H.R. 3616Passed HouseEnergy

Reliable Power Act

RepublicanTroy Balderson
Introduced May 29, 2025Origin: House

  1. Introduced

  2. In committee

  3. Reported

  4. Passed House

    Current step
  5. Passed Senate

    Not yet
  6. Resolving differences

    Not yet
  7. Sent to the president

    Not yet
  8. Signed

    Not yet
  9. Became law

    Not yet

AI-generated from the official bill text, with the Congressional Research Service summary as context, and not reviewed by a person. It may contain errors. How summaries are made

The Reliable Power Act would require annual electric reliability assessments and establish a review process for federal regulations affecting power generation if the bulk-power system faces a generation shortfall.

Who it affects

Federal cabinet agencies (particularly the Department of Energy and Environmental Protection Agency), the Federal Energy Regulatory Commission, the designated Electric Reliability Organization, and users, owners, and operators of bulk-power system generation and transmission facilities.

Based on the Referred in Senate text · gemini-3.8-flash

Generated October 3, 2026 · Read the official text on Congress.gov

Official summary from the Congressional Research Service

Summary of the bill as Reported to House · September 17, 2025

The bill has changed since this summary was written.

Reliable Power Act This bill directs the electric reliability organization (i.e., the North American Electric Reliability Corporation) to conduct annual long-term assessments of the reliability of electric power in the bulk-power system. It also establishes a process for the Federal Energy Regulatory Commission (FERC) to review federal regulations before they are finalized if the electric reliability organization finds that the system is at risk of not having sufficient electric generation to maintain reliability.

Read this summary on Congress.gov

Your Vote

4 key actions of 21: Congress.gov's major actions and roll-call votes.

  1. Passed/agreed to in House: On passage Passed by the Yeas and Nays: 225 - 203 (Roll no. 347).

    Recorded by: Library of Congress

  2. Supplemental report filed by the Committee on Energy and Commerce, H. Rept. 119-302, Part II.

    Recorded by: House floor actions · Library of Congress

  3. Reported (Amended) by the Committee on Energy and Commerce. H. Rept. 119-302.

    Recorded by: House floor actions · Library of Congress

  4. Introduced in House

    Recorded by: Library of Congress

Sections of law the bill's Referred in Senate text would amend, repeal or add to, found in the bill's own text. US Code current through Public Law 119-138.

Explanations are AI-generated from the bill text and the current US Code and not reviewed by a person. They may contain errors; the bill's instruction and the current text are shown so you can check them. How explanations are made

  • Amends

    16 U.S.C. 824o

    Electric reliability

    Currently, the Electric Reliability Organization (ERO) is directed to conduct periodic assessments of the reliability and adequacy of the bulk-power system in North America. The bill would amend this requirement to specify that the ERO must conduct an annual long-term assessment. This assessment must analyze the system's ability to supply sufficient energy under normal and extreme weather conditions, evaluate regional shortfall risks, and determine if additional generation is needed. The ERO would be authorized to collect data from system users, owners, and operators, and would be required to publicly notify the Federal Energy Regulatory Commission (FERC) if it finds a risk of inadequate generation. Upon receiving such notice, FERC would notify the Department of Energy, the Environmental Protection Agency, and other relevant federal agencies. These agencies would then be required to submit covered agency actions to FERC for review and comment before finalizing them. The bill's instruction truncates the full text of the review and response requirements.

    The bill's instruction

    Section 215 of the Federal Power Act (16 U.S.C. 824o) is amended— (1) in subsection (g)— (A) by striking “The ERO” and inserting the following: “ (1) In general The ERO ; and” (B) by adding at the end the following: “ (2) Annual long-term assessment The assessments under paragraph (1) shall include an annual long-term assessment, which shall include— (A) an analysis of the ability of the bulk-power system to supply sufficient electric energy necessary to maintain an adequate level of reliability, taking into account generation resource mix, transmission development, and electric energy demand trends; (B) an analysis of the risk of future electric energy supply shortfalls under normal and extreme weather conditions, and the risk of any such shortfalls within each region of the bulk-power system; and (C) a determination of whether additional generation resources are necessary to supply sufficient electric energy to maintain an adequate level of reliability during the assessment period. (3) Notice of generation inadequacy In conducting a long-term assessment under paragraph (2), if the ERO finds that the bulk-power system is at risk of not having adequate generation resources to supply sufficient electric energy to maintain an adequate level of reliability, the ERO shall publicly notify the Commission that the bulk-power system is in a state of generation inadequacy. (4) Data collection To conduct a long-term assessment under paragraph (2), the ERO may collect information and data from users, owners, and operators of the bulk-power system. ;” (2) by redesignating subsections (h) through (k) as subsections (i) through (l), respectively; and (3) by inserting after subsection (g) the following: “ (h) Commission review and comment for covered agency actions (1) Notice to federal agencies If the ERO notifies the Commission under subsection (g)(3) that the bulk-power system is in a state of generation inadequacy, the Commission shall promptly notify the Department of Energy, the Environmental Protection Agency, and any other Federal agency the Commission determines appropriate of such state of generation inadequacy. (2) Submission Upon receiving notice under paragraph (1), the head of each Federal agency that received such notice shall provide to the Commission for review and comment any covered agency action by the Federal agency— (A) on the first date on which such covered agency action is provided to the Office of Management and Budget or any other Federal agency for review and comment; or (B) if such covered agency action is not provided to the Office of Management and Budget or any other Federal agency for review and comment, not later than 90 days before the date on which the covered agency action is published in the Federal Register or is otherwise made available for public inspection or comment. (3) Commission comments The Commission, in consultation with the ERO and transmission organizations, shall, by order, provide to the agency head that provided to the Commission a covered agency action under paragraph (2)— (A) comments on such covered agency action, which such comments may include an assessment of the effect of the covered agency action on rates, terms, and conditions for services pursuant to the authority of the Commission under sections 201 and 206; and (B) if applicable, recommendations for modifications to the covered agency action to prevent a significant negative impact on the ability of the bulk-power system to supply sufficient electric energy necessary to maintain an adequate level of reliability. (4) Agency response The head of a Federal agency may not finalize a covered agency action that is provided to the Commission under paragraph (2) until— (A) the agency head responds in writing to the Commission with an explanation of how the agency head modified, or why the agency head determined not to modify, such covered agency action in response to any comments and recommendations provided by the Commission under paragraph (3); and (B) the Commission finds that the covered agency acti

    Also changed by S. 3976, H.R. 7728, S. 3034

Explained by gemini-3.8-flash on October 19, 2026, against the US Code through Public Law 119-121.

Bills Congress.gov lists as related, and bills that share legislative subjects with this one.