Skip to main content
H.R. 3978Passed HouseEnergy

Nuclear REFUEL (Recycling Efficient Fuels Utilizing Expedited Licensing) Act

RepublicanRobert E. Latta
Introduced June 12, 2025Origin: House

  1. Introduced

  2. In committee

  3. Reported

  4. Passed House

    Current step
  5. Passed Senate

    Not yet
  6. Resolving differences

    Not yet
  7. Sent to the president

    Not yet
  8. Signed

    Not yet
  9. Became law

    Not yet

AI-generated from the official bill text, with the Congressional Research Service summary as context, and not reviewed by a person. It may contain errors. How summaries are made

The Nuclear REFUEL Act would amend the Atomic Energy Act of 1954 to exclude equipment and devices that reprocess spent nuclear fuel without isolating plutonium from the statutory definition of a production facility.

Who it affects

This bill directly affects the Nuclear Regulatory Commission, which regulates and licenses nuclear materials and facilities, as well as companies and entities developing or operating equipment and facilities designed to reprocess spent nuclear fuel without isolating plutonium.

Based on the Placed on Calendar Senate text · gemini-3.8-flash

Generated November 13, 2026 · Read the official text on Congress.gov

Official summary from the Congressional Research Service

Summary of the bill as Introduced in House · June 12, 2025

The bill has changed since this summary was written.

The following analysis is based on draft bill text that was made available by the House of Representatives and may differ from the bill text as introduced. Nuclear REFUEL (Recycling Efficient Fuels Utilizing Expedited Licensing) Act

Read this summary on Congress.gov

Your Vote

4 key actions of 18: Congress.gov's major actions and roll-call votes.

  1. On motion to suspend the rules and pass the bill, as amended Agreed to by the Yeas and Nays: (2/3 required): 397 - 2 (Roll no. 315). (text: CR H6096)

    Recorded by: House floor actions

    Roll call 315 (House)
  2. Passed/agreed to in House: On motion to suspend the rules and pass the bill, as amended Agreed to by the Yeas and Nays: (2/3 required): 397 - 2 (Roll no. 315). (text: CR H6096)

    Recorded by: Library of Congress

    Roll call 315 (House)
  3. Reported (Amended) by the Committee on Energy and Commerce. H. Rept. 119-871.

    Recorded by: House floor actions · Library of Congress

  4. Introduced in House

    Recorded by: Library of Congress

Sections of law the bill's Placed on Calendar Senate text would amend, repeal or add to, found in the bill's own text. US Code current through Public Law 119-142.

Explanations are AI-generated from the bill text and the current US Code and not reviewed by a person. They may contain errors; the bill's instruction and the current text are shown so you can check them. How explanations are made

  • Amends

    42 U.S.C. 2014

    Definitions

    Subsections (v)

    Under current law, the definition of a "production facility" generally excludes equipment or devices capable of separating uranium isotopes or enriching uranium in the isotope 235, except when dealing with the export of a uranium enrichment production facility under subchapters IX and XV. The bill would amend this definition by adding "or reprocessing" to the export exception and expanding the exclusion. Under the amendment, the definition of a "production facility" would not include equipment or devices capable of either: (A) separating isotopes of uranium or enriching uranium in the isotope 235; or (B) reprocessing spent nuclear fuel in a manner that does not isolate plutonium (except with respect to the export of a uranium enrichment or reprocessing production facility).

    The bill's instruction

    Section 11 v. of the Atomic Energy Act of 1954 (42 U.S.C. 2014(v)) is amended— (1) by inserting “or reprocessing” after “uranium enrichment”; and (2) by striking “separating the isotopes of uranium or enriching uranium in the isotope 235” and inserting “(A) separating isotopes of uranium or enriching uranium in the isotope 235; or (B) reprocessing spent nuclear fuel in a manner that does not isolate plutonium”.

    Also changed by S. 2082

Explained by gemini-3.8-flash on November 14, 2026, against the US Code through Public Law 119-138.