Skip to main content
H.R. 7487ReportedWater Resources Development

Rural Jobs and Hydropower Expansion Act

RepublicanLauren Boebert
Introduced February 11, 2026Origin: House

  1. Introduced

  2. In committee

  3. Reported

    Current step
  4. Passed House

    Not yet
  5. Passed Senate

    Not yet
  6. Resolving differences

    Not yet
  7. Sent to the president

    Not yet
  8. Signed

    Not yet
  9. Became law

    Not yet

AI-generated from the official bill text and not reviewed by a person. It may contain errors. How summaries are made

The Rural Jobs and Hydropower Expansion Act would expand Bureau of Reclamation lease of power privilege authorities to cover hydropower development across all Bureau facilities, replacing narrower provisions that applied only to small conduit and pumped storage hydropower.

Who it affects

This bill directly affects the Bureau of Reclamation, the Federal Energy Regulatory Commission, non-Federal entities operating and maintaining transferred Bureau facilities, and non-Federal entities or developers seeking leases of power privileges to build or operate hydropower projects at Bureau of Reclamation facilities.

Based on the Reported in House text · gemini-3.8-flash

Generated October 3, 2026 · Read the official text on Congress.gov

Your Vote

2 key actions of 6: Congress.gov's major actions and roll-call votes.

  1. Reported (Amended) by the Committee on Natural Resources. H. Rept. 119-775.

    Recorded by: House floor actions · Library of Congress

  2. Introduced in House

    Recorded by: Library of Congress

Sections of law the bill's Reported in House text would amend, repeal or add to, found in the bill's own text. US Code current through Public Law 119-142.

Explanations are AI-generated from the bill text and the current US Code and not reviewed by a person. They may contain errors; the bill's instruction and the current text are shown so you can check them. How explanations are made

  • Amends

    43 U.S.C. 485h

    New projects; sale of water and electric power; lease of power privileges

    Subsections (c)

    Current law limits the Secretary of the Interior's exclusive lease of power privilege authority to small conduit hydropower using Bureau of Reclamation facilities and pumped storage hydropower using Bureau reservoirs. It also establishes first-offer preferences for operating entities and applies National Environmental Policy Act of 1969 (NEPA) categorical exclusions specifically to small conduit projects. The bill would expand this authority to cover hydropower development using all Bureau of Reclamation facilities, broadening provisions across the subsection from "conduit" or "small conduit" projects to "transferred works" or "reserved works" facilities generally. It would state that water used for hydropower generation is "secondary to" (rather than "incidental to") original project purposes, and extend that rule to facilities specifically authorized for hydropower generation. The bill would also clarify that lease authorities are not expanded beyond project boundaries. Finally, the bill would update savings provisions regarding Federal Energy Regulatory Commission (FERC) authorizations. Any FERC authorization would remain active until it becomes inactive (or is renewed), after which exclusive project site jurisdiction shifts to the Bureau of Reclamation. The bill would also replace definitions of conduit terms with new definitions for "reserved works facility" and "transferred works facility."

    The bill's instruction

    Section 9(c) of the Reclamation Project Act of 1939 (43 U.S.C. 485h(c); 53 Stat. 1194) is amended— (1) by striking the subsection designation and inserting the following: “ (c) Furnishing water to municipalities; sale of electric power; lease of power privileges ;” (2) in paragraph (1), by striking “small conduit hydropower using Bureau of Reclamation facilities and pumped storage hydropower exclusively using Bureau of Reclamation reservoirs” and inserting “hydropower using all Bureau of Reclamation facilities”; (3) in paragraph (2)(A)— (A) by striking “applicable transferred conduit” and inserting “applicable transferred works facility”; (B) by striking “applicable reserved conduit” and inserting “applicable reserved works facility”; and (C) by striking “power privilege offer for a small conduit” and inserting “power privilege offer for the”; (4) in paragraph (3), by striking “small conduit” and inserting “applicable”; (5) in paragraph (4), by striking “small conduit hydropower”; (6) in paragraph (6)— (A) by inserting “, or the management of Bureau of Reclamation facilities specially authorized for hydropower generation” before “, as water used”; (B) by striking “conduit” before “hydropower generation”; (C) by striking “shall be deemed incidental to” inserting “shall be deemed secondary to”; and (D) by striking “transferred conduit” and inserting “transferred works facility”; (7) in paragraph (7), by striking “conduit”; (8) in paragraph (8)— (A) by inserting “(referred to in this section as an “authorization”)” before “issued by the Federal Energy Regulatory Commission”; (B) by striking “August 9, 2013,” and inserting “the date of the enactment of the Rural Jobs and Hydropower Expansion Act”; and (C) by adding at the end “Any authorization issued by the Federal Energy Regulatory Commission with respect to a project shall remain in place until such authorization becomes inactive. As allowed by the Federal Energy Regulatory Commission, an authorization may be renewed and remain active. Once the authorization becomes inactive, project site jurisdiction shall shift to the Bureau of Reclamation exclusively.”; (9) by redesignating paragraph (9) as paragraph (10); (10) by inserting after paragraph (8) the following: “ (9) Nothing in this section shall expand or otherwise amend the Bureau of Reclamation lease of power privilege authorities outside the project boundary. ; and” (11) in paragraph (10), as so redesignated— (A) by striking subparagraphs (A), (C), (D), and (E); (B) by redesignating subparagraph (B) as subparagraph (A); and (C) by adding at the end the following: “ (B) Reserved works facility The term reserved works facility means those facilities owned by the Bureau of Reclamation where the Bureau of Reclamation has retained responsibility for carrying out operation and maintenance activities. (C) Transferred works facility The term transferred works facility means a project facility where the operations and maintenance of that facility is carried out by a non-Federal entity under the provisions of a formal operations and maintenance transfer contract. .”

Explained by gemini-3.8-flash on November 10, 2026, against the US Code through Public Law 119-138.