H.R. 7257Passed HouseEnergy

SECURE Grid Act

RepublicanRobert E. Latta
Introduced January 27, 2026Origin: House

  1. Introduced

  2. In committee

  3. Reported

  4. Passed House

    Current step
  5. Passed Senate

    Not yet
  6. Resolving differences

    Not yet
  7. Sent to the president

    Not yet
  8. Signed

    Not yet
  9. Became law

    Not yet

AI-generated from the official bill text, with the Congressional Research Service summary as context, and not reviewed by a person. It may contain errors. How summaries are made

H.R. 7257 would update State energy security plan requirements to cover local distribution systems, weather threats, and supply chain risks, while extending the program through September 30, 2031.

Who it affects

State energy offices responsible for developing and submitting energy security plans, the Department of Energy, electric utilities, and suppliers of electricity generation, transmission, and distribution equipment.

Based on the Referred in Senate text · gemini-3.8-flash

Generated October 3, 2026 · Read the official text on Congress.gov

Official summary from the Congressional Research Service

Summary of the bill as Reported to House · May 11, 2026

The bill has changed since this summary was written.

Securing Community Upgrades for a Resilient Grid Act or the SECURE Grid Act This bill extends through FY2031 and modifies requirements for state energy security plans. Under current law, states are required to submit to the Department of Energy (DOE) state energy security plans that meet certain requirements in order to be eligible to receive federal financial assistance for state energy conservation programs. The bill specifies that DOE is not required to approve the plans.

Read this summary on Congress.gov

Your Vote

3 key actions of 15: Congress.gov's major actions and roll-call votes.

  1. Passed/agreed to in House: On motion to suspend the rules and pass the bill, as amended Agreed to by voice vote. (text: CR H4296)

    Recorded by: Library of Congress

  2. Reported (Amended) by the Committee on Energy and Commerce. H. Rept. 119-644.

    Recorded by: House floor actions · Library of Congress

  3. Introduced in House

    Recorded by: Library of Congress

Sections of law the bill's Referred in Senate text would amend, repeal or add to, found in the bill's own text. US Code current through Public Law 119-142.

Explanations are AI-generated from the bill text and the current US Code and not reviewed by a person. They may contain errors; the bill's instruction and the current text are shown so you can check them. How explanations are made

  • Amends

    42 U.S.C. 6326

    State energy security plans

    Current law authorizes federal financial assistance for State energy security plans that address physical and cybersecurity threats, coordinate with infrastructure owners and operators, and mitigate risk across energy sectors. The law is scheduled to expire on October 31, 2025. The bill would define "local distribution system" as energy infrastructure owned and operated by an electric utility at 100 kilovolts or less. It would require plans to be developed in consultation and coordination with equipment suppliers for electricity generation, transmission, and distribution. Plans would be required to explicitly address weather threats, physical attacks on local distribution and bulk-power systems, supply chain risks for electricity equipment, and cybersecurity threats to local distribution systems affecting the bulk-power system, along with risk mitigation methods for these hazards. The bill would also clarify that submitted state plans do not require approval by the Secretary of Energy, make federal technical assistance mandatory upon a governor's request rather than discretionary, extend information disclosure protections to local distribution systems, and extend the section's expiration date to September 30, 2031.

    The bill's instruction

    Section 366 of the Energy Policy and Conservation Act (42 U.S.C. 6326) is amended— (1) in subsection (a), by adding at the end the following: “ (3) Local distribution system The term local distribution system means any energy infrastructure owned and operated by an electric utility at a voltage of 100 kilovolts or less. ;” (2) in subsection (b)(2), by inserting “, and suppliers of equipment for the generation, transmission, and distribution of electricity to,” after “owners and operators of”; (3) in subsection (c)— (A) by amending paragraph (3) to read as follows: “ (3) address potential hazards to each energy sector or system, including— (A) physical threats and vulnerabilities, including— (i) weather-related threats and vulnerabilities; (ii) physical attacks on local distribution systems and the bulk-power system; and (iii) supply chain risks for equipment for the generation, transmission, and distribution of electricity; and (B) cybersecurity threats and vulnerabilities, including threats to, and vulnerabilities of, local distribution systems that may impact the bulk-power system; ; and” (B) by amending paragraph (5) to read as follows: “ (5) provide a risk mitigation approach to enhance reliability and end-use resilience, including methods of responding to, mitigating, and recovering from potential hazards described in paragraph (3); and ;” (4) in subsection (d)(3)— (A) in subparagraph (A), by striking “and” at the end; (B) by redesignating subparagraph (B) as subparagraph (C); and (C) by inserting after subparagraph (A) the following: “ (B) supplying equipment for the generation, transmission, and distribution of electricity; and ;” (5) in subsection (e)— (A) by striking “A State is not eligible” and inserting the following: “ (1) Submission required A State is not eligible ;” (B) in paragraph (2), by redesignating subparagraphs (A) and (B) as clauses (i) and (ii), respectively; (C) by redesignating paragraphs (1) and (2) as subparagraphs (A) and (B), respectively (and by moving the margins accordingly); and (D) by adding at the end the following: “ (2) State determination A submission under paragraph (1) is not required to be approved by the Secretary. ;” (6) in subsection (f), by striking “may” and inserting “shall”; (7) in subsection (h), by inserting “, local distribution system,” after “electric utility”; and (8) by striking subsection (i) and inserting the following: “ (i) Sunset This section shall expire on September 30, 2031. .”

    Also changed by S. 4166

Explained by gemini-3.8-flash on October 18, 2026, against the US Code through Public Law 119-121.