Skip to main content
H.R. 8812Passed HouseWater Resources Development

Water Resources Development Act of 2024

RepublicanSam Graves
Introduced June 25, 2024Origin: House

  1. Introduced

  2. In committee

  3. Reported

  4. Passed House

    Current step
  5. Passed Senate

    Not yet
  6. Resolving differences

    Not yet
  7. Sent to the president

    Not yet
  8. Signed

    Not yet
  9. Became law

    Not yet

AI-generated from the official bill text, with the Congressional Research Service summary as context, and not reviewed by a person. It may contain errors. How summaries are made

H.R. 8812 authorizes, modifies, and deauthorizes U.S. Army Corps of Engineers water resources development projects, feasibility studies, and environmental infrastructure programs, while revising policies on project delivery, dam safety, dredged material use, and non-Federal partnerships.

Who it affects

This bill directly affects the U.S. Army Corps of Engineers, non-Federal project sponsors (including state, local, and Tribal governments), port authorities, levee and dam owners, and communities seeking federal assistance for flood mitigation, navigation improvements, and environmental water infrastructure.

Based on the Received in Senate text · gemini-3.8-flash

Generated October 3, 2026 · Read the official text on Congress.gov

Official summary from the Congressional Research Service

Summary of the bill as Reported to House · July 18, 2024

The bill has changed since this summary was written.

Water Resources Development Act of 2024 This bill authorizes, deauthorizes, and modifies various water resources feasibility studies and projects of the U.S. Army Corps of Engineers, such as studies or projects to • make certain waterways more navigable, • reduce flood and storm damage, • restore aquatic ecosystems, • maintain ports and harbors, • support water supply and storage projects, • construct water and wastewater infrastructure, • manage recreational sites and facilities, • rehabilitate dams, and • support other water resources infrastructure.

Read this summary on Congress.gov

Your Vote

3 key actions of 16: Congress.gov's major actions and roll-call votes.

  1. Passed/agreed to in House: On motion to suspend the rules and pass the bill, as amended Agreed to by the Yeas and Nays: (2/3 required): 359 - 13 (Roll no. 358). (text: CR H4665-4703)

    Recorded by: Library of Congress

  2. Reported (Amended) by the Committee on Transportation and Infrastructure. H. Rept. 118-587.

    Recorded by: House floor actions · Library of Congress

  3. Introduced in House

    Recorded by: Library of Congress

Sections of law the bill's Received in Senate text would amend, repeal or add to, found in the bill's own text. US Code current through Public Law 119-142.

  • Amends

    Section 444 of the Water Resources Development Act of 1996

    Not in the US Code

    The bill's instruction

    Section 444 of the Water Resources Development Act of 1996 (110 Stat. 3747; 113 Stat. 286) is amended by inserting “Hawaii,” after “Guam,”.
  • Amends

    Section 8133 of the Water Resources Development Act of 2022

    Not in the US Code

    Subsections (c)

    The bill's instruction

    Section 8133(c) of the Water Resources Development Act of 2022 (136 Stat. 3720) is amended to read as follows: “ (c) Projects In awarding contracts under subsection (a), the Secretary shall consider projects that— (1) improve navigation reliability on inland waterways that are accessible year-round; (2) increase freight capacity on inland waterways; and (3) have the potential to enhance the availability of containerized cargo on inland waterways. .”
  • Amends

    33 U.S.C. 2213

    Flood control and other purposes

    Subsections (m), (k)(4), (k)

    No AI explanation of this change yet.

    The bill's instruction

    Section 103(m) of the Water Resources Development Act of 1986 (33 U.S.C. 2213(m)) is amended— (1) in paragraph (1) by striking “an agricultural” and inserting “a”; (2) by striking paragraphs (2) and (3) and inserting the following: “ (2) Criteria The Secretary shall determine the ability of a non-Federal interest to pay under this subsection by considering— (A) per capita income data for the county or counties in which the project is to be located; (B) the per capita non-Federal cost of construction of the project for the county or counties in which the project is to be located; (C) the financial capabilities of the non-Federal interest for the project; (D) the guidance issued under section 160 of the Water Resources Development Act of 2020 (33 U.S.C. 2201 note); and (E) any additional criteria relating to the non-Federal interest's financial ability to carry out its cost-sharing responsibilities determined appropriate by the Secretary. (3) Procedures For purposes of carrying out paragraph (2), the Secretary shall develop procedures— (A) to allow a non-Federal interest to identify the amount such non-Federal interest would likely be able to pay; and (B) for a non-Federal interest to submit a request to the Secretary to reduce the required non-Federal share. ; and” (3) by adding at the end the following: “ (5) Benefits analysis considerations In calculating the benefits and costs of project alternatives relating to the height of a flood risk reduction project for purposes of determining the national economic development benefits of the project, the Secretary— (A) shall include insurance costs incurred by homeowners; and (B) may consider additional costs incurred by households, as appropriate. (6) Exception This subsection shall not apply to project costs greater than the national economic determination plan. (7) Report (A) In general Not less frequently than annually, the Secretary shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate a report describing all determinations of the Secretary under this subsection regarding the ability of a non-Federal interest to pay. (B) Contents The Secretary shall include in each report required under subparagraph (A) a description, for the applicable year, of— (i) requests by a non-Federal interest to reduce the non-Federal share required in a cost-sharing agreement; (ii) the determination of the Secretary with respect to each such request; and (iii) the basis for each such determination. (C) Inclusion in Chief’s report The Secretary shall include each determination to reduce the non-Federal share required in a cost-sharing agreement for construction of a project in the report of the Chief of Engineers for the project. .” Section 103(k)(4) of the Water Resources Development Act of 1986 (33 U.S.C. 2213(k)(4)) is amended— (1) in subparagraph (A)— (A) in clause (i), by striking “makes” and inserting “made”; and (B) in clause (ii), by striking “repays an amount equal to 2/3 of the remaining principal by” and inserting “made a payment of an additional $200,000,000 for that eligible deferred payment agreement on or before”; (2) in subparagraph (B) by inserting “interest’s” after “non-Federal”; and (3) by adding at the end the following: “ (C) Refund of credit Any agreement made that applied credits to satisfy the terms of a pre-payment made under subsection (k)(4)(A) that resulted in total payment in excess of the amount now required under subsection (k)(4)(A) shall be modified to indicate that the excess credits continue to apply toward any remaining principal of the respective project, or at the request of the non-Federal interest, the agreement shall be modified to retroactively transfer back those excess credits to the non-Federal interest such that those credits may be applied by the non-Federal interest to any cost-shared project identified by the non-Federal interest. .”

    Also changed by S. 4367

  • Repeals

    Section 219 of the Water Resources Development Act of 1992

    Not in the US Code

    Subsections (f)(404), (f), (f)(80), (f)(86), (f)(87), (f)(93), (c)(27), (e)(15), (f)(52), (f)(129), (e)(5), (f)(136), (f)(323), (f)(54), (f)(330), (f)(55), (f)(333), (f)(334), (f)(21), (f)(146), (f)(153), (f)(336), (f)(30)

    The bill's instruction

    Section 219(f)(404) of the Water Resources Development Act of 1992 is repealed. Section 219(f) of the Water Resources Development Act of 1992 (106 Stat. 4835; 113 Stat. 336; 121 Stat. 1258; 136 Stat. 3808) is amended by adding at the end the following: “ (406) Buckeye, Arizona $12,000,000 for water and wastewater infrastructure, including water reclamation, City of Buckeye, Arizona. (407) Flagstaff, Arizona $5,000,000 for water and wastewater infrastructure, including water reclamation, City of Flagstaff, Arizona. (408) Page, Arizona $10,000,000 for water and wastewater infrastructure, including water reclamation, City of Page, Arizona. (409) Sahuarita, Arizona $4,800,000 for water and wastewater infrastructure, including water reclamation, in the town of Sahuarita, Arizona. (410) Tucson, Arizona $20,000,000 for water and wastewater infrastructure, including water reclamation, City of Tucson, Arizona. (411) Winslow, Arizona $3,000,000 for water and wastewater infrastructure, including water reclamation, City of Winslow, Arizona. (412) Adelanto, California $4,000,000 for water and wastewater infrastructure in the City of Adelanto, California. (413) Aptos, California $10,000,000 for water and wastewater infrastructure in the town of Aptos, California. (414) Bishop, California $2,500,000 for water and wastewater infrastructure in the city of Bishop, California. (415) Bloomington, California $20,000,000 for water and wastewater infrastructure, including stormwater management, in Bloomington, California. (416) Butte County, California $50,000,000 for water and wastewater infrastructure, including stormwater management, water supply, environmental restoration, and surface water resource protection in Butte County, California. (417) California City, California $1,902,808 for water and wastewater infrastructure, including water supply, in the city of California City, California. (418) Carson, California $11,000,000 for water and water supply infrastructure in the City of Carson, California. (419) Cedar Glen, California $35,000,000 for water and wastewater infrastructure, including water supply and water storage, in Cedar Glen, California. (420) Culver City, California $10,000,000 for water and wastewater infrastructure, including water supply and drinking water, in City of Culver City, California. (421) Colton, California $20,000,000 for water and wastewater infrastructure, including stormwater management, in the city of Colton, California. (422) East San Fernando Valley, California $50,000,000 for water and wastewater infrastructure, including stormwater management, drinking water, and water supply, in the City of Los Angeles, California, including Sun Valley. (423) Fresno County, California $20,000,000 for water and water supply infrastructure, including stormwater management, surface water resource protection, and environmental restoration, in Fresno County, California. (424) Georgetown Divide Public Utility District, California $20,500,000 for water and wastewater infrastructure, including water supply and water storage, for communities served by the Georgetown Divide Public Utility District, California. (425) Grand Terrace, California $10,000,000 for water and wastewater infrastructure, including stormwater management, in the city of Grand Terrace, California. (426) Hayward, California $15,000,000 for water and wastewater infrastructure, including related environmental infrastructure, in the city of Hayward, California. (427) Hollister, California $5,000,000 for water and wastewater infrastructure in the city of Hollister, California. (428) Kern County, California $50,000,000 for water and water supply infrastructure in Kern County, California. (429) Lake County, California $20,000,000 for water and wastewater infrastructure, including stormwater management, in Lake County, California. (430) Lake Tahoe Basin $20,000,000 for water and wastewater infrastructure, including water supply, in the communities within the Lake Tahoe Basin in Nevada and California. (431) La Quinta, California $4,000,000 for water and wastewater infrastructure, in the City of La Quinta, California. (432) Lakewood, California $8
  • Amends

    33 U.S.C. 414

    Vessel removal by Corps of Engineers

    No AI explanation of this change yet.

    The bill's instruction

    Section 19 of the Act of March 3, 1899 (33 U.S.C. 414) is amended— (1) by striking “Sec. 19. (a) That whenever” and inserting the following: “ 19. Vessel removal by Corps of Engineers (a) Removal of obstructive vessels (1) In general That whenever ;” (2) in subsection (b)— (A) by striking “described in this section” and inserting “described in this subsection”; and (B) by striking “under subsection (a)” and inserting “under paragraph (1)”; (3) by striking “(b) The owner” and inserting the following: “ (2) Liability of owner, lessee, or operator The owner ; and” (4) by adding at the end the following: “ (b) Removal of abandoned vessel (1) In general The Secretary is authorized to remove from the navigable waters of the United States a covered vessel that does not obstruct the navigation of such waters, if— (A) such removal is determined to be in the public interest by the Secretary, in consultation with any State in which the vessel is located or any Indian Tribe with jurisdiction over the area in which the vessel is located, as applicable; and (B) in the case of a vessel that is not under the control of the United States by reason of seizure or forfeiture, the Commandant of the Coast Guard determines that the vessel is abandoned. (2) Interagency agreements In removing a covered vessel under this subsection, the Secretary— (A) shall enter into an interagency agreement with the head of any Federal department, agency, or instrumentality that has control of such vessel; and (B) is authorized to accept funds from such department, agency, or instrumentality for the removal of such vessel. (3) Liability The owner of a covered vessel shall be liable to the United States for the costs of removal, destruction, and disposal of such vessel under this subsection. (4) Covered vessel defined (A) In general In this subsection, the term “covered vessel” means a vessel— (i) determined to be abandoned by the Commandant of the Coast Guard; or (ii) under the control of the United States by reason of seizure or forfeiture pursuant to any law. (B) Exclusion The term “covered vessel” does not include— (i) any vessel for which the Secretary has removal authority under subsection (a) or section 20; (ii) an abandoned barge for which the Commandant of the Coast Guard has the authority to remove under chapter 47 of title 46, United States Code; and (iii) a vessel— (I) for which the owner is not identified, unless determined to be abandoned by the Commandant of the Coast Guard; or (II) for which the owner has not agreed to pay the costs of removal, destruction, or disposal. (5) Authorization of appropriations There is authorized to be appropriated to carry out this section $10,000,000 for each of fiscal years 2025 through 2029. .”

