Skip to main content
S. 1564Passed SenateFinance and Financial Sector

Floodplain Enhancement and Recovery Act

DemocratPatty Murray
Introduced May 1, 2025Origin: Senate

  1. Introduced

  2. In committee

  3. Reported

    Skipped

  4. Passed Senate

    Current step
  5. Passed House

    Not yet
  6. Resolving differences

    Not yet
  7. Sent to the president

    Not yet
  8. Signed

    Not yet
  9. Became law

    Not yet

AI-generated from the official bill text, with the Congressional Research Service summary as context, and not reviewed by a person. It may contain errors. How summaries are made

The Floodplain Enhancement and Recovery Act would exempt ecosystem restoration projects from certain map revision fees and allow communities to permit qualifying projects in regulatory floodways even if they raise base flood elevations.

Who it affects

This bill directly affects local communities managing floodways under the National Flood Insurance Program, entities proposing or requesting map revisions for aquatic and floodplain ecosystem restoration projects, professional engineers evaluating floodway impacts, and the Federal Emergency Management Agency (FEMA) along with consulting federal and state natural resource agencies.

Based on the Engrossed in Senate text · gemini-3.8-flash

Generated October 15, 2026 · Read the official text on Congress.gov

Official summary from the Congressional Research Service

Summary of the bill as Passed Senate · September 30, 2026

Floodplain Enhancement and Recovery Act This bill eases restrictions for ecosystem restoration projects in designated floodways that meet certain risk criteria. Under current National Flood Insurance Program requirements, such projects are generally prohibited in a designated floodway if the project would increase the area’s base flood elevation.

Read this summary on Congress.gov

Your Vote

3 key actions of 8: Congress.gov's major actions and roll-call votes.

  1. Passed/agreed to in Senate: Passed Senate without amendment by Unanimous Consent.

    Recorded by: Library of Congress

  2. Senate Committee on Banking, Housing, and Urban Affairs discharged by Unanimous Consent.

    Recorded by: Senate · Library of Congress

  3. Introduced in Senate

    Recorded by: Library of Congress

Sections of law the bill's Engrossed in Senate text would amend, repeal or add to, found in the bill's own text. US Code current through Public Law 119-142.

Explanations are AI-generated from the bill text and the current US Code and not reviewed by a person. They may contain errors; the bill's instruction and the current text are shown so you can check them. How explanations are made

  • Amends

    42 U.S.C. 4101e

    Exemption from fees for certain map change requests

    Current law exempts requesters from review or processing fees for flood insurance rate map change requests based on habitat restoration projects that are funded in whole or in part by federal or state funds, including dam removal, culvert redesign or installation, or fish passage installation. The bill would replace the existing provision with broader rules governing ecosystem restoration projects. It would define an "ecosystem restoration project" as one primarily aimed at manipulating site characteristics to recover, enhance, accelerate, reclaim, or improve natural and beneficial functions of an aquatic resource or floodplain. The bill would exempt requests for map changes based on these projects from review or processing fees without requiring federal or state funding. The bill would also allow communities to permit an ecosystem restoration project in an adopted regulatory floodway even if it increases base flood elevations, provided that a professional engineer determines the project will not increase the base flood water surface elevation by more than one foot (or a greater amount set by the Administrator of the Federal Emergency Management Agency), no insurable structure or critical infrastructure is adversely impacted, and the community submits an analysis of the changed conditions within 180 days after completion. It specifies that existing procedures for notifying landowners about floodway development are not affected.

    The bill's instruction

    Section 22 of the Homeowner Flood Insurance Affordability Act of 2014 (42 U.S.C. 4101e) is amended to read as follows: “ 22. Ecosystem restoration projects (a) Definition In this section, the term ecosystem restoration project means a project proposed for the primary purpose of manipulating the physical, chemical, or biological characteristics of a site with the goal of— (1) recovering natural and beneficial functions to a former or degraded aquatic resource or floodplain; or (2) enhancing, accelerating, reclaiming, or improving a specific, natural, and beneficial function of an aquatic resource or floodplain. (b) Exemption from fees for flood hazard change requests for ecosystem restoration projects Notwithstanding any other provision of law, a requester shall be exempt from submitting a review or processing fee for a request for a flood insurance rate map change based on an ecosystem restoration project. (c) Exemption from conditional approval for certain ecosystem restoration projects A community may permit an ecosystem restoration project within an adopted regulatory floodway that would result in an increase in base flood elevations, if— (1) a professional engineer uses the best judgment of the engineer to determine that the cumulative effect of the proposed ecosystem restoration project, when combined with all other existing development, will not increase the water surface elevation of the base flood by more than 1 foot (or a greater amount or metric determined appropriate by the Administrator); (2) no insurable structure or any critical infrastructure is located in an area that would be adversely impacted by the increased base flood elevation; and (3) not later than 180 days after the date on which the ecosystem restoration project is completed, the community submits to the Administrator an analysis regarding the changed conditions caused by the ecosystem restoration project. (d) Rule of construction Nothing in this section may be construed to affect the procedure (as in effect on the day before the date of enactment of the Floodplain Enhancement and Recovery Act) for providing notification to a landowner with respect to development in a regulatory floodway. .”

    Also changed by H.R. 6256

Explained by gemini-3.8-flash on October 17, 2026, against the US Code through Public Law 119-121.