Skip to main content
S. 1067In committeeEnvironmental Protection

Concrete and Asphalt Innovation Act of 2025

Introduced March 13, 2025Origin: Senate

  1. Introduced

  2. In committee

    Current step
  3. Reported

    Not yet
  4. Passed Senate

    Not yet
  5. Passed House

    Not yet
  6. Resolving differences

    Not yet
  7. Sent to the president

    Not yet
  8. Signed

    Not yet
  9. Became law

    Not yet

AI-generated from the official bill text and not reviewed by a person. It may contain errors. How summaries are made

The Concrete and Asphalt Innovation Act of 2025 would establish federal research, demonstration, technical assistance, and procurement programs to develop and deploy low-emissions cement, concrete, and asphalt materials.

Who it affects

This bill directly affects the Department of Energy, the Department of Commerce (National Institute of Standards and Technology), the Federal Highway Administration, and state transportation agencies. It also directly applies to domestic producers of cement, concrete, asphalt binders, and asphalt mixtures, as well as construction contractors, research institutions, and local governments updating building specifications.

Based on the Introduced in Senate text · gemini-3.8-flash

Generated October 8, 2026 · Read the official text on Congress.gov

Your Vote

1 key actions of 2: Congress.gov's major actions and roll-call votes.

  1. Introduced in Senate

    Recorded by: Library of Congress

Sections of law the bill's Introduced in Senate text would amend, repeal or add to, found in the bill's own text. US Code current through Public Law 119-142.

  • Amends

    23 U.S.C. 133

    Surface transportation block grant program

    No AI explanation of this change yet.

    The bill's instruction

    Section 133 of title 23, United States Code, is amended— (1) in subsection (b), by adding at the end the following: “ (25) A project that includes the use of innovative, domestically produced cement, concrete, asphalt mixture, or asphalt binder manufactured using a process described in subsection (l)(1). (26) Subject to subsection (l)(2), a project that is carried out through an advance multiyear contract with a producer for a specified quantity and specified price of innovative, domestically produced cement, concrete, asphalt mixture, or asphalt binder manufactured using a process described in subsection (l)(1). ; and” (2) by adding at the end the following: “ (l) Requirements for certain projects (1) Manufacturing process described The process referred to in paragraphs (25) and (26) of subsection (b) is a manufacturing process that— (A) produces materials with— (i) superior durability to conventional materials; and (ii) superior performance with respect to— (I) compressive strength; (II) tensile strength; or (III) workability; or (B) produces materials that meet the engineering specifications of the State and achieves superior performance with respect to— (i) environmental performance; or (ii) energy efficiency. (2) Advance multiyear contracts In the case of an advance multiyear contract described in subsection (b)(26), the contract— (A) shall not include in the cancellation provisions consideration of recurring manufacturing costs of the producer associated with the production of unfunded units to be delivered under the contract; (B) shall provide that payments to the producer under the contract are not made in advance of incurred costs on funded units; (C) shall not include a price adjustment based on a failure to award a follow-on contract; (D) shall require that the producer submit to the applicable State a statement that describes the quantity and cost of the cement, concrete, asphalt mixture, and asphalt binder; (E) shall require that the producer shall demonstrate to the applicable State material progress toward commercial production and operational capacity of cement, concrete, asphalt mixture, or asphalt binder production with respect to logistics, planned material storage, handling capacities, and delivery mechanisms, and includes termination options in the event of failure to demonstrate such progress; and (F) shall fulfill the preference criteria set by the applicable State, to the maximum extent practicable. .” Section 133(h)(6) of title 23, United States Code, is amended by adding at the end the following: “ (D) Procurement for innovative building materials (i) In general In carrying out a project under this subsection, a State may use amounts set aside under this subsection to enter into an advance multiyear contract described in subsection (l)(2) for a specified quantity and specified price of innovative, domestically produced cement, concrete, asphalt mixture, or asphalt binder. (ii) Requirement A State may not provide payments to a producer under a contract described in clause (i) unless materials have been delivered according to contract terms and conditions. .”

    Also changed by S. 5407, H.R. 9041, H.R. 8870, H.R. 8719, H.R. 8717