    Also changed by S. 4367

  • Amends

    33 U.S.C. 416

    Appropriations for removal of sunken water craft

    No AI explanation of this change yet.

    The bill's instruction

    Section 20 of the Act of March 3, 1899 (33 U.S.C. 416) is amended by striking “the preceding section of this Act” and inserting “section 19(a)”.

    Also changed by S. 4367

  • Amends

    33 U.S.C. 2332

    Shoreline and riverine protection and restoration

    Subsections (e)(2)

    No AI explanation of this change yet.

    The bill's instruction

    Section 212(e)(2) of the Water Resources Development Act of 1999 (33 U.S.C. 2332(e)(2)) is amended by adding at the end the following: “ (L) Shoreline of the State of Connecticut. .”

    Also changed by S. 4367

  • Amends

    33 U.S.C. 610

    Control of aquatic plant growths and invasive species

    No AI explanation of this change yet.

    The bill's instruction

    Section 104 of the River and Harbor Act of 1958 (33 U.S.C. 610) is amended— (1) in subsection (e)(3), by inserting “, and monitoring and contingency planning for,” after “early detection of”; and (2) in subsection (g)(2)(A), by inserting “the Connecticut River Basin,” after “the Ohio River Basin,”. Section 128 of the Water Resources Development Act of 2020 (33 U.S.C. 610 note) is amended— (1) in subsection (a), by inserting “or affecting water bodies of regional, national, or international importance” after “projects”; (2) in subsection (b)(1), by striking “and State agencies” and inserting “, State, and local agencies, institutions of higher education, and private organizations, including nonprofit organizations”; (3) in subsection (c) in paragraph (6), insert “Watershed” after “Okeechobee”; (4) in subsection (e), by striking “$25,000,000” and inserting “$35,000,000”; and (5) by adding at the end the following: “ (f) Priority In carrying out the demonstration program under subsection (a), the Secretary shall, to the maximum extent possible, prioritize carrying out program activities that— (1) reduce nutrient pollution; (2) utilize natural and nature-based approaches, including oysters; (3) protect, enhance, or restore wetlands or flood plains, including river and streambank stabilization; (4) develop technologies for remote sensing, monitoring, or early detection of harmful algal blooms, or other emerging technologies; and (5) combine removal of harmful algal blooms with a beneficial use, including conversion of retrieved algae biomass into biofuel, fertilizer, or other products. (g) Agreements In carrying out the demonstration program under subsection (a), the Secretary may enter into agreements with a non-Federal entity for the use or sale of successful technologies developed under this section. .” Section 509(a) of the Water Resources Development Act of 2020 (33 U.S.C. 610 note) is amended— (1) in paragraph (2)(C)(ii), by striking “2024” and inserting “2030”; and (2) in paragraph (7), by striking “2 years thereafter” and inserting “2 years after the date of enactment of the Water Resources Development Act of 2024”.

    Also changed by S. 4367, H.R. 6093

  • Repeals

    33 U.S.C. 701n

    Emergency response to natural disasters

    Subsections (c)

    No AI explanation of this change yet.

    The bill's instruction

    Section 5(c) of the Act of August 18, 1941 (33 U.S.C. 701n(c)) is amended— (1) by striking paragraph (2) and inserting the following: “ (2) Systemwide improvement plan (A) In general Notwithstanding the status of compliance of a non-Federal interest with the requirements of a levee owner’s manual, or any other eligibility requirement established by the Secretary related to the maintenance and upkeep responsibilities of the non-Federal interest, the Secretary shall consider the non-Federal interest to be eligible for repair and rehabilitation assistance under this section if— (i) in coordination with the Secretary, the non-Federal interest develops a systemwide improvement plan that— (I) identifies any items of deferred or inadequate maintenance and upkeep, including any such items identified by the Secretary or through periodic inspection of the flood control work; (II) identifies any additional measures, including repair and rehabilitation work, that the Secretary determines necessary to ensure that the flood control work performs as designed and intended; and (III) includes specific timelines for addressing such items and measures; and (ii) the Secretary— (I) determines that the systemwide improvement plan meets the requirements of clause (i); and (II) determines that the non-Federal interest makes satisfactory progress in meeting the timelines described in clause (i)(III). (B) Grandfathered encroachments At the request of the non-Federal interest, the Secretary— (i) shall review documentation developed by the non-Federal interest showing a covered encroachment does not negatively impact the integrity of the flood control work; (ii) shall make a written determination with respect to whether removal or modification of such covered encroachment is necessary to ensure the encroachment does not negatively impact the integrity of the flood control work; and (iii) may not determine that a covered encroachment is a deficiency requiring corrective action unless such action is necessary to ensure the encroachment does not negatively impact the integrity of the flood control work. ; and” (2) in paragraph (4), by adding at the end the following: “ (C) Covered encroachment The term “covered encroachment” means a permanent nonproject structure that— (i) is located inside the boundaries of a flood control work; (ii) is depicted on construction drawings or operation and maintenance plans for the flood control work that are signed by an engineer of record; and (iii) is determined, by the Secretary, to be an encroachment of such flood control work. .” Section 3011 of the Water Resources Reform and Development Act of 2014 (33 U.S.C. 701n note) is repealed.

    Also changed by S. 4367

  • Amends

    Section 509 of the Water Resources Development Act of 1996

    Not in the US Code

    Subsections (a)

    The bill's instruction

    Section 509(a) of the Water Resources Development Act of 1996 (110 Stat. 3759; 113 Stat. 339; 114 Stat. 2679; 136 Stat. 3779) is amended by adding at the end the following: “ (23) West Dundalk Branch Channel and Dundalk-Seagirt Connecting Channel, Baltimore Harbor Anchorages and Channels, Maryland. (24) Crown Bay Marina Channel, United States Virgin Islands. (25) Pidgeon Industrial Area Harbor, Memphis, Tennessee. (26) McGriff Pass Channel, Florida. (27) Oak Harbor Channel and Breakwater, Washington. (28) Ediz Hook, Port Angeles, Washington. .”
  • Amends

    33 U.S.C. 467

    Definitions

    No AI explanation of this change yet.

    The bill's instruction

    Section 2 of the National Dam Safety Program Act (33 U.S.C. 467) is amended— (1) by redesignating paragraph (16) as paragraph (17); and (2) by inserting after paragraph (15) the following: “ (16) Underserved community The term underserved community means a community with a population of less than 50,000 that has a median household income of less than 80 percent of the statewide median household income. .”

    Also changed by S. 4367

  • Amends

    33 U.S.C. 467d

    National inventory of dams and low-head dams

    No AI explanation of this change yet.

    The bill's instruction

    Section 6 of the National Dam Safety Program Act (33 U.S.C. 467d) is amended to read as follows: “ 6. National inventory of dams and low-head dams (a) In general The Secretary of the Army shall maintain and update information on the inventory of dams and low-head dams in the United States. (b) Dams The inventory maintained under subsection (a) shall include any available information assessing each dam based on inspections completed by a Federal agency, a State dam safety agency, or a Tribal government. (c) Low-Head dams The inventory maintained under subsection (a) shall include— (1) the location, ownership, description, current use, condition, height, and length of each low-head dam; (2) any information on public safety conditions at each low-head dam; and (3) any other relevant information concerning low-head dams. (d) Data In carrying out this section, the Secretary shall— (1) coordinate with Federal and State agencies, Tribal governments, and other relevant entities; and (2) use data provided to the Secretary by those agencies and entities. (e) Public availability The Secretary shall make the inventory maintained under subsection (a) publicly available (including on a publicly available website), including— (1) public safety information on the dangers of low-head dams; and (2) a directory of financial and technical assistance resources available to reduce safety hazards and fish passage barriers at low-head dams. (f) Clarification Nothing in this section provides authority to the Secretary to carry out an activity, with respect to a low-head dam, that is not explicitly authorized under this section. (g) Low-Head dam defined In this section, the term “low-head dam” means a river-wide artificial barrier that generally spans a stream channel, blocking the waterway and creating a backup of water behind the barrier, with a drop off over the wall of not less than 6 inches and not more than 25 feet. .”

    Also changed by S. 4367

  • Amends

    33 U.S.C. 467f-2

    Rehabilitation of high hazard potential dams

    No AI explanation of this change yet.

    The bill's instruction

    Section 8A of the National Dam Safety Program Act (33 U.S.C. 467f–2) is amended— (1) in subsection (c)(2), by striking subparagraph (C) and inserting the following: “ (C) Grant assurance As part of a grant agreement under subparagraph (B), the Administrator shall require that each eligible subrecipient to which the State awards a grant under this section provides an assurance from the dam owner, with respect to the dam to be rehabilitated, that the dam owner will carry out a plan for maintenance of the dam during the expected life of the dam. ;” (2) in subsection (d)(2)(C), by striking “commit” and inserting “for a project not including removal, obtain a commitment from the dam owner”; (3) by striking subsection (e) and inserting the following: “ (e) Floodplain management plans (1) In general As a condition of receipt of assistance under this section, an eligible subrecipient shall demonstrate that a floodplain management plan to reduce the impacts of future flood events from a controlled or uncontrolled release from the dam or management of water levels in the area impacted by the dam— (A) for a removal— (i) is in place; and (ii) identifies areas that would be impacted by the removal of the dam and includes a communication and outreach plan for the project and the impact of the project on the affected communities; or (B) for a project not including removal— (i) is in place; or (ii) will be— (I) developed not later than 2 years after the date of execution of a project agreement for assistance under this section; and (II) implemented not later than 2 years after the date of completion of construction of the project. (2) Requirement In the case of a plan for a removal, the Administrator may not impose any additional requirements or conditions other than the requirements in paragraph (1)(A). (3) Inclusions A plan under paragraph (1)(B) shall address— (A) potential measures, practices, and policies to reduce loss of life, injuries, damage to property and facilities, public expenditures, and other adverse impacts of flooding in the area protected or impacted by the dam; (B) plans for flood fighting and evacuation; and (C) public education and awareness of flood risks. (4) Plan criteria and technical support The Administrator, in consultation with the Board, shall provide criteria, and may provide technical support, for the development and implementation of floodplain management plans prepared under this subsection. ;” (4) in subsection (g)(1)— (A) in subparagraph (A), by striking “Any” and inserting “Except as provided in subparagraph (C), any”; and (B) by adding at the end the following: “ (C) Underserved communities Subparagraph (A) shall not apply to a project carried out by or for the benefit of an underserved community. .” Section 1177 of the Water Resources Development Act of 2016 (33 U.S.C. 467f–2 note) is amended— (1) in subsection (e)— (A) by striking “The Secretary” and inserting the following: “ (1) In general Except as provided in paragraph (2), the Secretary ; and” (B) by adding at the end the following: “ (2) Exception For a project under this section for which the Federal share of the costs is expected to exceed $60,000,000, the Secretary may expend more than such amount only if— (A) the Secretary submits to Congress the determination made under subsection (a) with respect to the project; and (B) construction of the project substantially in accordance with the plans, and subject to the conditions described in such determination is specifically authorized by Congress. ; and” (2) in subsection (f), by striking “2017 through 2026” and inserting “2025 through 2030”.

    Also changed by S. 4367

  • Amends

    33 U.S.C. 467j

    Authorization of appropriations

    No AI explanation of this change yet.

