H.R. 5927In committeeEnergy

Securing Reliable Power for Advanced Technologies Act

RepublicanAndy Barr
Introduced November 7, 2025Origin: House

  1. Introduced

  2. In committee

    Current step
  3. Reported

    Not yet
  4. Passed House

    Not yet
  5. Passed Senate

    Not yet
  6. Resolving differences

    Not yet
  7. Sent to the president

    Not yet
  8. Signed

    Not yet
  9. Became law

    Not yet

AI-generated from the official bill text and not reviewed by a person. It may contain errors. How summaries are made

H.R. 5927 would amend the Defense Production Act of 1950 to allow the President to designate critical artificial intelligence infrastructure and related non-renewable power facilities as priority national defense projects, expediting federal permits and authorizing financial assistance.

Who it affects

This bill directly affects owners and operators of large-scale artificial intelligence data centers, non-renewable baseload power generation facilities (including coal, oil, and natural gas plants), electric utilities, rural electric cooperatives, fuel supply and pipeline companies, and federal agencies responsible for environmental reviews and permitting (such as the Department of Defense and the Department of Energy).

Based on the Introduced in House text · gemini-3.8-flash

Generated October 6, 2026 · Read the official text on Congress.gov

Your Vote

1 key actions of 2: Congress.gov's major actions and roll-call votes.

  1. Introduced in House

    Recorded by: Library of Congress

Sections of law the bill's Introduced in House text would amend, repeal or add to, found in the bill's own text. US Code current through Public Law 119-142.

  • Amends

    50 U.S.C. 4531

    Presidential authorization for the national defense

    No AI explanation of this change yet.

    The bill's instruction

    Title III of the Defense Production Act of 1950 (50 U.S.C. 4531 et seq.) is amended by adding at the end the following: “ 306. Acceleration of designated critical artificial intelligence infrastructure projects (a) Definitions In this section: (1) Covered project The term “covered project” means a project to construct, expand, repower, or reopen critical artificial intelligence infrastructure. (2) Critical artificial intelligence infrastructure The term “critical artificial intelligence infrastructure” means— (A) one or more data centers or high-performance computing facilities with a total connected electrical load of not less than 50 megawatts that is primarily dedicated to the training, development, or inference of artificial intelligence or other machine learning models; (B) any dispatchable baseload electric generation facility— (i) with a nameplate capacity of not less than 100 megawatts; (ii) capable, without regard to restrictions on use imposed solely for reasons other than engineering design or physical capability, of providing firm, dispatchable capacity and continuous electric service for not less than 85 percent of the hours in a typical calendar year; (iii) that does not derive its primary energy input from intermittent renewable sources, with or without energy storage; and (iv) is contractually committed, in whole or material part, to provide firm, dispatchable electric supply to facilities described in subparagraph (A), through the applicable retail electric utility or cooperative serving such facilities, consistent with State service laws; (C) associated high-voltage electric transmission facilities, including any network transmission upgrades necessary to reliably serve the facilities, essential to interconnect facilities described in subparagraph (A) or (B); or (D) fuel supply infrastructure essential to the operation of facilities described in subparagraph (B), including— (i) coal mines and coal preparation facilities, as defined in section 701 of the Surface Mining Control and Reclamation Act of 1977 (30 U.S.C. 1291); (ii) natural gas gathering, processing, storage, and transportation facilities subject to the Natural Gas Act (15 U.S.C. 717 et seq.); (iii) oil and gas wells and wellhead production facilities (as defined in section 3(4) of the Federal Oil and Gas Royalty Management Act of 1982 (30 U.S.C. 1702(4))), together with oil or petroleum product pipelines and related terminals (as such term relates to hazardous liquid pipeline facilities under section 60101(a)(22) of title 49, United States Code); and (iv) rail, barge, or other transportation infrastructure (as such terms are used in sections 13102(27) of title 49 and 2101(3) of title 46, United States Code) materially dedicated to the delivery of fuel to such facilities. (3) Federal authorization The term “Federal authorization” means any permit, license, approval, or other administrative decision required under Federal law to site, construct, expand, operate, or maintain a covered project. (b) Presidential designation The President may designate one or more covered projects as priority national defense projects and publish such designation in the Federal Register. (c) Concurrent permitting (1) Coordination For any covered project designated under subsection (a), the President shall require each head of a Federal agency with responsibility for issuing permits, licenses, or approvals to— (A) conduct reviews concurrently to the maximum extent practicable and consistent with applicable law; and (B) adhere to a consolidated schedule established by the President in accordance with paragraph (2). (2) Schedule The President shall ensure that a consolidated schedule described in paragraph (1)— (A) establishes interim milestones and deadlines for action by the head of a Federal agency described in paragraph (1) with respect to the designated covered project; and (B) requires completion of all necessary Federal authorizations not later than 2 years after receipt of a complete application from the owner of the covered project, un

    Also changed by H.R. 8071, H.R. 8030, H.R. 7688, S. 3530, H.R. 4835

  • Amends

    50 U.S.C. 4552

    Definitions

    Subsections (14)

    No AI explanation of this change yet.

    The bill's instruction

    Section 702(14) of the Defense Production Act of 1950 (50 U.S.C. 4552(14)) is amended by inserting “(including critical artificial intelligence infrastructure designated under section 306)” after “critical infrastructure protection and restoration”.

    Also changed by H.R. 10316, S. 3600, S. 429