Skip to main content
H.R. 9023In committeeEnvironmental Protection

CLEAN UP Mines Act of 2026

Introduced May 26, 2026Origin: House

  1. Introduced

  2. In committee

    Current step
  3. Reported

    Not yet
  4. Passed House

    Not yet
  5. Passed Senate

    Not yet
  6. Resolving differences

    Not yet
  7. Sent to the president

    Not yet
  8. Signed

    Not yet
  9. Became law

    Not yet

AI-generated from the official bill text and not reviewed by a person. It may contain errors. How summaries are made

The CLEAN UP Mines Act of 2026 would amend the Surface Mining Control and Reclamation Act of 1977 to set stricter reclamation deadlines, tighten rules for suspended mining operations, enhance water monitoring, and adjust performance bond releases.

Who it affects

Surface coal mine operators and permittees, who would face stricter reclamation deadlines, enhanced water monitoring requirements, altered bond release schedules, and limitations on operational pauses. It also directly affects federal and state regulatory authorities responsible for overseeing surface mining permits, conducting stream assessments, and performing site inspections.

Based on the Introduced in House text · gemini-3.8-flash

Generated October 4, 2026 · Read the official text on Congress.gov

Your Vote

1 key actions of 2: Congress.gov's major actions and roll-call votes.

  1. Introduced in House

    Recorded by: Library of Congress

Sections of law the bill's Introduced in House text would amend, repeal or add to, found in the bill's own text. US Code current through Public Law 119-142.

Explanations are AI-generated from the bill text and the current US Code and not reviewed by a person. They may contain errors; the bill's instruction and the current text are shown so you can check them. How explanations are made

  • Amends

    30 U.S.C. 1258

    Reclamation plan requirements

    Subsections (a)(7)

    Current law requires each surface coal mining reclamation plan to include a detailed estimated timetable for accomplishing each major step in the reclamation plan. The bill would amend this provision to require that the estimated timetable not exceed the performance standards established under section 515(b)(3) of the Surface Mining Control and Reclamation Act of 1977.

    The bill's instruction

    Section 508(a)(7) of the Surface Mining Control and Reclamation Act of 1977 (30 U.S.C. 1258(a)(7)) is amended by inserting “, not to exceed the standards established in section 515(b)(3)” after “reclamation plan”.
  • Amends

    30 U.S.C. 1261

    Revision of permits

    Subsections (a)

    Current law governs the revision of surface coal mining permits, requiring permittees to submit revised reclamation plans and establishing that revisions proposing significant alterations are subject to notice and hearing requirements. The bill would designate any request to temporarily cease or suspend mining operations as a significant permit revision. It would also specify that if no active coal removal or reclamation occurs at a permitted mine for more than six months during any three-year period, the permit will be considered out of compliance with the reclamation plan. That noncompliance status applies unless the permit complies with section 515(b)(3) standards without variances, and lasts until the regulatory authority approves either a reasonable plan to return to production within one year or an application for a permit revision.

    The bill's instruction

    Section 511(a) of the Surface Mining Control and Reclamation Act of 1977 (30 U.S.C. 1261(a)) is amended— (1) by redesignating paragraph (3) as paragraph (5); and (2) by inserting after paragraph (2) the following: “ (3) A request to temporarily cease or suspend mining operations is a significant permit revision for purposes of paragraph (2). (4) In each case where no active coal removal or reclamation has occurred at a permitted mine for more than 6 months during any 3-year period, the applicable permit shall be considered out of compliance with the reclamation plan— (A) unless the permit is in compliance with the standards established in section 515(b)(3) and does not have any variances from such standards; and (B) until the date on which the regulatory authority approves— (i) a reasonable plan submitted by the operator to return to production not later than 1 year after the date on which the operator is notified that the applicable permit is considered out of compliance under this paragraph; or (ii) an application for a revision of the permit submitted by the permittee under paragraph (1). .”

    Also changed by H.R. 7249

  • Amends

    30 U.S.C. 1265

    Environmental protection performance standards

    Current law requires coal mining operators to meet general environmental performance standards, including backfilling, compacting, and grading to restore the approximate original contour of the land, establishing diverse and permanent vegetative cover, and conducting reclamation as contemporaneously as practicable. The bill would require operators to complete backfilling, grading, and drainage control not later than 180 days after the date of last coal production and before removing necessary backfilling and grading equipment from the site, including for mountain-removal operations. It would tie contemporaneous reclamation requirements to specific statutory deadlines and require vegetative cover to be established within 36 months after the date of last coal production. Furthermore, it would prohibit operators from receiving more than one year beyond the specified timeframes to achieve successful revegetation.