    The bill's instruction

    Section 14 of the National Dam Safety Program Act (33 U.S.C. 467j) is amended— (1) in subsection (a)— (A) in paragraph (1), by striking “2023” and inserting “2028”; and (B) in paragraph (2)— (i) in subparagraph (A), by inserting “and low-head dams” after “inventory of dams” each place it appears; and (ii) by amending subparagraph (B) to read as follows: “ (B) Maximum amount of allocation The amount of funds allocated to a State under this paragraph for a fiscal year may not exceed the amount that is equal to 4 times the amount of funds committed by the State to implement dam safety activities for that fiscal year. ;” (2) in subsection (b)— (A) by striking the subsection heading and inserting “National inventory of dams and low-Head dams”; and (B) by striking “2023” and inserting “2028”; (3) in subsection (c), by striking “2023” and inserting “2028”; (4) in subsection (d), by striking “2023” and inserting “2028”; (5) in subsection (e), by striking “2023” and inserting “2028”; and (6) in subsection (f), by striking “2023” and inserting “2028”.

    Also changed by S. 4367

  • Repeals

    33 U.S.C. 467o

    Repealed. Pub. L. 118–272, div. A, title I, § 1132(e), Jan. 4, 2025, 138 Stat. 3024

    No AI explanation of this change yet.

    The bill's instruction

    Section 15 of the National Dam Safety Program Act (33 U.S.C. 467o) is repealed.

    Also changed by S. 4367

  • Amends

    16 U.S.C. 460d-3

    Recreational user fees

    Subsections (b)

    No AI explanation of this change yet.

    The bill's instruction

    Section 210(b) of the Flood Control Act of 1968 (16 U.S.C. 460d–3(b)) is amended— (1) in paragraph (1), by striking “Notwithstanding” and all that follows through “to establish” and inserting “Subject to paragraphs (2) and (3), the Secretary of the Army may establish”; (2) in paragraph (3), by striking “vehicle. Such maximum amount” and inserting “vehicle, which amount”; and (3) by striking paragraph (4) and inserting the following: “ (4) Deposit in Treasury Subject to paragraph (5), the fees collected under this subsection shall be deposited in the Treasury of the United States as miscellaneous receipts. (5) Retention and use by Secretary (A) Retention Of the fees collected under this subsection, the Secretary may retain, for use in accordance with subparagraph (B)(ii), beginning in fiscal year 2035 and each fiscal year thereafter, the total amount of fees collected under this subsection for the fiscal year. (B) Use The amounts retained by the Secretary under subparagraph (A) shall— (i) be deposited in a special account, to be established in the Treasury; and (ii) be available for use, without further appropriation, for the operation and maintenance of recreation sites and facilities under the jurisdiction of the Secretary, subject to the condition that not less than 80 percent of fees collected at a specific recreation site shall be used at such site. (6) Treatment Fees collected under this subsection— (A) shall be in addition to annual appropriated funding provided for the operation and maintenance of recreation sites and facilities under the jurisdiction of the Secretary; and (B) shall not be used as a basis for reducing annual appropriated funding for such operation and maintenance. .”

    Also changed by S. 4367

  • Amends

    33 U.S.C. 2269

    Tribal partnership program

    No AI explanation of this change yet.

    The bill's instruction

    Section 203 of the Water Resources Development Act of 2000 (33 U.S.C. 2269) is amended— (1) in subsection (a), by striking “the term “Indian tribe” has the meaning given the term” and inserting “the terms “Indian tribe” and “Indian Tribe” have the meanings given the terms”; (2) in subsection (b)— (A) in paragraph (1)(B)— (i) by striking “or in proximity” and inserting “, in proximity”; and (ii) by inserting “, or in proximity to a river system or other aquatic habitat with respect to which an Indian Tribe has Tribal treaty rights” after “Alaska Native villages”; (B) in paragraph (2)(A), by striking “flood hurricane and storm damage reduction, including erosion control,” and inserting “flood or hurricane and storm damage reduction, including erosion control and stormwater management (including management of stormwater that flows at a rate of less than 800 cubic feet per second for the 10-percent flood),”; and (C) in paragraph (4), by striking “$26,000,000” each place it appears and inserting “$28,500,000”; and (3) by striking subsection (e).

    Also changed by S. 4367

  • Amends

    40 U.S.C. 9501

    Chief of Engineers

    No AI explanation of this change yet.

    The bill's instruction

    Section 8146(d) of the Water Resources Development Act of 2022 (40 U.S.C. 9501 note; 136 Stat. 3729) is amended— (1) in paragraph (1), by inserting “Water and Sewer Authority” after “District of Columbia”; and (2) in paragraph (3), by striking “Fairfax County” and inserting “the Fairfax County Water Authority”.

    Also changed by S. 4367

  • Amends

    Section 142 of the Water Resources Development Act of 1976

    Not in the US Code

    The bill's instruction

    Section 142 of the Water Resources Development Act of 1976 (90 Stat. 2930; 100 Stat. 4158) is amended— (1) by striking “The Secretary” and inserting “(a) The Secretary”; (2) by inserting “, Contra Costa,” before “and Solano”; and (3) by adding at the end the following: “ (b) Additional purposes In carrying out subsection (a), the Secretary shall— (1) include the ocean shorelines of each county; (2) with respect to the bay and ocean shorelines of each county— (A) investigate measures to adapt to rising sea levels; (B) consider the needs of economically disadvantaged communities within the study area, including identification of areas in which infrastructure for transportation, wastewater, housing, and other economic assets of such communities are most vulnerable to flood or shoreline risks; and (C) to the maximum extent practicable, consider the use of natural features or nature-based features and the beneficial use of dredged materials; and (3) with respect to the bay and ocean shorelines, and streams running to the bay and ocean shorelines, of each county, investigate the effects of proposed flood or shoreline protection, coastal storm risk reduction, environmental infrastructure, and other measures or improvements on— (A) the local economy, including recreation; (B) aquatic ecosystem restoration, enhancement, or expansion efforts or opportunities; (C) public infrastructure protection and improvement; (D) stormwater runoff capacity and control measures, including those that may mitigate flooding; (E) erosion of beaches and coasts; and (F) any other measures or improvements relevant to adapting to rising sea levels. .”
  • Amends

    33 U.S.C. 2232

    Construction of water resources development projects by non-Federal interests

    No AI explanation of this change yet.

    The bill's instruction

    Section 204 of the Water Resources Development Act of 1986 (33 U.S.C. 2232) is amended— (1) in subsection (c)(1)— (A) by striking “an appropriate non-Federal interest” and inserting “a non-Federal interest carrying out a project, or separable element of a project, under this section”; (B) by striking “on construction for any project” and inserting “for the construction of any project or separable element”; and (C) by inserting “, consistent with the authorized cost share for the project,” after “United States funds”; (2) in subsection (d)— (A) in paragraph (1)(A), by striking clauses (i) through (iii) and inserting the following: “ (i) the non-Federal interest— (I) enters into a written agreement with the Secretary under section 221 of the Flood Control Act of 1970 (42 U.S.C. 1962d–5b), including an agreement to pay the non-Federal share, if any, of the cost of operation and maintenance of the project; (II) makes any information relevant to carrying out the project available to the Secretary to review; and (III) identifies features of the project or separable element that are outside the scope of the authorized project; and (ii) the Secretary— (I) reviews the plans for construction by the non-Federal interest; (II) determines the project outputs are consistent with the authorized project and construction would not result in life safety concerns; (III) determines that the plans comply with applicable Federal laws and regulations; and (IV) verifies that the construction documents, including supporting information, have been signed by an Engineer of Record; and ;” (B) in paragraph (3)— (i) by redesignating subparagraphs (B) and (C) as subparagraphs (C) and (D), respectively; and (ii) by inserting after subparagraph (A) the following: “ (B) the non-Federal interest has obligated or expended funds for the cost of a discrete segment or separable element thereof and has requested reimbursement of the Federal share of the cost of the discrete segment or separable element; ; and” (iii) in subparagraph (C) (as so redesignated), by inserting “, discrete segment of the project, or separable element of the project,” after “the project”; (C) in paragraph (5)— (i) by striking subparagraph (A)(ii) and inserting the following: “ (ii) before the review and approval of plans under paragraph (1)(A)(ii), the Secretary makes the determinations required under subclauses (II) and (III) of paragraph (1)(A)(ii) with respect to the discrete segment. ; ” (ii) in subparagraph (B)(ii), by striking “plans approved under paragraph (1)(A)(i)” and inserting “the plans reviewed under paragraph (1)(A)(ii)”; (iii) in subparagraph (C)(i), by striking “paragraph (1)(A)(iii)” and inserting “paragraph (1)(A)(i)”; and (iv) in subparagraph (D)(i) by striking “paragraph (1)(A)(iii)” and inserting “paragraph (1)(A)(i)”; and (D) by adding at the end the following: “ (6) Exclusions The Secretary may not provide credit or reimbursement for— (A) activities required by the non-Federal interest to initiate design and construction that would otherwise not be required by the Secretary; or (B) delays incurred by the non-Federal interest resulting in project cost increases. ; and” (3) by adding at the end the following: “ (g) Authorization of appropriations There is authorized to be appropriated to the Secretary to carry out this section $1,000,000 for each fiscal year. .”

    Also changed by S. 4367

  • Amends

    33 U.S.C. 2345

    Electronic submission and tracking of permit applications

    No AI explanation of this change yet.

    The bill's instruction

    Section 2040(a) of the Water Resources Development Act of 2007 (33 U.S.C. 2345(a)) is amended— (1) in the subsection heading, by striking “Development of electronic” and inserting “Electronic”; (2) by amending paragraph (1) to read as follows: “ (1) In general The Secretary shall implement an electronic system to allow the electronic— (A) preparation and submission of applications for permits and requests for jurisdictional determinations under the jurisdiction of the Secretary; and (B) tracking of documents related to Federal environmental reviews for projects under the jurisdiction of the Secretary or for which the Corps of Engineers is designated as the lead Federal agency. ;” (3) in paragraph (2)— (A) in subparagraph (E), by striking “; and” and inserting a semicolon; (B) in subparagraph (F), by striking the period at the end and inserting “; and”; and (C) by adding at the end the following: “ (G) documents related to Federal environmental reviews for projects under the jurisdiction of the Secretary or for which the Corps of Engineers is designated as the lead Federal agency. ; and” (4) by adding at the end the following: “ (5) Coordination with other agencies To the maximum extent practicable, the Secretary shall use the electronic system required under paragraph (1) to enhance interagency coordination in the preparation of documents related to Federal environmental reviews. .” Section 2040(b) of the Water Resources Development Act of 2007 (33 U.S.C. 2345(b)) is amended— (1) in paragraph (4), by striking “; and” and inserting a semicolon; (2) in paragraph (5)(C), by striking the period at the end and inserting “; and”; and (3) by adding at the end the following: “ (6) enable a non-Federal interest for a project to— (A) submit information related to the preparation of any Federal environmental review document associated with the project; and (B) track the status of a Federal environmental review associated with the project. .” Section 2040(d) of the Water Resources Development Act of 2007 (33 U.S.C. 2345(d)) is amended— (1) in the subsection heading, by striking “Record of determinations” and inserting “Record retention”; (2) in paragraph (1), by inserting “, and all Federal environmental review documents included in the electronic system” before the period at the end; and (3) in paragraph (2), by inserting “and all Federal environmental review documents included in the electronic system,” before “after the 5-year”. Section 2040(e) of the Water Resources Development Act of 2007 (33 U.S.C. 2345(e)) is amended— (1) in the subsection heading, by striking “determinations” and inserting “records”; and (2) in paragraph (1), by inserting “, and all final Federal environmental review documents included in the electronic system,” before “available to the public”. Section 2040(f)(1) of the Water Resources Development Act of 2007 (33 U.S.C. 2345(f)(1)) is amended by striking “2 years after the date of enactment of the Water Resources Development Act of 2022” and inserting “1 year after the date of enactment of the Water Resources Development Act of 2024”. Section 2040(g) of the Water Resources Development Act of 2007 (33 U.S.C. 2345(g)) is amended by inserting “, and the requirements described in subsections (d) and (e) relating to Federal environmental documents shall apply with respect to Federal environmental review documents that are prepared after the date of enactment of the Water Resources Development Act of 2024” before the period at the end. Section 2040 of the Water Resources Development Act of 2007 (33 U.S.C. 2345) is amended by adding at the end the following: “ (i) Consistency with E-NEPA In carrying out this section, the Secretary shall take into consideration the results of the permitting portal study conducted pursuant to the amendment made by section 321(b) of the Fiscal Responsibility Act of 2023 (137 Stat. 44). .”
  • Amends

    33 U.S.C. 2282

    Feasibility reports

    Subsections (b)(2)(B), (b)(4)

    No AI explanation of this change yet.

