Skip to main content
H.R. 9612Passed HouseEnergy

American Enrichment Deployment Act

RepublicanRussell Fry
Introduced July 9, 2026Origin: House

  1. Introduced

  2. In committee

  3. Reported

  4. Passed House

    Current step
  5. Passed Senate

    Not yet
  6. Resolving differences

    Not yet
  7. Sent to the president

    Not yet
  8. Signed

    Not yet
  9. Became law

    Not yet

AI-generated from the official bill text, with the Congressional Research Service summary as context, and not reviewed by a person. It may contain errors. How summaries are made

The American Enrichment Deployment Act would allow the construction of uranium enrichment facilities to begin before obtaining a license from the Nuclear Regulatory Commission, aligning them with rules for other fuel cycle facilities.

Who it affects

This bill directly affects the Nuclear Regulatory Commission, as well as companies and developers applying to construct and license uranium enrichment facilities.

Based on the Referred in Senate text · gemini-3.8-flash

Generated November 13, 2026 · Read the official text on Congress.gov

Official summary from the Congressional Research Service

Summary of the bill as Introduced in House · July 9, 2026

The bill has changed since this summary was written.

The following analysis is based on draft bill text that was made available by the House of Representatives and may differ from the bill text as introduced. American Enrichment Deployment Act This bill allows for the construction of a uranium enrichment facility before a license is issued by the Nuclear Regulatory Commission (NRC).

Read this summary on Congress.gov

Your Vote

4 key actions of 18: Congress.gov's major actions and roll-call votes.

  1. On motion to suspend the rules and pass the bill, as amended Agreed to by the Yeas and Nays: (2/3 required): 394 - 3 (Roll no. 316). (text: CR H6100-6101)

    Recorded by: House floor actions

    Roll call 316 (House)
  2. Passed/agreed to in House: On motion to suspend the rules and pass the bill, as amended Agreed to by the Yeas and Nays: (2/3 required): 394 - 3 (Roll no. 316). (text: CR H6100-6101)

    Recorded by: Library of Congress

    Roll call 316 (House)
  3. Reported (Amended) by the Committee on Energy and Commerce. H. Rept. 119-875.

    Recorded by: House floor actions · Library of Congress

  4. Introduced in House

    Recorded by: Library of Congress

Sections of law the bill's Referred in Senate text would amend, repeal or add to, found in the bill's own text. US Code current through Public Law 119-142.

Explanations are AI-generated from the bill text and the current US Code and not reviewed by a person. They may contain errors; the bill's instruction and the current text are shown so you can check them. How explanations are made

  • Amends

    42 U.S.C. 2243

    Licensing of uranium enrichment facilities

    Currently, federal law establishes specific requirements for licensing uranium enrichment facilities. It designates the issuance of a combined construction and operation license as a major federal action requiring an environmental impact statement under the National Environmental Policy Act of 1969, mandates that the Nuclear Regulatory Commission (NRC) hold a single adjudicatory hearing on the record before issuing the license, and requires pre-operation inspections published in the Federal Register. The bill would repeal these provisions and replace them with an "at-risk construction" rule. Under the new rule, construction of a uranium enrichment facility before obtaining an NRC license would be permitted under the same terms and conditions that apply to other fuel cycle facilities. It clarifies that this change does not alter the Commission's authority to grant or deny a license if an applicant fails to meet regulatory requirements. Finally, the bill would redesignate the existing subsections covering insurance and decommissioning, liability exemptions, and foreign ownership limits from subsections (d) through (f) to subsections (b) through (d).

    The bill's instruction

    Section 193 of the Atomic Energy Act of 1954 (42 U.S.C. 2243) is amended— (1) by striking subsections (a) through (c) and inserting the following: “ (a) At-risk construction (1) In general Construction of a uranium enrichment facility prior to the issuance of a license under sections 53 and 63 for that facility shall be permitted under the same terms and conditions applicable to other fuel cycle facilities licensed under such sections. (2) Rule of construction Paragraph (1) may not be construed to modify the licensing and regulatory authority of the Commission to issue a license under sections 53 and 63 for a uranium enrichment facility, including the authority to deny an application for such a license for the failure of an applicant to meet regulatory requirements. ; and” (2) by redesignating subsections (d) through (f) as subsections (b) through (d), respectively.

    Also changed by S. 5249, H.R. 9658, H.R. 5549, S. 1757, H.R. 2347

Explained by gemini-3.8-flash on November 14, 2026, against the US Code through Public Law 119-138.