Preventing Power Outages Act
Introduced
In committee
Current stepReported
Not yetPassed Senate
Not yetPassed House
Not yetResolving differences
Not yetSent to the president
Not yetSigned
Not yetBecame law
Not yet
AI-generated from the official bill text and not reviewed by a person. It may contain errors. How summaries are made
The Preventing Power Outages Act would extend grid resilience grant programs through 2031 and require grant administrators to give special consideration to utilities, states, and tribes with poorer power reliability track records.
Who it affects
This bill directly affects the Department of Energy, states, Indian Tribes, and eligible entities seeking grid resilience grants, such as electric grid operators, electricity distributors, transmission owners, and power generators.
Based on the Introduced in Senate text · gemini-3.8-flash
Generated October 7, 2026 · Read the official text on Congress.gov
Your Vote
1 key actions of 2: Congress.gov's major actions and roll-call votes.
Introduced in Senate
Recorded by: Library of Congress
Sections of law the bill's Introduced in Senate text would amend, repeal or add to, found in the bill's own text. US Code current through Public Law 119-142.
- Amends
42 U.S.C. 18711
Preventing outages and enhancing the resilience of the electric grid
No AI explanation of this change yet.
The bill's instruction
Section 40101 of the Infrastructure Investment and Jobs Act (42 U.S.C. 18711) is amended— (1) in subsection (a)— (A) by redesignating paragraphs (1) through (5) as paragraphs (2) through (6), respectively; and (B) by inserting before paragraph (2) (as so redesignated) the following: “ (1) CAIDI; SAIDI; SAIFI The terms Customer Average Interruption Duration Index (or CAIDI), System Average Interruption Duration Index (or SAIDI), and System Average Interruption Frequency Index (or SAIFI) have the same meanings as in the standard published by the Institute of Electrical and Electronics Engineers Standards Association entitled “IEEE Guide for Electric Power Distribution Reliability Indices” and numbered 1366 (or a successor standard), subject to the condition that, in calculating each index, all outages greater than 5 minutes, including on Major Event Days (within the meaning of that standard (or a successor standard)), are included in the calculation. ;” (2) in subsection (c)(4)— (A) by striking the paragraph designation and heading and all that follows through “In” and inserting the following: “ (4) Priority; special consideration (A) Priority In ; and” (B) by adding at the end the following: “ (B) Special consideration In making grants to eligible entities under the program, the Secretary shall take into consideration the scores of the eligible entities on the System Average Interruption Duration Index, the System Average Interruption Frequency Index, and the Customer Average Interruption Duration Index during the previous 5 years, with eligible entities having lower reliability, as indicated by higher SAIDI, SAIFI, or CAIDI scores during that period, receiving additional weight or consideration as compared to eligible entities having higher reliability, as indicated by lower SAIDI, SAIFI, or CAIDI scores during that period. ;” (3) in subsection (d)— (A) in paragraph (3)(B), by adding at the end the following: “ (vi) The scores of the State or Indian Tribe on the System Average Interruption Duration Index, the System Average Interruption Frequency Index, and the Customer Average Interruption Duration Index during the previous 5 years, with States or Indian Tribes having lower reliability, as indicated by higher SAIDI, SAIFI, or CAIDI scores during that period, receiving additional weight or consideration as compared to States or Indian Tribes having higher reliability, as indicated by lower SAIDI, SAIFI, or CAIDI scores during that period. ; and” (B) in paragraph (5)— (i) by striking the paragraph designation and heading and all that follows through “In” and inserting the following: “ (5) Priority; special consideration (A) Priority In ; and” (ii) by adding at the end the following: “ (B) Special consideration In making grants to eligible entities using funds made available to the applicable State or Indian Tribe under the program, the State or Indian Tribe shall take into consideration the scores of the eligible entities on the System Average Interruption Duration Index, the System Average Interruption Frequency Index, and the Customer Average Interruption Duration Index during the previous 5 years, with eligible entities having lower reliability, as indicated by higher SAIDI, SAIFI, or CAIDI scores during that period, receiving additional weight or consideration as compared to eligible entities having higher reliability, as indicated by lower SAIDI, SAIFI, or CAIDI scores during that period. ;” (4) in subsection (e)— (A) in paragraph (2), by striking subparagraph (C); and (B) by adding at the end the following: “ (3) Clarification In making grants to eligible entities under this section, the Secretary, a State, or an Indian Tribe may not— (A) condition the submission of an application for, or receipt of, such a grant on the application addressing more than 1 type or category of activities, technologies, equipment, or hardening measures described in paragraph (1); or (B) give priority or any other preference to an application solely because the application addresses mor