    The bill's instruction

    Section 905(b)(2)(B) of the Water Resources Development Act of 1986 (33 U.S.C. 2282(b)(2)(B)) is amended by striking “$200,000” and inserting “$300,000”. Section 905(b)(4) of the Water Resources Development Act of 1986 (33 U.S.C. 2282(b)(4)) is amended by striking “(A) Timing.—” and all that follows through “The cost of” and inserting “The cost of”.

    Also changed by S. 4367

  • Amends

    33 U.S.C. 2282c

    Vertical integration and acceleration of studies

    Subsections (a)

    No AI explanation of this change yet.

    The bill's instruction

    Section 1001(a) of the Water Resources Reform and Development Act of 2014 (33 U.S.C. 2282c(a)) is amended— (1) in paragraph (1), by striking “of initiation” and inserting “on which the Secretary determines the Federal interest for purposes of the report pursuant to section 905(b) of the Water Resources Development Act of 1986 (33 U.S.C. 2282(b))”; and (2) in paragraph (2)— (A) by striking “cost of $3,000,000; and” and inserting the following: “ cost of— (A) $3,000,000 for a project with an estimated construction cost of less than $500,000,000; and ; and” (B) by adding at the end the following: “ (B) $5,000,000 for a project with an estimated construction cost of greater than or equal to $500,000,000; and .”

    Also changed by S. 4367

  • Amends

    Section 8154 of the Water Resources Development Act of 2022

    Not in the US Code

    Subsections (g)(1)

    The bill's instruction

    Section 8154(g)(1) of the Water Resources Development Act of 2022 (136 Stat. 3734) is amended by adding at the end the following: “ (F) Project for hurricane and storm damage risk reduction, Norfolk Coastal Storm Risk Management, Virginia, authorized by section 401(3) of the Water Resources Development Act of 2020 (134 Stat. 2738). .”
  • Amends

    33 U.S.C. 408

    Taking possession of, use of, or injury to harbor or river improvements

    No AI explanation of this change yet.

    The bill's instruction

    Section 14 of the Act of March 3, 1899 (33 U.S.C. 408) is amended— (1) by redesignating subsections (c) and (d) as subsections (d) and (e), respectively, and inserting after subsection (b) the following: “ (c) Review process (1) Consistency The Secretary shall establish a single office within the Corps of Engineers with the expertise to provide consistent and timely recommendations under subsection (a) for applications for permission submitted pursuant to such subsection. (2) Preapplication meeting At the request of a non-Federal entity that is planning on submitting an application for permission pursuant to subsection (a), the Secretary, acting through the office established under paragraph (1), shall meet with the non-Federal entity to— (A) provide clear, concise, and specific technical requirements for non-Federal entity to use in the development of the application; (B) recommend the number of design packages to submit for the proposed action, and the stage of development at which to submit such packages; and (C) identify potential concerns or conflicts with such proposed actions. (3) Contributed funds The Secretary may use funds accepted from a non-Federal entity under subsection (b)(3) for purposes of conducting a meeting described in paragraph (2). ; and” (2) in subsection (d), as so redesignated— (A) in paragraph (1), by striking “the Secretary shall inform” and inserting “the Secretary, acting through the head of the office established under subsection (c), shall inform”; and (B) in paragraph (2), in the matter preceding subparagraph (A), by striking “the Secretary shall” and inserting “the Secretary, acting through the head of the office established under subsection (c), shall”.

    Also changed by S. 4367

  • Amends

    33 U.S.C. 2283

    Fish and wildlife mitigation

    No AI explanation of this change yet.

    The bill's instruction

    Section 906 of the Water Resources Development Act of 1986 (33 U.S.C. 2283) is amended— (1) in subsection (d)— (A) in paragraph (1)— (i) by striking “After November 17, 1986, the Secretary” and inserting “The Secretary”; and (ii) by striking “shall not submit” and all that follows through “unless such report contains” and inserting “may not approve any proposal related to a water resources project unless the Secretary has prepared a report relating to the project that contains”; (B) in paragraph (2)— (i) by striking “The Secretary” and inserting the following: “ (A) In general The Secretary ; and” (ii) by adding at the end the following: “ (B) Identification The Secretary shall consult with the non-Federal interest for a water resources project, and other stakeholders, to the maximum extent practicable— (i) to identify mitigation implementation practices or accepted assessment methodologies used in the region of the water resources project and incorporate such practices and methodologies into the mitigation plan for such project; and (ii) to identify projects that have not been constructed, or concepts described in mitigation plans for other water resources projects, that may be used to meet the restoration or mitigation needs of the water resources project. ; and” (C) in paragraph (3)(B)(iv)(I), by inserting “or a description of the requirements for a third-party mitigation instrument that would be developed in the case that a contract for future delivery of credits will be used” after “to be used”; (2) in subsection (i)(1)(A)— (A) in clause (i), by inserting “, for immediate delivery or future delivery to be identified in the mitigation instrument” after “banks”; and (B) in clause (ii), by inserting “, for immediate delivery or future delivery to be identified in the mitigation instrument” after “programs”; and (3) by adding at the end the following: “ (l) Separable elements Mitigation of fish and wildlife losses required under this section that is provided in the form of credit shall be considered a separable element of a project without requiring further evaluation. (m) Transparency The Secretary shall ensure that— (1) the mitigation requirements for each water resources project— (A) are made publicly available (including on a website of the headquarters of the Corps of Engineers); and (B) include the location of the project, the anticipated schedule for mitigation, the type of mitigation required, the amount of mitigation required, and the remaining mitigation needs; (2) the mitigation plan for such project is made publicly available, as applicable; (3) the information described in paragraph (1) is updated regularly; and (4) carrying out the requirements of this subsection with respect to each water resources project is considered a project expense. (n) Coordination To the maximum extent practicable, the Secretary shall ensure that the project delivery team and regulatory team of the Corps of Engineers work in coordination to successfully carry out mitigation efforts. .”
  • Amends

    Section 8327 of the Water Resources Development Act of 2022

    Not in the US Code

    The bill's instruction

    Section 8327 of the Water Resources Development Act of 2022 (136 Sat. 3788) is amended— (1) in the section heading, by striking “Delaware”; and (2) in subsection (b)— (A) in the heading, by striking “Delaware”; (B) by striking “the State of Delaware” and inserting “the covered geographic area” each place it appears; and (C) in paragraph (7), by adding at the end the following: “ (C) Covered geographic area The term “covered geographic area” means— (i) the State of Delaware; (ii) Fire Island National Seashore, New York; and (iii) the hamlets of Massapequa Park, Massapequa, Amityville, Copiague, Lindenhurst, West Babylon, Babylon, West Islip, West Bay Shore, Brightwaters, Bay Shore, Islip, East Islip, Great River, Oakdale, West Sayville, Saville, Bayport, Blue Point, Patchogue, East Patchogue, Bellport, Brookhaven, Shirley, Mastic Beach, Mastic, Moriches, Center Moriches, East Moriches, and Eastport, New York. .”
  • Amends

    33 U.S.C. 2352

    Funding to process permits

    Subsections (a)

    No AI explanation of this change yet.

    The bill's instruction

    Section 214(a) of the Water Resources Development Act of 2000 (33 U.S.C. 2352(a)) is amended— (1) in paragraph (1), by adding at the end the following: “ (D) Indian Tribe The term “Indian Tribe” means— (i) an Indian Tribe, as such term is defined in section 4 of the Indian Self-Determination and Education Assistance Act (25 U.S.C. 5304); and (ii) any entity formed under the authority of one or more Indian Tribes, as so defined. ;” (2) in paragraph (2)— (A) by inserting “Indian Tribe,” after “public-utility company,” each place it appears; and (B) in subparagraph (A), by inserting “, including an aquatic ecosystem restoration project” before the period at the end; and (3) by striking paragraph (4).

    Also changed by S. 4367

  • Amends

    33 U.S.C. 2351b

    Federal breakwaters and jetties

    No AI explanation of this change yet.

    The bill's instruction

    Section 8101 of the Water Resources Development Act of 2022 (33 U.S.C. 2351b) is amended— (1) by inserting “, pile dike,” after “jetty” each place it appears; and (2) in subsection (b)(2)— (A) by striking “if” and all that follows through “the Secretary” and inserting “if the Secretary”; (B) by striking “breakwater; and” and inserting “breakwater and—” (C) by redesignating subparagraph (B) as subparagraph (A); (D) in subparagraph (A) (as so redesignated), by striking the period at the end and inserting “; or”; and (E) by adding at the end the following: “ (B) the pile dike has disconnected from an authorized navigation project as a result of a lack of such regular and routine Federal maintenance activity. .”

    Also changed by S. 4367

  • Amends

    33 U.S.C. 579d-2

    Deauthorization of inactive projects

    No AI explanation of this change yet.

    The bill's instruction

    Section 301 of the Water Resources Development Act of 2020 (33 U.S.C. 579d–2) is amended by striking subsections (a) through (c) and inserting the following: “ (a) Purposes The purposes of this section are— (1) to identify water resources development projects, and separable elements of projects, authorized by Congress that are no longer viable for construction due to— (A) a lack of local support; (B) a lack of available Federal or non-Federal resources; or (C) an authorizing purpose that is no longer relevant or feasible; (2) to create an expedited and definitive process for Congress to deauthorize water resources development projects and separable elements that are no longer viable for construction; and (3) to allow the continued authorization of water resources development projects and separable elements that are viable for construction. (b) Proposed deauthorization list (1) Preliminary list of projects (A) In general The Secretary shall develop a preliminary list of each water resources development project, or separable element of a project, authorized for construction before June 10, 2014, for which— (i) planning, design, or construction was not initiated before the date of enactment of the Water Resources Development Act of 2024; or (ii) planning, design, or construction was initiated before the date of enactment of the Water Resources Development Act of 2024, but for which no funds, Federal or non-Federal, were obligated for planning, design, or construction of the project or separable element of the project during the current fiscal year or any of the 10 preceding fiscal years. (B) Use of comprehensive construction backlog and operation and maintenance report The Secretary may develop the preliminary list from the comprehensive construction backlog and operation and maintenance reports developed pursuant to section 1001(b)(2) of the Water Resources Development Act of 1986 (33 U.S.C. 579a). (2) Preparation of proposed deauthorization list (A) Proposed list and estimated deauthorization amount The Secretary shall— (i) prepare a proposed list of projects for deauthorization comprised of a subset of projects and separable elements identified on the preliminary list developed under paragraph (1) that are projects or separable elements described in subsection (a)(1), as determined by the Secretary; and (ii) include with such proposed list an estimate, in the aggregate, of the Federal cost to complete such projects. (B) Determination of federal cost to complete For purposes of subparagraph (A), the Federal cost to complete shall take into account any allowances authorized by section 902 of the Water Resources Development Act of 1986 (33 U.S.C. 2280), as applied to the most recent project schedule and cost estimate. (3) Public comment and consultation (A) In general The Secretary shall solicit comments from the public and the Governors of each applicable State on the proposed deauthorization list prepared under paragraph (2)(A). (B) Comment period The public comment period shall be 90 days. (4) Preparation of final deauthorization list (A) In general The Secretary shall prepare a final deauthorization list by— (i) considering any comments received under paragraph (3); and (ii) revising the proposed deauthorization list prepared under paragraph (2)(A) as the Secretary determines necessary to respond to such comments. (B) Appendix The Secretary shall include as part of the final deauthorization list an appendix that— (i) identifies each project or separable element on the proposed deauthorization list that is not included on the final deauthorization list; and (ii) describes the reasons why the project or separable element is not included on the final deauthorization list. (c) Submission of final deauthorization list to congress for congressional review; publication (1) In general Not later than 90 days after the date of the close of the comment period under subsection (b)(3), the Secretary shall— (A) submit the final deauthorization list and appendix prepared under subsection (b)(4) to the Committee on Tr

    Also changed by S. 4367

  • Repeals

    26 U.S.C. 9505

    Harbor Maintenance Trust Fund

    No AI explanation of this change yet.