    The bill's instruction

    Section 515 of the Surface Mining Control and Reclamation Act of 1977 (30 U.S.C. 1265) is amended— (1) in subsection (b)— (A) in paragraph (3)— (i) by inserting “and not later than 180 days after the date of the last coal production as reported pursuant to section 402(c)” after “except as provided in subsection (c)”; (ii) by inserting “ensure proper drainage control,” after “with respect to all surface coal mining operations”; and (iii) by inserting “and complete all final backfilling and grading before the equipment necessary for backfilling and grading is removed from the site” after “to retain moisture to assist revegetation or as otherwise authorized pursuant to this Act)”; (B) in paragraph (16), by inserting “, with such specific requirements for maximum time periods allowable for contemporaneous reclamation set forth in paragraphs (3), (19), and (20) of this subsection, paragraph (7) of subsection (c), and section 519(c)” after “contemporaneously as practicable with the surface coal mining operations”; (C) in paragraph (19), by inserting “not later than 36 months after the date of last coal production as reported pursuant to section 402(c)” before “establish on the regraded areas”; (D) in paragraph (20)— (i) in subparagraph (B), by striking the period at the end and inserting “; and”; and (ii) by adding at the end the following: “ (C) in no instance shall the operator be allowed more than 1 year greater than the time periods set forth in this subsection to achieve successful revegetation; ;” (E) in paragraph (22)(I), by striking the period at the end and inserting a semicolon; (F) in paragraph (23), by striking “and” at the end; and (G) in paragraph (24), by adding “and” at the end; and (2) in subsection (c), by adding at the end the following: “ (7) All backfilling and regrading to ensure proper drainage control, prevent leaching of toxic materials, eliminate highwalls, spoil piles, and depressions (unless small depressions are needed in order to retain moisture to assist revegetation or as otherwise authorized pursuant to this Act), and ensure stability, shall be completed not later than 180 days after the date of coal production as reported pursuant to section 402(c). .”

    Also changed by S. 4234

  • Amends

    30 U.S.C. 1267

    Inspections and monitoring

    Subsections (b)

    Current law requires regulatory authorities to mandate monitoring and specify monitoring sites for operations that disturb aquifers that significantly insure the hydrologic balance. The bill would replace that monitoring provision to require quarterly monitoring of both surface water and ground water during mining and reclamation. It also requires the regulatory authority to conduct an annual assessment of the biological condition of streams to demonstrate progress toward restoring pre-mining conditions, and to inspect surface water runoff control structures after any precipitation event at least as intense as a 100-year, 6-hour event.

    The bill's instruction

    Section 517(b) of the Surface Mining Control and Reclamation Act of 1977 (30 U.S.C. 1267(b)) is amended— (1) in paragraph (2), to read as follows: “ (2) the regulatory authority shall— (A) require quarterly monitoring of both surface water and ground water during mining and reclamation; (B) specify those— (i) monitoring sites to record the quantity and quality of surface drainage above and below the mine site as well as in the potential zone of influence; (ii) monitoring sites to record level, amount, and samples of ground water and aquifers potentially affected by the mining and also directly below the lowermost (deepest) coal seam to be mined; (iii) records of well logs and borehole data to be maintained; and (iv) monitoring sites to record precipitation; and (C) require the monitoring, data collection, and analysis required by this section to be conducted according to standards and procedures set forth by the regulatory authority in order to ensure their reliability and validity; ;” (2) by redesignating paragraph (3) as paragraph (5); and (3) by inserting after paragraph (2) the following: “ (3) the regulatory authority shall conduct an annual assessment of the biological condition of streams to demonstrate progress with respect to restoring of the pre-mining biological condition of the stream; (4) the regulatory authority shall conduct an inspection of surface water runoff control structures after each precipitation event that is at least as intense as a 100-year, 6-hour precipitation event; and .”

    Also changed by H.R. 7249

  • Amends

    30 U.S.C. 1269

    Release of performance bonds or deposits

    Subsections (c)

    Current law sets conditions and schedules for releasing performance bonds or deposits in three phases: up to 60 percent upon completing backfilling, regrading, and drainage control under the approved plan; an additional portion after establishing successful revegetation; and the remaining balance upon completing all mining and reclamation activities after the operator's liability period ends. The bill would reduce the initial bond release from 60 percent to 40 percent and condition it on compliance with the timing and backfilling standards under section 515(b)(3) or 515(c)(7). It would also condition the second phase of bond release on compliance with the revegetation timeline under section 515(b)(19), and condition the final bond release on compliance with the revegetation responsibility limits under section 515(b)(20).

    The bill's instruction

    Section 519(c) of the Surface Mining Control and Reclamation Act of 1977 (30 U.S.C. 1269(c)) is amended— (1) in paragraph (1)— (A) by inserting “and section 515(b)(3), or section 515(c)(7), as applicable,” after “with his approved reclamation plan”; and (B) by striking “60” and inserting “40”; (2) in paragraph (2), by inserting “and section 515(b)(19)” after “in accordance with the approved reclamation plan”; and (3) in paragraph (3), by inserting “in accordance with the approved reclamation plan and section 515(b)(20),” after “When the operator has completed successfully all surface coal mining and reclamation activities”.

Explained by gemini-3.8-flash on November 8, 2026, against the US Code through Public Law 119-138.