a), except that such terms do not include a change at a major emitting facility that does not result in a significant emissions increase, or a significant net emissions increase, in annual actual emissions at such facility. .”
Also changed by H.R. 161
- Amends
42 U.S.C. 7502
Nonattainment plan provisions in general
Subsections (c)(5)
Current law requires state implementation plans for nonattainment areas to include provisions requiring permits for the construction and operation of new or modified major stationary sources. The bill would specify that the permit requirement under this provision applies only to construction that involves the physical construction of the discrete parts of an emissions unit at a major stationary source. It would not apply to other physical on-site activities, regardless of whether those activities are costly, significantly alter the site, are permanent, or accommodate an installation to an emissions unit.
The bill's instruction
Section 172(c)(5) of the Clean Air Act (42 U.S.C. 7502(c)(5)) is amended by adding at the end the following: “ The construction for which a permit is required under this paragraph is construction that involves physical construction of the discrete parts of an emissions unit (as defined in section 165(f)(2)) at a major stationary source, regardless of whether the construction involves other physical on-site activities at the major stationary source, including any such other physical on-site activity that— (A) may be costly; (B) may significantly alter the site; (C) is permanent in nature; or (D) is to accommodate an installation to an emissions unit. .”
Explained by gemini-3.8-flash on October 28, 2026, against the US Code through Public Law 119-134.