    The bill's instruction

    Section 330 of the Water Resources Development Act of 1992 (26 U.S.C. 9505 note) and the item related to such section in the table of contents for such Act, are repealed.

    Also changed by S. 4367

  • Repeals

    33 U.S.C. 2238

    Authorization of appropriations

    Subsections (e)(3)

    No AI explanation of this change yet.

    The bill's instruction

    Section 210(e)(3) of the Water Resources Development Act of 1986 (33 U.S.C. 2238(e)(3)) is repealed.

    Also changed by S. 4367

  • Amends

    33 U.S.C. 2238e

    Additional projects for underserved community harbors

    No AI explanation of this change yet.

    The bill's instruction

    Section 8132 of the Water Resources Development Act of 2022 (33 U.S.C. 2238e) is amended— (1) in subsection (c)— (A) in the matter preceding paragraph (1), by striking “section based on an assessment of” and all that follows through “the local or regional economic benefits of the project;” and inserting the following: “ section— (1) based on an assessment of— (A) the local or regional economic benefits of the project; ;” (B) by redesignating paragraphs (2) and (3) as subparagraphs (B) and (C), respectively (and by conforming the margins accordingly); (C) in subparagraph (C) (as so redesignated) by striking the period at the end and inserting “; and”; and (D) by adding at the end the following: “ (2) that are located— (A) in a harbor where passenger and freight service is provided to island communities dependent on that service; or (B) in a lake, or any related connecting channels, within the United States that is included in the Boundary Waters Treaty of 1909. ; ” (2) in subsection (g)(2), in the matter preceding subparagraph (A), by inserting “, or a marina or berthing area that is located adjacent to, or is accessible by, a Federal navigation project,” before “for which”; and (3) by adding at the end the following: “ (i) Projects for marina or berthing areas The Secretary may carry out not more than 10 projects under this section that are projects for an underserved community harbor that is a marina or berthing area described in subsection (g)(2). .”

    Also changed by S. 4367

  • Amends

    33 U.S.C. 2350

    Corrosion prevention

    Subsections (c)

    No AI explanation of this change yet.

    The bill's instruction

    Section 1033(c) of the Water Resources Reform and Development Act of 2014 (33 U.S.C. 2350(c)) is amended— (1) in paragraph (2), by striking “; and” and inserting a semicolon; (2) by redesignating paragraph (3) as paragraph (4); and (3) by inserting after paragraph (2) the following: “ (3) the carrying out of an activity described in paragraph (1) or (2) through a program in corrosion prevention that is— (A) offered or accredited by an organization that sets industry standards for corrosion mitigation and prevention; or (B) an industrial coatings applicator program that is— (i) an employment and training activity (as defined in section 3 of the Workforce Innovation and Opportunity Act (29 U.S.C. 3102)); or (ii) registered under the Act of August 16, 1937 (commonly known as the “National Apprenticeship Act”; 50 Stat. 664, chapter 663; 29 U.S.C. 50 et seq.); and .”

    Also changed by S. 4367

  • Amends

    33 U.S.C. 2242

    Remote and subsistence harbors

    No AI explanation of this change yet.

    The bill's instruction

    Section 2006 of the Water Resources Development Act of 2007 (33 U.S.C. 2242) is amended— (1) in subsection (a), by striking paragraphs (1) through (3) and inserting the following: “ (1) the project would be located in the State of Hawaii or Alaska, the Commonwealth of Puerto Rico, Guam, the Commonwealth of the Northern Mariana Islands, the United States Virgin Islands, or American Samoa; and (2) (A) over 80 percent of the goods transported through the harbor would be consumed within the United States, as determined by the Secretary, including consideration of information provided by the non-Federal interest; or (B) the long-term viability of the community in which the project is located, or the long-term viability of a community that is located in the region that is served by the project and that will rely on the project, would be threatened without the harbor and navigation improvement. ; and” (2) in subsection (b)— (A) in the matter preceding paragraph (1), by striking “benefits of the project to” and inserting “benefits of the project to any of”; and (B) in paragraph (4), by striking “; and” and inserting “; or”.

    Also changed by S. 4367

  • Amends

    Section 441 of the Water Resources Development Act of 1999

    Not in the US Code

    The bill's instruction

    Section 441 of the Water Resources Development Act of 1999 (113 Stat. 328) is amended— (1) in subsection (a), by striking “flood control,” and inserting “flood risk management, hurricane and storm damage risk reduction,”; (2) in subsection (b), by striking “the study” and inserting “any study under this section”; and (3) by striking subsection (c) and inserting the following: “ (c) Treatment of studies Any study carried out by the Secretary under this section after the date of enactment of the Water Resources Development Act of 2024 shall be treated as a continuation of the initial study carried out under this section. (d) Projects A project resulting from a study carried out under this section may be implemented pursuant to section 212. .”
  • Amends

    Section 8377 of the Water Resources Development Act of 2022

    Not in the US Code

    Subsections (e)(3)(B)

    The bill's instruction

    Section 8377(e)(3)(B) of the Water Resources Development Act of 2022 (136 Stat. 3825) is amended by striking “reserved an retained” and inserting “reserved and retained”.
  • Amends

    33 U.S.C. 2267a

    Watershed and river basin assessments

    No AI explanation of this change yet.

    The bill's instruction

    Section 729 of the Water Resources Development Act of 1986 (33 U.S.C. 2267a) is amended— (1) in subsection (d)— (A) in paragraph (12), by striking “; and” and inserting a semicolon; (B) in paragraph (13), by striking the period at the end and inserting a semicolon; and (C) by adding at the end the following: “ (14) Connecticut River Watershed, Connecticut, Massachusetts, New Hampshire, and Vermont; (15) Lower Rouge River Watershed, Michigan; and (16) Grand River Watershed, Michigan. ; and” (2) by adding at the end the following: “ (g) Feasibility report on project specific recommendations from assessments (1) In general At the request of a non-Federal interest for an assessment completed under this section, the Secretary is authorized to prepare a feasibility report, in accordance with the requirements of section 905, recommending the construction or modification of a water resources development project to address a water resources need of a river basin or watershed of the United States identified in the assessment. (2) Priority watersheds In carrying out this subsection, the Secretary shall give priority to— (A) the watersheds of the island of Maui, Hawaii, including the Wahikuli, Honokōwai, Kahana, Honokahua, and Honolua watersheds, including the coral reef habitat north of Lahaina off the northwestern coast of the island of Maui; and (B) the watersheds of the Northern Mariana Islands, American Samoa, and Guam. .”

    Also changed by S. 4367

  • Amends

    33 U.S.C. 3302

    Committee on Levee Safety

    No AI explanation of this change yet.

    The bill's instruction

    Section 9003 of the Water Resources Development Act of 2007 (33 U.S.C. 3302) is amended to read as follows: “ 9003. Levee Owners Board (a) Establishment of Owners Board There is hereby established a Levee Owners Board (hereinafter in this section referred to as the “Owners Board”) composed of the eleven members appointed by the Secretary. The members shall be appointed so as to represent various regions of the country, including at least one Federal levee system owner-operator from each of the eight civil works divisions of the U.S. Army Corps of Engineers. The Secretary of the Army shall designate, and the Administrator of FEMA may designate, a representative to act as an observer of the Owners Board. (1) Terms of members (A) In general A member of the Owners Board shall be appointed for a period of 3 years. (B) Reappointment A member of the Owners Board may be reappointed to the Owners Board, as the Secretary determines to be appropriate. (C) Vacancies A vacancy on the Owners Board shall be filled in the same manner as the original appointment was made. (2) Chairperson (A) In general The members of the Owners Board shall appoint a chairperson from among the members of the Owners Board. (b) Duties of the Owners Board (1) In general The Owners Board shall meet not less frequently than semiannually to develop and make recommendations to the Secretary and Congress regarding levee system reliability throughout the United States. (2) Advice and recommendations The Owners Board shall provide— (A) prior to the development of the budget proposal of the President for a given fiscal year, advice and recommendations to the Secretary regarding overall levee system reliability; (B) advice and recommendations to Congress regarding any feasibility report for a flood risk management project that has been submitted to Congress; (C) not later than 60 days after the date of the submission of the budget proposal of the President to Congress, advice and recommendations to Congress regarding flood risk management project construction and rehabilitation priorities and corresponding spending levels; (D) advice and recommendations to the Secretary and the Congress regarding effectiveness of the U.S. Army Corps of Engineers levee safety program, including comments and recommendations on the budgets and expenditures as described in subsection (c)(2); and (E) advice and recommendations to the Secretary, the Congress, and the Administrator regarding effectiveness of the levee safety initiative established by section 9005, including comments and recommendations on the budgets and expenditures described in subsection (c)(2). (3) Independent judgment Any advice or recommendations made by the Owners Board shall reflect the independent judgment of the Owners Board. (c) Duties of the Secretary The Secretary shall— (1) designate an Executive Secretary who shall assist the Chairman in administering the Owners Board and ensuring that the Owners Board operates in accordance with chapter 10 of title 5, United States Code; (2) provide to the Owners Board such detailed reports of Corps activities and expenditures related to flood risk management and levees, including for the Corps levee safety program and the levee safety initiative, not less frequently than semiannually; and (3) submit to the Owners Board a courtesy copy of any completed feasibility report for a flood risk management project submitted to Congress. (d) Administration (1) In general The Owners Board shall be subject to chapter 10 of title 5, other than section 1013, and with the consent of the appropriate agency head, the Owners Board may use the facilities and services of any Federal agency. (2) Members not considered special Government employees For the purposes of complying with chapter 10 of title 5, United States Code, the members of the Owners Board shall not be considered special Government employees (as defined in section 202 of title 18, United States Code). (3) Travel expense Non-Federal members of the Owners Board while engaged in the performance of their duties away from th
  • Amends

    33 U.S.C. 534

    Conveyance of right, title, and interest of United States in bridges transferred to States or political subdivisions; terms and conditions

    No AI explanation of this change yet.

    The bill's instruction

    Section 109 of the River and Harbor Act of 1950 (33 U.S.C. 534) is amended— (1) by striking “That the Secretary of the Army” and inserting the following: “ (a) In general The Secretary of the Army ;” (2) by striking “with or without consideration” and all that follows through the period at the end and inserting the following: “ with or without consideration if, prior to any transfer or conveyance of a bridge, the Secretary and the State authority, or political subdivision thereof, execute an agreement containing the following terms and conditions: (1) The State authority, or political subdivision thereof, shall assume responsibility for the operation, maintenance, repair, replacement, and rehabilitation of the bridge, including the preservation, protection, inspection and evaluation of, and future construction on, the bridge. (2) Operation of the bridge shall be consistent with the purposes of, and may not constrain or change, the operation and maintenance of the water resources development project in connection to which the bridge was constructed or acquired. (3) The State authority, or political subdivision thereof, shall hold the United States harmless from any liability with respect to the operation, maintenance, repair, replacement, and rehabilitation of the bridge, including preservation, protection, inspection and evaluation of, and future construction on, the bridge. (4) Any additional terms or conditions that the Secretary considers appropriate to protect the interests of the United States. ; and” (3) by adding at the end the following: “ (b) Funds The Secretary may transfer to the State authority, or political subdivision thereof, to which a bridge is transferred or conveyed under this section any funds made available to the Secretary for necessary replacement or rehabilitation of the bridge. .”
  • Amends

    Section 8159 of the Water Resources Development Act of 2022

    Not in the US Code

    The bill's instruction

    Section 8159 of the Water Resources Development Act of 2022 (136 Stat. 3740) is amended— (1) in paragraph (3), by striking “; and” and inserting a semicolon; (2) in paragraph (4), by striking the period at the end and inserting a semicolon; and (3) by adding at the end the following: “ (5) Western Washington University, Bellingham to conduct academic research on water quality, aquatic ecosystem restoration (including aquaculture), and the resiliency of water resources development projects in the Pacific Northwest to natural disasters; (6) the University of North Carolina Wilmington to conduct academic research on flood mitigation, coastal resiliency, water resource ecology, water quality, aquatic ecosystem restoration (including aquaculture), coastal restoration, and resource-related emergency management in North Carolina and Mid-Atlantic region; and (7) California State Polytechnic University, Pomona to conduct academic research on integrated design and management of water resources development projects, including for the purposes of flood risk management, ecosystem restoration, water supply, water conservation, and sustainable aquifer management. .”
  • Amends

    Section 8109 of the Water Resources Development Act of 2022

    Not in the US Code

    The bill's instruction

    Section 8109 of the Water Resources Development Act of 2022 (136 Stat. 3702) is amended by inserting “or that incorporate the use of forecast-informed reservoir operations into such manuals” before the period at the end.
  • Amends

    33 U.S.C. 2328

    Challenge cost-sharing program for management of recreation facilities

    No AI explanation of this change yet.

