IMPACT Act 2.0
Introduced
In committee
Current stepReported
Not yetPassed House
Not yetPassed Senate
Not yetResolving differences
Not yetSent to the president
Not yetSigned
Not yetBecame law
Not yet
AI-generated from the official bill text, with the Congressional Research Service summary as context, and not reviewed by a person. It may contain errors. How summaries are made
The IMPACT Act 2.0 would provide reimbursements, incentives, and technical assistance to states using low-emissions transportation materials in highway projects and allow federal funds to support multi-year advance purchase contracts for innovative domestic construction materials.
Who it affects
The bill directly affects state departments of transportation managing highway projects, the Federal Highway Administration, and domestic manufacturers and producers of cement, concrete, asphalt binder, and asphalt mixtures.
Based on the Introduced in House text · gemini-3.8-flash
Generated October 8, 2026 · Read the official text on Congress.gov
Official summary from the Congressional Research Service
Summary of the bill as Introduced in House · March 14, 2025
IMPACT Act 2.0 This bill expands and modifies Federal Highway Administration (FHWA) programs, including the Surface Transportation Block Grant (STBG) program, to provide states reimbursement, incentives, and technical assistance to purchase low-emissions cement, concrete, asphalt binder, or asphalt mixtures. Under the bill, these are products that reduce, to the maximum extent practicable, greenhouse gas or directly related pollutant emissions to levels below the commercially available products. Specifically, the FHWA must provide to states
Your Vote
1 key actions of 3: Congress.gov's major actions and roll-call votes.
Introduced in House
Recorded by: Library of Congress
Sections of law the bill's Introduced in House text would amend, repeal or add to, found in the bill's own text. US Code current through Public Law 119-142.
- Amends
23 U.S.C. 133
Surface transportation block grant program
No AI explanation of this change yet.
The bill's instruction
Section 133 of title 23, United States Code, is amended— (1) in subsection (b) by adding at the end the following: “ (25) A project that includes the use of innovative, domestically produced cement, concrete, asphalt mixture, or asphalt binder manufactured using a process described in subsection (l). (26) Subject to subsection (m), a project that is carried out through an advance multiyear contract with a producer for a specified quantity and specified price of innovative, domestically produced cement, concrete, asphalt mixture, or asphalt binder manufactured using a process described in subsection (l). ; and ” (2) by adding at the end the following: “ (l) Requirements for certain projects The process referred to in paragraphs (25) and (26) of subsection (b) is a manufacturing process that— (1) produces materials with— (A) superior durability to conventional materials; and (B) superior performance with respect to— (i) compressive strength; (ii) tensile strength; or (iii) workability; or (2) produces materials that meet the engineering specifications of the State and achieve superior performance with respect to— (A) environmental performance; or (B) energy efficiency. .” Section 133(h)(6) of title 23, United States Code, is amended by adding at the end the following: “ (D) Procurement for innovative building materials (i) In general A State may use the funds set aside under this subsection to enter into an advance multi-year contract described in subsection (m) for a specified quantity and specified price of innovative, domestically produced cement, concrete, asphalt mixture, or asphalt binder. (ii) Use of funds States may not provide payments to the producer as part of the advance procurement under clause (i) unless materials have been delivered according to contract terms and conditions. .” Section 133 of title 23, United States Code, is further amended by adding at the end the following: “ (m) Advance multi-Year contracts Except as otherwise provided in this section, none of the funds made available under this section may be used for a multi-year contract unless— (1) cancellation provisions in the contract do not include consideration of recurring manufacturing costs of the producer associated with the production of unfunded units to be delivered under the contract; (2) the contract provides that payments to the producer under the contract shall not be made in advance of incurred costs on funded units; (3) the contract does not provide for a price adjustment based on a failure to award a follow-on contract; (4) the producer submits a statement describing the quantity and cost of the cement, concrete, asphalt mixture, and asphalt binder; (5) the producer demonstrates material steps towards commercial production and operational capacity of cement, concrete, asphalt mixture, or asphalt binder production with respect to logistics, planned material storage, handling capacities, and delivery mechanisms, of which failure to demonstrate material progress towards commercial production and operational capacity may result in termination of a portion or all of the advance procurement at the sole discretion of the State; and (6) the contract fulfills, to the maximum extent possible, preference criteria set by the State. .”
Also changed by S. 5407, H.R. 9041, H.R. 8870, H.R. 8719, H.R. 8717