    The bill's instruction

    Section 225 of the Water Resources Development Act of 1992 (33 U.S.C. 2328) is amended— (1) in subsection (b)— (A) by striking “To implement” and inserting the following: “ (1) In general To implement .” (B) in paragraph (1) (as so designated), by striking “non-Federal public and private entities” and inserting “non-Federal public entities and private nonprofit entities”; and (C) by adding at the end the following: “ (2) Requirements Before entering into an agreement under paragraph (1), the Secretary shall ensure that the non-Federal public entity or private nonprofit entity has the authority and capability— (A) to carry out the terms of the agreement; and (B) to pay damages, if necessary, in the event of a failure to perform. ;” (2) by striking subsection (c) and inserting the following: “ (c) User fees (1) Collection of fees (A) In general The Secretary may allow a non-Federal public entity or private nonprofit entity that has entered into an agreement pursuant to subsection (b) to collect user fees for the use of developed recreation sites and facilities, whether developed or constructed by the non-Federal public entity or private nonprofit entity or the Department of the Army. (B) Use of visitor reservation services (i) In general A non-Federal public entity or a private nonprofit entity described in subparagraph (A) may use, to manage fee collections and reservations under this section, any visitor reservation service that the Secretary has provided for by contract or interagency agreement, subject to such terms and conditions as the Secretary determines to be appropriate. (ii) Transfer The Secretary may transfer, or cause to be transferred by another Federal agency, to a non-Federal public entity or a private nonprofit entity described in subparagraph (A) user fees received by the Secretary or other Federal agency under a visitor reservation service described in clause (i) for recreation facilities and natural resources managed by the non-Federal public entity or private nonprofit entity pursuant to a cooperative agreement entered into under subsection (b). (2) Use of fees (A) In general A non-Federal public entity or private nonprofit entity that collects a user fee under paragraph (1)— (i) may retain up to 100 percent of the fees collected, as determined by the Secretary; and (ii) notwithstanding section 210(b)(4) of the Flood Control Act of 1968 (16 U.S.C. 460d–3(b)(4)), shall use any retained amounts for operation, maintenance, and management activities relating to recreation and natural resources at recreation site at which the fee is collected. (B) Requirements The use by a non-Federal public entity or private nonprofit entity of user fees collected under paragraph (1)— (i) shall remain subject to the direction and oversight of the Secretary; and (ii) shall not affect any existing third-party property interest, lease, or agreement with the Secretary. (3) Terms and conditions The authority of a non-Federal public entity or private nonprofit entity under this subsection shall be subject to such terms and conditions as the Secretary determines to be necessary to protect the interests of the United States. ; and” (3) in subsection (d)— (A) by striking “For purposes” and inserting the following: “ (1) In general For purposes ; and” (B) by striking “non-Federal public and private entities. Any funds received by the Secretary under this section” and inserting the following: “ non-Federal public entities, private nonprofit entities, and other private entities. (2) Deposit of funds Any funds received by the Secretary under this subsection ; and” (4) by adding at the end the following: “ (e) Definitions In this section: (1) Non-Federal public entity The term non-Federal public entity means a non-Federal public entity as defined in the memorandum issued by the Corp of Engineers on April 4, 2018, and titled “Implementation Guidance for Section 1155, Management of Recreation Facilities, of the Water Resources Development Act (WRDA) of 2016, Public Law 114–322”

    Also changed by S. 4367

  • Amends

    Section 111 of the Energy and Water Development and Related Agencies Appropriations Act, 2009

    Not in the US Code

    The bill's instruction

    Section 111 of the Energy and Water Development and Related Agencies Appropriations Act, 2009 (123 Stat. 607) is amended by striking “$7,000,000” and inserting “$65,000,000”.
  • Amends

    Section 8201 of the Water Resources Development Act of 2022

    Not in the US Code

    Subsections (b)(4)

    The bill's instruction

    Section 8201(b)(4) of the Water Resources Development Act of 2022 (136 Stat. 3750) is amended by striking “, without evaluation of additional deepening” and inserting “, including evaluation of additional deepening”.
  • Amends

    33 U.S.C. 2231

    Study of water resources development projects by non-Federal interests

    No AI explanation of this change yet.

    The bill's instruction

    Section 203 of the Water Resources Development Act of 1986 (33 U.S.C. 2231) is amended— (1) in subsection (a)— (A) in paragraph (1)— (i) by striking “may undertake a federally authorized feasibility study of a proposed water resources development project, or,” and inserting the following: “ may undertake and submit to the Secretary— (A) a federally authorized feasibility study of a proposed water resources development project; or ;” (ii) by striking “upon the written approval” and inserting the following: “ (B) upon the determination ;” (iii) in subparagraph (B) (as so designated)— (I) by striking “undertake”; and (II) by striking “, and submit the study to the Secretary” and inserting “or constructed by a non-Federal interest pursuant to section 204”; (B) in paragraph (2)— (i) in the matter preceding subparagraph (A)— (I) by striking “, as soon as practicable,”; and (II) by striking “non-Federal interests to” and inserting “non-Federal interests that”; (ii) by striking subparagraph (A) and inserting the following: “ (A) provide clear, concise, and transparent guidance for the non-Federal interest to use in developing a feasibility study that complies with requirements that would apply to a feasibility study undertaken by the Secretary; ;” (iii) in subparagraph (B), by striking the period at the end and inserting a semicolon; and (iv) by adding at the end the following: “ (C) provide guidance to a non-Federal interest on obtaining support from the Secretary to complete elements of a feasibility study that may be considered inherently governmental and required to be done by a Federal agency; and (D) provide contacts for employees of the Corps of Engineers that a non-Federal interest may use to initiate coordination with the Secretary and identify at what stages coordination may be beneficial. ; and” (C) by adding at the end the following: “ (3) Determination If a non-Federal interest requests to undertake a feasibility study on a modification to a constructed water resources development project under paragraph (1)(B), the Secretary shall expeditiously provide to the non-Federal interest the determination required under such paragraph with respect to whether conceptual modifications, as presented by the non-Federal interest, are consistent with the authorized purposes of the project. ;” (2) in subsection (b)— (A) in paragraph (3)— (i) in subparagraph (B), by striking “receives a request under this paragraph” and inserting “receives a study submission under subsection (a) or receives a request under subparagraph (A)”; and (ii) by adding at the end the following: “ (C) Additional information required The Secretary shall notify a non-Federal interest if, upon initial review of a submission received under subsection (a) or a receipt of a request under subparagraph (A), the Secretary requires additional information to perform the required analyses, reviews, and compliance processes and include in such notification a detailed description of the required information. ;” (B) by striking paragraph (4) and inserting the following: “ (4) Notification Upon receipt of a study submission under subsection (a) or receipt of a request under paragraph (3)(A), the Secretary shall notify the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate of the submission or request and a timeline for completion of the required analyses, reviews, and compliance processes and shall notify the non-Federal interest of such timeline. ; and” (C) in paragraph (5), by striking “receiving a request under paragraph (3)” and inserting “receiving a study submission under subsection (a) or a request under paragraph (3)(A)”; (3) in subsection (d)— (A) by striking “If a project” and inserting the following: “ (1) In general If a project ;” (B) by inserting “or modification to the project” before “an amount equal to”; and (C) by adding at the end the following: “ (2)

    Also changed by S. 4367

  • Amends

    Section 8215 of the Water Resources Development Act of 2022

    Not in the US Code

    Subsections (b)

    The bill's instruction

    Section 8215(b) of the Water Resources Development Act of 2022 is amended by adding at the end the following: “ (6) Federal share The Federal share of the cost of carrying out paragraph (1) shall be 100 percent. .”
  • Amends

    16 U.S.C. 3957

    Environmental banks

    Subsections (e)

    No AI explanation of this change yet.

    The bill's instruction

    Section 309(e) of the Coastal Wetlands Planning, Protection and Restoration Act (16 U.S.C. 3957(e)) is amended by striking “12” and inserting “14”.

    Also changed by S. 4367

  • Amends

    16 U.S.C. 4701

    Findings and purposes

    No AI explanation of this change yet.

    The bill's instruction

    Section 507(c) of the Water Resources Development Act of 2020 (16 U.S.C. 4701 note) is amended by striking “2028” and inserting “2030”.

    Also changed by S. 4367

  • Amends

    33 U.S.C. 2223

    Transfer of excess credit

    No AI explanation of this change yet.

    The bill's instruction

    Section 1020 of the Water Resources Reform and Development Act of 2014 (33 U.S.C. 2223) is amended by striking “2028” and inserting “2033” each place it appears.

    Also changed by S. 4367

  • Amends

    33 U.S.C. 3303a

    Levee safety initiative

    No AI explanation of this change yet.

    The bill's instruction

    Section 9005(g)(2)(E)(i) of the Water Resources Development Act of 2007 (33 U.S.C. 3303a(g)(2)(E)(i)) is amended by striking “2028” and inserting “2033”. Section 3017(e) of the Water Resources Reform and Development Act of 2014 (33 U.S.C. 3303a note) is amended by striking “2028” and inserting “2033”.

    Also changed by S. 4367

  • Amends

    Section 529 of the Water Resources Development Act of 2000

    Not in the US Code

    Subsections (b)(3)

    The bill's instruction

    Section 529(b)(3) of the Water Resources Development Act of 2000 (114 Stat. 2658; 119 Stat. 2255; 125 Stat. 865; 136 Stat. 4631) is amended by striking “$40,000,000” and inserting “$60,000,000”.
  • Amends

    33 U.S.C. 2343

    Independent peer review

    No AI explanation of this change yet.

    The bill's instruction

    Section 2034 of the Water Resources Development Act of 2007 (33 U.S.C. 2343) is amended— (1) in subsection (d)(2)— (A) by striking “assess the adequacy and acceptability of the economic” and insert the following: “ assess the adequacy and acceptability of— (A) the economic ;” (B) in subparagraph (A), as so redesignated, by adding “and” at the end; and (C) by adding at the end the following: “ (B) the consideration of nonstructural alternatives under section 73(a) of the Water Resources Development Act of 1974 (33 U.S.C. 701b–11(a)) for projects for flood risk management; ; ” (2) by striking subsection (h); and (3) by redesignating subsections (i) through (l) as subsections (h) through (k), respectively.

    Also changed by S. 4367

  • Amends

    Section 602 of the Water Resources Development Act of 1986

    Not in the US Code

    Subsections (a)

    The bill's instruction

    Section 602(a) of the Water Resources Development Act of 1986 (100 Stat. 4148; 104 Stat. 4646; 110 Stat. 3758; 118 Stat. 295; 121 Stat. 1076; 134 Stat. 2703; 136 Stat. 3778) is amended— (1) in paragraph (33), by striking “and” at the end; (2) in paragraph (34) by striking the period at the end and inserting a semicolon; and (3) by adding at the end the following: “ (35) East Lake Tohopekaliga, Florida; (36) Dillon Lake, Ohio; (37) Hillcrest Pond, Pennsylvania; (38) Falcon Lake, Zapata County, Texas; and (39) Lake Casa Blanca, Webb County, Texas. .”
  • Amends

    33 U.S.C. 652

    Upper Mississippi River Management

    Subsections (e)(4)

    No AI explanation of this change yet.

    The bill's instruction

    Section 1103(e)(4) of the Water Resources Development Act of 1986 (33 U.S.C. 652(e)(4)) is amended by striking “$15,000,000 for fiscal year 1999 and each fiscal year thereafter” and inserting “$15,000,000 for fiscal year 2024 and $20,000,000 for each fiscal year thereafter”.

    Also changed by S. 4367

  • Amends

    Section 1001 of the Water Resources Development Act of 2007

    Not in the US Code

    Subsections (24)

    The bill's instruction

    Section 1001(24) of the Water Resources Development Act of 2007 (121 Stat. 1053) is amended by adding at the end the following: “ (C) Credit The Secretary shall credit toward the non-Federal share of the cost of the project described in subparagraph (A) the cost of work carried out by the non-Federal interest for interim flood protection after March 31, 1989, if the Secretary determines that the work— (i) is integral to the project; (ii) complies with all applicable Federal laws, regulations, and policies that were in place at the time the work was completed; and (iii) notwithstanding the date described in this subparagraph, is otherwise in compliance with the requirements of section 221 of the Flood Control Act of 1970 (42 U.S.C. 1962d-5b). .”
  • Amends

    33 U.S.C. 2326

    Regional sediment management

    No AI explanation of this change yet.

    The bill's instruction

    Section 1122 of the Water Resources Development Act of 2016 (33 U.S.C. 2326 note) is amended— (1) in subsection (a)— (A) by striking “Not later than 90 days after the date of enactment of this Act, the Secretary shall establish a pilot program” and inserting “The Secretary is authorized”; and (B) by striking paragraph (1) and inserting the following: “ (1) promoting resiliency and reducing the risk to property and infrastructure of flooding and storm damage; ;” (2) in subsection (b)— (A) in the matter preceding paragraph (1), by striking “the pilot program” and inserting “this section”; (B) by striking paragraph (1) and inserting the following: “ (1) identify and carry out projects for the beneficial use of dredged material; ;” (3) in subsection (c)(1)— (A) by striking “In carrying out the pilot program, the” and inserting “The”; and (B) by striking “under the pilot program” and inserting “under this section”; (4) in subsection (d), in the matter preceding paragraph (1), by striking “the pilot program” and inserting “this section”; (5) in subsection (f)— (A) in paragraph (1), by striking “the pilot program” and inserting “this section”; and (B) in paragraph (4), by striking “the pilot program” and inserting “the implementation of this section”; and (6) by striking subsection (g) and redesignating subsection (h) as subsection (g). Section 204 of the Water Resources Development Act of 1992 (33 U.S.C. 2326) is amended— (1) in subsection (a)(1), by striking “rehabilitation of projects” and inserting “rehabilitation of projects, including projects for the beneficial use of dredged materials described in section 1122 of the Water Resources Development Act of 2016 (33 U.S.C. 2326 note),”; and (2) in subsection (f), by adding at the end the following: “ (12) Osceola County, Florida. .”

    Also changed by S. 4367

  • Amends

    33 U.S.C. 2326g

    Beneficial use of dredged material; dredged material management plans

    No AI explanation of this change yet.

    The bill's instruction

    Section 125(a)(1) of the Water Resources Development Act of 2020 (33 U.S.C. 2326g) is amended— (1) by striking “It is the policy” and inserting the following: “ (A) Policy It is the policy ; and” (2) by adding at the end the following: “ (B) National goal To the greatest extent practicable, the Secretary shall ensure that not less than 70 percent by tonnage of suitable dredged material obtained from the construction or operation and maintenance of water resources development projects is used beneficially. .”

    Also changed by S. 4367

  • Amends

    Section 1113 of the Water Resources Development Act of 1986

    Not in the US Code

    The bill's instruction

    Section 1113 of the Water Resources Development Act of 1986 (100 Stat. 4232; 110 Stat. 3719, 136 Stat. 3781) is amended— (1) in subsection (d)— (A) by striking “The non-Federal” and inserting the following: “ (1) In general The non-Federal ; and” (B) by adding at the end the following: “ (2) Reconnaissance study Notwithstanding paragraph (1), the Federal share of a reconnaissance study carried out by the Secretary under this section shall be 100 percent. ; and” (2) in subsection (e), by striking “$80,000,000” and inserting “$90,000,000”.
  • Amends

    33 U.S.C. 2211

    Harbors

    Subsections (a)(1), (b)(1)

    No AI explanation of this change yet.

    The bill's instruction

    Section 101(a)(1) of the Water Resources Development Act of 1986 (33 U.S.C. 2211(a)(1)) is amended by striking “50 feet” each place it appears and inserting “55 feet”. Section 101(b)(1) of the Water Resources Development Act of 1986 (33 U.S.C. 2211(b)(1)) is amended by striking “50 feet” and inserting “55 feet”.

    Also changed by S. 4367

  • Amends

    Section 1319 of the Water Resources Development Act of 2016

    Not in the US Code

    Subsections (c)

    The bill's instruction

    Section 1319(c) of the Water Resources Development Act of 2016 (130 Stat. 1703; 136 Stat. 3792) is amended— (1) by amending paragraph (1) to read as follows: “ (1) In general Notwithstanding any other provision of law, the Project is modified to include— (A) full repair of the New Savannah Bluff Lock and Dam structure; (B) modification of the structure such that the structure is able to maintain a stable pool with the same daily average elevation as is achieved by the existing structure, as measured at both the United States Geological Survey Gage 02196999, located at the New Savannah Bluff Lock and Dam, and the United States Geological Survey Gage 02196670, located in the vicinity of the Fifth Street Bridge, Augusta, Georgia, which at the New Savannah Bluff Lock and Dam is between 114.5 and 115 feet National Geodetic Vertical Datum of 1929 (NGVD29); (C) construction of a fish passage structure as recommended in the report of the Chief of Engineers for the Project, dated August 17, 2012, or such other Project feature that appropriately mitigates impacts to fish habitat caused by the Project without removing the dam; and (D) conveyance by the Secretary to Augusta-Richmond County, Georgia, of the park and recreation area adjacent to the New Savannah Bluff Lock and Dam, without consideration. ;” (2) in paragraph (2), by adding at the end the following: “ (C) Ceiling The costs of construction to be paid by the Georgia Ports Authority as a non-Federal interest for the Project for the modifications authorized under paragraph (1) shall not exceed the costs that would be paid by such non-Federal interest for construction of the fish passage structure recommended in the report of the Chief of Engineers for the Project, dated August 17, 2012. ; and” (3) in paragraph (3), by striking “the cost sharing of the Project as provided by law” and inserting “the cost sharing of the fish passage structure as recommended in the report of the Chief of Engineers for the Project, dated August 17, 2012”.
  • Amends

    33 U.S.C. 2201

    “Secretary” defined

    No AI explanation of this change yet.

    The bill's instruction

    Section 165(a) of the Water Resources Development Act of 2020 (33 U.S.C. 2201 note) is amended— (1) by striking the subsection heading and inserting “Community revitalization program”; (2) in paragraph (1), by striking “pilot program” and inserting “program”; (3) in paragraph (2)— (A) by amending subparagraph (A) to read as follows: “ (A) solicit project proposals from non-Federal interests by posting program information on a public-facing website and reaching out to non-Federal interests that have previously submitted project requests to the Secretary; and ; and” (B) in subparagraph (B), by striking “a total of 20 projects” and inserting “projects”; (4) by striking paragraph (4) and inserting the following: “ (4) Priority projects In carrying out this subsection, the Secretary shall prioritize the following projects: (A) Projects located in coastal communities in western Alaska impacted by Typhoon Merbok. (B) The Hatch Dam project, Arizona, carried out pursuant to section 205 of the Flood Control Act of 1948 (33 U.S.C. 701s). (C) Projects located in Guam. ; and” (5) by adding at the end the following: “ (6) Authorization of appropriations There is authorized to be appropriated to carry out this subsection $50,000,000 for each fiscal year. .” Section 1043(b) of the Water Resources Reform and Development Act of 2014 (33 U.S.C. 2201 note) is amended by striking “2026” each place it appears and inserting “2030”. Section 118 of the Water Resources Development Act of 2020 (33 U.S.C. 2201 note) is amended— (1) in subsection (e), by striking “5 years and 10 years” and inserting “5 years, 10 years, and 15 years”; (2) in subsection (g), by striking “10 years” and inserting “15 years”; and (3) by adding at the end the following: “ (h) Priority projects In carrying out this section, the Secretary shall prioritize the following projects: (1) The project for flood risk management, city of Rialto, California, authorized by section 201 of the Water Resources Development Act of 2024. (2) The project for ecosystem restoration and recreation, Santa Ana River, Jurupa Valley, California, authorized by section 201 of the Water Resources Development Act of 2024. (3) The project for flood control and other purposes, Kentucky River and its tributaries, Kentucky, authorized by section 6 of the Act of August 11, 1939 (chapter 699, 53 Stat. 1416). (4) The project for flood risk management, Kentucky River, Kentucky, authorized by section 8201(a)(31) of the Water Resources Development Act of 2022 (136 Stat. 3746). (5) The project for navigation, Hagaman Chute, Lake Providence, Louisiana, authorized by section 201 of the Water Resources Development Act of 2024. (6) The project for flood risk management, Otero County, New Mexico, authorized by section 201 of the Water Resources Development Act of 2024. (7) The project for flood control and other purposes, Susquehanna River Basin, Williamsport, Pennsylvania, authorized by section 5 of the Act of June 22, 1936 (chapter 688, 49 Stat. 1573). (8) The project for flood risk management and ecosystem restoration, Winooski River basin, Vermont, authorized by section 201 of the Water Resources Development Act of 2024. (9) The project for flood risk management and sediment management, Grays River, Wahkiakum County, Washington, authorized by section 201 of the Water Resources Development Act of 2024. .”

    Also changed by S. 4367

  • Amends

    33 U.S.C. 2309a

    Project modifications for improvement of environment or drought resiliency

    No AI explanation of this change yet.

    The bill's instruction

    Section 1135 of the Water Resources Development Act of 1986 (33 U.S.C. 2309a) is amended— (1) in the section heading, by inserting “or drought resiliency” after “environment”; (2) in subsection (a)— (A) by striking “for the purpose of improving” and inserting the following: “ for the purpose of— (1) improving ;” (B) in paragraph (1) (as so designated), by striking the period at the end and inserting “; or”; and (C) by adding at the end the following: “ (2) providing drought resiliency. ;” (3) in subsection (b), by striking “(2) will improve” and inserting “(2) will provide for drought resilience or will improve”; (4) in subsection (d), by striking “$10,000,000” and inserting “$12,500,000”; (5) in subsection (h), by striking “$50,000,000” and inserting “$62,000,000”; and (6) by adding at the end the following: “ (j) Drought resilience Drought resilience measures carried out under this section may include— (1) water conservation measures to mitigate and address drought conditions; (2) removal of sediment captured behind a dam for the purpose of restoring or increasing the authorized storage capacity of the project concerned; (3) the planting of native plant species that will reduce the risk of drought and the incidence of nonnative species; and (4) other actions that increase drought resilience, water conservation, or water availability. .”

    Also changed by S. 4367

  • Amends

    33 U.S.C. 2330

    Aquatic ecosystem restoration

    No AI explanation of this change yet.

    The bill's instruction

    Section 206 of the Water Resources Development Act of 1996 (33 U.S.C. 2330) is amended— (1) in subsection (b), by adding at the end the following: “ (3) Anadromous fish Notwithstanding paragraph (1), for projects carried out under subsection (a)(3), the non-Federal interest shall provide 15 percent of the cost of construction, including provision of all lands, easements, rights-of-way, and necessary relocations. ; and” (2) in subsection (d), by striking “$10,000,000” and inserting “$15,000,000”.

    Also changed by S. 4367

  • Amends

    33 U.S.C. 426g

    Storm and hurricane restoration and impact minimization program

    Subsections (c)

    No AI explanation of this change yet.

    The bill's instruction

    Section 3(c) of the Act of August 13, 1946 (33 U.S.C. 426g(c)) is amended— (1) in paragraph (1), by striking “$37,500,000” and inserting “$62,500,000”; and (2) in paragraph (2)(B), by striking “$10,000,000” and inserting “$12,500,000”.

    Also changed by S. 4367

  • Amends

    33 U.S.C. 577

    Small river and harbor improvement projects

    Subsections (b)

    No AI explanation of this change yet.

    The bill's instruction

    Section 107(b) of the River and Harbor Act of 1960 (33 U.S.C. 577(b)) is amended by striking “$10,000,000” and inserting “$12,500,000”.

    Also changed by S. 4367

  • Amends

    33 U.S.C. 701g

    Removal of obstructions; clearing channels

    No AI explanation of this change yet.

    The bill's instruction

    Section 2 of the Act of August 28, 1937 (33 U.S.C. 701g) is amended by striking “$500,000” and inserting “$1,000,000”.

    Also changed by S. 4367

  • Amends

    33 U.S.C. 701r

    Protection of highways, bridge approaches, lighthouses, public works, and nonprofit public services

    No AI explanation of this change yet.

    The bill's instruction

    Section 14 of the Flood Control Act of 1946 (33 U.S.C. 701r) is amended by striking “$25,000,000” and inserting “$50,000,000”.

    Also changed by S. 4367

  • Amends

    33 U.S.C. 701s

    Small flood control projects; appropriations; amount limitation for single locality; conditions

    No AI explanation of this change yet.

    The bill's instruction

    Section 205 of the Flood Control Act of 1948 (33 U.S.C. 701s) is amended to read as follows: “ 205. Small flood control projects (a) In general The Secretary shall carry out a program for the implementation, in partnership with non-Federal interests, of small structural or nonstructural projects for flood risk management, stormwater management, and related purposes not specifically authorized by Congress when in the opinion of the Chief of Engineers such work is advisable. (b) Cost share (1) Flood risk management and stormwater purposes (A) Non-Federal share The non-Federal share for a project implemented under this section of the costs assigned to purposes described in subsection (a) shall be 35 percent. (B) Requirement The non-Federal interest for a project implemented under this section shall pay 5 percent of the costs assigned to purposes described in subsection (a) during construction of the project. (2) Other purposes The non-Federal share for a project implemented under this section of the costs assigned to purposes not described in subsection (a) shall be consistent with the cost share requirements of section 103 of the Water Resources Development Act of 1986 (33 U.S.C. 2213). (3) Lands The non-Federal interest for a project implemented under this section shall provide all lands, easements, rights-of-way, dredged material disposal areas, and perform all related necessary relocations. (c) Agreements Construction of a project under this section shall be initiated only after a non-Federal interest has entered into an agreement with the Secretary to pay— (1) the non-Federal share of the costs of construction required by this section; and (2) 100 percent of any operation, maintenance, replacement, and rehabilitation costs associated with the project in accordance with regulations prescribed by the Secretary. (d) Completeness A project implemented under this section shall be complete in itself and shall not commit the United States to any additional improvement for the successful operation of the project. (e) Flexibility in project design and implementation The Secretary is authorized to, in coordination with the non-Federal interest for a project implemented under this section, incorporate natural features and nature-based features, water reuse and recycling practices, and other innovative stormwater management practices and techniques, including green infrastructure, permeable pavements, rain gardens, and retention basins into the project. (f) Consideration In implementing a project under this section, the Secretary shall, where appropriate, examine opportunities to include features for the reclamation, treatment, and reuse of flood water and stormwater associated with the project that will not result in— (1) a determination that the project is not economically justified; or (2) the limitation described in subsection (h)(1) conflicting with the required Federal share of the cost of the project. (g) Stormwater-Related projects For any project for stormwater management implemented under this section, the Secretary shall include management of stormwater that flows at a rate of less than 800 cubic feet per second for the 10-percent flood. (h) Funding (1) Limitation Not more than $15,000,000 in Federal funds may be allocated under this section for a single project within a single specific geographic area, such as a city, town, or county. (2) Authorization of appropriations There is authorized to be appropriated to carry out this section $90,000,000 for each fiscal year. .”

    Also changed by S. 4367

  • Amends

    Section 527 of the Water Resources Development Act of 1996

    Not in the US Code

    The bill's instruction

    Section 527 of the Water Resources Development Act of 1996 (110 Stat. 3767) is amended by striking “$4,500,000” and inserting “$8,000,000”.
  • Amends

    Section 5082 of the Water Resources Development Act of 2007

    Not in the US Code

    Subsections (i)

    The bill's instruction

    Section 5082(i) of the Water Resources Development Act of 2007 (121 Stat. 1226) is amended by striking “$40,000,000” and inserting “$45,000,000”.
  • Amends

    Section 5085 of the Water Resources Development Act of 2007

    Not in the US Code

    Subsections (i)

    The bill's instruction

    Section 5085(i) of the Water Resources Development Act of 2007 (121 Stat. 1228) is amended by striking “$17,000,000” and inserting “$22,000,000”.
  • Amends

    Section 5113 of the Water Resources Development Act of 2007

    Not in the US Code

    The bill's instruction

    Section 5113 of the Water Resources Development Act of 2007 (121 Stat. 1237) is amended in subsection (f) by striking “$13,000,000” and inserting “$50,000,000”.
  • Amends

    Section 5138 of the Water Resources Development Act of 2007

    Not in the US Code

    The bill's instruction

    Section 5138 of the Water Resources Development Act of 2007 (121 Stat. 1250; 136 Stat. 3821) is amended in subsection (i) by striking “$80,000,000” and inserting “$200,000,000”.
  • Amends

    Section 5140 of the Water Resources Development Act of 2007

    Not in the US Code

    The bill's instruction

    Section 5140 of the Water Resources Development Act of 2007 (121 Stat. 1251) is amended in subsection (i) by striking “$40,000,000” and inserting “$100,000,000”.
  • Amends

    Section 552 of the Water Resources Development Act of 1996

    Not in the US Code

    Subsections (a)

    The bill's instruction

    Section 552(a) of the Water Resources Development Act of 1996 (110 Stat. 3780; 136 Stat. 3821) is amended by adding at the end the following: “ (3) Considerations In carrying out this section, the Secretary may consider natural and nature-based infrastructure. .”
  • Amends

    Section 593 of the Water Resources Development Act of 1999

    Not in the US Code

    Subsections (h)

    The bill's instruction

    Section 593(h) of the Water Resources Development Act of 1999 (113 Stat. 380; 119 Stat. 2255; 136 Stat. 3820) is amended by striking “$100,000,000” and inserting “$150,000,000”.
  • Amends

    Section 594 of the Water Resources Development Act of 1999

    Not in the US Code

    The bill's instruction

    Section 594 of the Water Resources Development Act of 1999 (113 Stat. 381; 119 Stat. 2261; 121 Stat. 1140; 121 Stat. 1944; 136 Stat. 3821) is amended in subsection (h) by striking “$250,000,000” and inserting “$300,000,000”.
  • Amends

    Section 595 of the Water Resources Development Act of 1999

    Not in the US Code

    The bill's instruction

    Section 595 of the Water Resources Development Act of 1999 (113 Stat. 383; 117 Stat. 139; 117 Stat. 142; 117 Stat. 1836; 118 Stat. 440; 121 Stat. 1219; 123 Stat. 2851; 128 Stat. 1316; 130 Stat. 1681; 134 Stat. 2719; 136 Stat. 3822) is amended— (i) in subsection (c)(1)— (I) by inserting by inserting “, including natural and nature-based infrastructure” after “water-related environmental infrastructure”; (II) in subparagraph (C), by striking “and” at the end; and (III) by adding at the end the following: “ (E) drought resilience measures; and ; and” (ii) in subsection (i)— (I) in paragraph (1), by striking “$800,000,000” and inserting “$850,000,000”; and (II) in paragraph (2), by striking “$200,000,000” and inserting “$250,000,000”.
  • Amends

    Section 6001 of the Water Resources Reform and Development Act of 2014

    Not in the US Code

    Subsections (e)

    The bill's instruction

    Notwithstanding the operation of section 6001(e) of the Water Resources Reform and Development Act of 2014 (as in effect on the day before the date of enactment of the Water Resources Development Act of 2016), any project included on a list published by the Secretary pursuant to such section the authorization for which is amended by this subsection remains authorized to be carried out by the Secretary.
  • Amends

    Section 8319 of the Water Resources Development Act of 2022

    Not in the US Code

    Subsections (e)(1)

    The bill's instruction

    Section 8319(e)(1) of the Water Resources Development Act of 2022 (136 Stat. 3785) is amended by striking “$50,000,000” and inserting “$100,000,000”.
  • Amends

    Section 8359 of the Water Resources Development Act of 2022

    Not in the US Code

    The bill's instruction

    Section 8359 of the Water Resources Development Act of 2022 (136 Stat. 3802) is amended— (i) in subsection (e)(1), by striking “$50,000,000” and inserting “$100,000,000” ; and (ii) in subsection (f), by inserting “Lincoln,” after “Lane,”.
  • Amends

    33 U.S.C. 2326a

    Dredged material disposal facility partnerships

    Subsections (b)

    No AI explanation of this change yet.

    The bill's instruction

    Section 217(b) of the Water Resources Development Act of 1996 (33 U.S.C. 2326a(b)) is amended— (1) by amending paragraph (1) to read as follows: “ (1) In general (A) Non-Federal use The Secretary— (i) at the request of a non-Federal entity, may permit the use of any dredged material disposal facility under the jurisdiction of, or managed by, the Secretary by the non-Federal entity if the Secretary determines that such use will not reduce the availability of the facility for the authorized water resources development project on a channel in the vicinity of the disposal facility; (ii) at the request of a non-Federal entity, shall permit the non-Federal entity to use a non-Federal disposal facility for the disposal of material dredged by the non-Federal entity, regardless of any connection to a Federal navigation project, if— (I) permission for such use has been granted by the owner of the non-Federal disposal facility; and (II) the Secretary determines that the dredged material disposal needs required to maintain, perform authorized deepening, or restore the navigability and functionality of authorized navigation channels in the vicinity of the non-Federal disposal facility for the 20-year period following the date of the request, including all planned and routine dredging operations necessary to maintain such channels for the authorized purposes during such period, can be met by the available gross capacity of other dredged material disposal facilities in the vicinity of the non-Federal disposal facility; and (iii) shall impose fees to recover capital, operation, and maintenance costs associated with such uses. (B) Determinations The Secretary shall— (i) delegate determinations under clauses (i) and (ii)(II) of subparagraph (A) to the District Commander of the district in which the relevant disposal facility is located; and (ii) make such determinations not later than 90 days after receiving the applicable request. ;” (2) in paragraph (2)— (A) in the paragraph heading, by striking “Use of fees” and inserting “Fees”; (B) by striking “Notwithstanding” and inserting the following: “ (A) Use Notwithstanding ; and” (C) by adding at the end the following: “ (B) Reduction in amount In collecting any fee under this subsection, the Secretary shall reduce the amount imposed under paragraph (1)(A)(iii) to account for improvements made to the non-Federal disposal facility by the non-Federal entity to recover the capacity of the non-Federal disposal facility. ; and” (3) by adding at the end the following: “ (3) Disposition studies (A) Requirement Upon request by the owner of a non-Federal disposal facility, the Secretary shall carry out a disposition study of the non-Federal disposal facility, in accordance with section 1168 of the Water Resources Development Act of 2018 (33 U.S.C. 578b), if— (i) the Secretary has not used the non-Federal disposal facility for the disposal of dredged material during the 20-year period preceding the date of the request; and (ii) the Secretary determines that the non-Federal disposal facility is not needed for such use by the Secretary during the 20-year period following the date of the request. (B) Conclusive presumptions For purposes of carrying out a disposition study required under subparagraph (A), the Secretary shall— (i) consider the non-Federal disposal facility to be a separable element of a project; and (ii) consider a Federal interest in the non-Federal disposal facility to no longer exist. (4) Definitions In this subsection: (A) Gross capacity The term “gross capacity” means the total quantity of dredged material that may be placed in a dredged material disposal facility, taking into consideration any additional capacity that can be constructed at the facility. (B) Non-Federal disposal facility The term “non-Federal disposal facility” means a dredged material disposal facility under the jurisdiction of, or managed by, the Secretary that is owned by a non-Federal entity. .”

    Also changed by S. 4367